Redbridge: what your submission needs to address.
Redbridge identifies both fixed plant and transport in its assessment scope, including working-site machinery where relevant.
Sources to include
Assess relevant pollutants from boilers, emergency generators and transport. Industrial and waste sites may also need on-site vehicle and mobile-machinery emissions.
Early design
A preliminary assessment can identify significant sources, site constraints, suitable uses and design measures before the scheme is fixed.
Positive statement
The list specifies an Air Quality Positive route for qualifying major EIA and Mayoral-referral development. Check the listed categories for the proposal.
Local source and review status
Local and national validation list, April 2024 →
Published council guidance · Reviewed 20 October 2026.