An Arboricultural Impact Assessment that connects your proposed development with the trees it could affect.
ACP reviews the layout, construction requirements and tree evidence together. We identify conflicts, examine practical design responses and prepare a clear account of the proposal’s arboricultural implications.
From baseline to proposal
An AIA explains the relationship between an actual proposal and the relevant trees. Start with the current survey, drawings and planning request so the assessment answers the right question.
01 / NEW SUBMISSION
Assess the proposed development and identify retention, removal, works and protective measures relevant to the submission.
Explore the assessment →02 / DESIGN DEVELOPMENT
Review an extension, access route, service connection or revised site arrangement while alternatives can still be considered.
See the design review →03 / COUNCIL COMMENTS
Examine the specific issue raised and the evidence behind it. Define whether a drawing change, further investigation or updated assessment is needed.
Share the comments →Review the full development footprint
The assessment should follow the works from demolition and access through construction to the completed development. We identify the relevant interfaces and the design information needed to evaluate them.
| Design interface | What we review | What the project team needs to resolve |
|---|---|---|
| Buildings and excavation | The proposed footprint, working space and available foundation information. | Whether the layout and construction assumptions can be coordinated with retained trees. |
| Access and temporary logistics | Delivery routes, compounds, lifting arrangements and practical space for construction. | How the scheme can be built without relying on unassessed access or storage areas. |
| Drainage and utilities | Routes, connection points and the excavation or installation methods proposed. | Potential conflicts that may sit outside the main building footprint. |
| Levels and surfacing | Changes to existing levels, hard surfaces and relevant ground conditions. | The implications for rooting space and the detail needed to assess any proposed solution. |
| Crowns and future relationships | Branch clearance, growth and relationships with buildings and occupied spaces. | Whether the design creates pressure for repeated pruning or later tree loss. |
| Retention, loss and planting | Which trees would remain, be removed or require works, and why. | A consistent design response with landscape and biodiversity proposals. |
Evidence into design
We work from the current drawing set and record what has been assessed. Where there is a conflict, the report should explain the response rather than leave it hidden in a plan overlay.
A practical assessment, not a drawing stamp
The AIA should make the reasoning easy for the client, designer and reviewing officer to follow. Its conclusions need to stay connected to the actual information assessed.
The survey category helps describe retention value. It is considered with the tree’s context, constraints and the proposed works.
A category alone does not authorise removal or decide the planning outcome.
Where the proposal affects rooting space, assess the specific interface and available alternatives. Record the evidence needed for any specialist construction approach.
Engineering design and arboricultural review must work together; moving a protection outline is not a design justification.
Identify these features early and assess the relevant standing advice and wider effects. Their protection should not be treated as an ordinary survey constraint.
Natural England / Forestry Commission: ancient woodland and veteran trees →Describe replacement or new planting where it forms part of the response. Align it with the landscape design, available growing space and relevant biodiversity evidence.
The AIA should make any unresolved design dependency explicit.
Illustrative design coordination
A proposal places a building outside the illustrated rooting constraint, but the proposed connection route crosses it. The AIA brief needs to examine both elements.
01 / IDENTIFY
Use the same tree references and base plan to show where the route interacts with the constraint. Confirm the depth and method information needed.
02 / COORDINATE
Discuss available alternatives with the designer. Check whether the revised route creates another issue with access, levels or neighbouring trees.
03 / DOCUMENT
Record the chosen proposal and any design conditions, further investigation or construction-method detail needed. Keep the AIA aligned with the drawings.
A connected submission
The agreed scope identifies the assessment report, supporting plans and design-response work. We clarify whether new survey information or later construction documents are included.
Scope, fees & programme
An AIA depends on the complexity of the tree interactions and how much coordination is needed. We review the available information before confirming the fee and programme.
England · your site and authority
Discuss projects in Greater London, the South East, East of England and the Midlands, or elsewhere in England. Share the site postcode and council request so we can confirm the scope, survey arrangements and availability.
We identify the planning authority and review its actual request. A county name does not establish which documents or conditions apply to a site.
Bring the architect’s layout, engineering information and relevant ecology work together. Agree the assessment boundaries, access and responsibilities before commissioning.
Before you commission
A short description of the design and the council’s request helps us define a useful assessment.
It examines the effects of a proposed development on relevant trees and explains how the design responds. It uses the tree baseline alongside the actual works and drawings.
The wording is sometimes used for a similar planning purpose. We check the required deliverables and the authority’s request so the commission answers the correct question.
An assessment can support design development. The quotation should define the proposal stage and review iterations, then identify the final drawing set for the submission.
We can review the available survey, its scope and currency. If it is suitable for the current proposal, the quotation can identify how it will be used and any information requiring update.
It may be part of a combined package, but the documents have different functions. We state explicitly which plans, method statements and construction details are included.
We assess the specific issue, alternatives and information needed. Any proposed specialist solution requires appropriate arboricultural and engineering input and relevant approval; feasibility is not assumed.
The planning authority determines the proposal. The AIA provides a reasoned account of the impacts and design response, with limitations and outstanding matters made clear.
No. Where foundations, protected species or habitat effects need specialist input, those scopes should be coordinated with the arboricultural assessment. We identify relevant interfaces in the brief.
Let’s define the right scope
Start with your email and a short project outline. We will clarify the information needed and prepare a site-specific quotation.
Your site, proposed works and the tree information requested.
A consultant can request the current layout, tree reports and council comments.
Understand the deliverables, programme and any additional work.