Biodiversity net gain · Planning & development

BNG assessments.
Clear evidence.
Practical decisions.

Biodiversity net gain consultancy that connects your habitat survey, site design and planning requirements.

From the first baseline to a coordinated delivery strategy, ACP helps you understand the constraints, test the options and commission the right work.

Site-specific ecological adviceSurvey, metric & design coordinationClear scope & project feesSupport through planning stages
THE SITE IS MORE THAN ITS RED LINE
Conceptual existing and proposed habitat plans, with numbered retention and design decisions.
Read the site before fixing the solution.Habitat evidence helps your design team understand what can be retained, what may change and which options need testing.1 — Retain valuable boundary habitat. 2 — Coordinate the built layout. 3 — Test proposed habitats against the evidence.

Start from your project

Choose the help you need now.

Use your current planning stage to shape the enquiry. If you already have evidence, we will review what can be used before proposing further work.

This is a scoping guide, not an automatic exemption or compliance decision. Your site and permission determine the next step.

Bring your current plans and planning request.

We will review the existing evidence and identify the appropriate scope.

  • Site location and red-line plan
  • Planning stage and council comments
  • Existing surveys and metric, if available
Discuss this scope →

Commission the right work

One brief. The right ecological inputs.

A BNG assessment brings together evidence and design decisions. The survey records the habitats; the metric tests the proposal; the reporting explains how the result can be delivered.

01 / ESTABLISH

Habitat survey & baseline

Identify and map the habitats within the site boundary. Record the evidence needed for classification and, where required, condition assessment.

See how the evidence is used →

02 / TEST

Metric & design options

Compare the baseline with the proposed layout. Examine habitat losses, retention, creation and enhancement while there is still time to influence design.

Understand the calculation →

03 / COORDINATE

Planning & delivery advice

Explain the assessment, remaining dependencies and next documents. Where permission is granted, move into a defined Gain Plan scope.

Explore the Gain Plan service →

Evidence you can trace

From a habitat parcel to a design decision.

A credible calculation starts with a credible baseline.

We examine how habitat mapping, survey observations and condition evidence support the inputs. Then we compare those inputs with the development and landscape drawings.

Consistent parcel references make the assessment easier to review. They also help the design team see the effect of changing an access road, drainage feature or landscape area.

  1. Define the boundary and available evidence

    Review the red-line plan, previous surveys, site history and the proposed works. Confirm what fieldwork is needed.

  2. Classify and map the habitats

    Use habitat evidence appropriate to the metric. Explain access restrictions, seasonal limitations and any specialist inputs.

  3. Compare the proposed design

    Reconcile retained, lost and proposed habitats with current drawings. Make assumptions visible before they become commitments.

  4. Set out the delivery route

    Identify the further design, management or off-site evidence needed and who should provide it.

Beyond a headline percentage

What changes the BNG result?

Habitat size alone does not determine biodiversity value. The statutory metric also considers habitat type, condition and strategic significance. New habitat proposals carry time and delivery risks.

InputWhat we examineWhy it matters to the scheme
Baseline evidenceHabitat parcels, areas or lengths, classification and supporting observations.A change in the baseline can change the design’s starting position.
Proposed habitatsTarget habitat, achievable condition and the space available for establishment.Landscape labels need to translate into deliverable ecological proposals.
Time and difficultyHow long a proposed habitat takes to establish and the risk of achieving it.A small area of ambitious habitat is not automatically the best solution.
Rules and spatial contextRelevant metric rules, strategic significance and off-site location where applicable.Check the detailed result, not only the summary gain figure.

We select the appropriate statutory tool. Eligibility for the Small Sites Metric is a separate question from exemption. Official metric guidance →

Keep drawings aligned

The access road, drainage layout and landscape scheme should use a consistent revision. A late change can affect several habitat parcels.

Test buildable options

Consider servicing, shading, public access and the practical maintenance regime when discussing habitat proposals with the design team.

Define the missing evidence

If off-site provision or specialist habitat assessment is needed, identify it clearly. Separate confirmed inputs from outstanding decisions.

An agreed, usable output

More than a workbook.

Your quotation defines the package for your planning stage. The aim is evidence your architect, planner and landscape team can use together.

  • Mapped habitat evidenceBaseline information, parcel references and relevant survey findings, with limitations explained.
  • Coordinated calculationThe appropriate metric and a record of the proposal and assumptions assessed.
  • Assessment and design adviceA clear account of the result, options discussed and unresolved delivery requirements.
  • A defined next stageAdvice on Gain Plan, management, off-site evidence or further survey work where relevant.

Already have a survey or metric? Send it with your plans. We can scope a review or update instead of assuming the work must start again.

Discuss existing evidence →

Costs, scope & programme

Separate the assessment fee from delivery costs.

The consultancy fee depends on the habitats, site complexity, available evidence and work required. We confirm the scope, deliverables and programme in writing.

Habitat works, unit purchases, legal agreements and future management can create separate costs. Identifying these early gives you a clearer basis for project decisions.

What helps us quote accurately?

  • Your site and planning stagePostcode, red-line boundary, proposal and intended programme.
  • Existing ecological evidenceReports, survey dates, mapped habitats and an editable metric if available.
  • The latest drawingsProposed layout, landscape design and council comments.
  • The help you needA new assessment, a design update, a submission package or a response to a specific query.

Before you commission

Clear answers for your next decision.

We support BNG projects in England. The relevant planning authority, site evidence and application stage shape the assessment.

01Do I need a survey, an assessment or a Gain Plan?

A survey supplies habitat evidence. An assessment uses that evidence to evaluate the development. A Biodiversity Gain Plan brings the required delivery evidence together for the gain condition. Tell us your planning stage and share the council’s request; we will define the relevant scope.

02Can you use work prepared by another consultant?

We can review existing reports, drawings and calculations. Their age, scope, site changes and supporting evidence determine whether they are suitable. The quotation will identify any gaps and further work, rather than assuming a complete restart.

03Does every development need to achieve 10%?

England’s statutory objective is at least 10% for development within scope. Exemptions and transitional arrangements apply. Local policy can also be relevant. We check the planning route before treating a percentage as the project brief.

04Is a small development automatically exempt?

No. Establish which exemption, if any, applies using the application date, boundary and habitat impacts. Also distinguish exemption from eligibility to use the Small Sites Metric. Share the red-line plan and planning history so the position can be reviewed.

05Can the design change after the assessment?

Yes, but the evidence may need updating. Changes to hardstanding, habitat areas, drainage or the landscape specification can affect the calculation. Keep the approved design, metric and associated plans coordinated.

06Can you advise on off-site provision?

Where relevant, we can identify the assessment inputs and evidence needed for an off-site route. Unit purchase, registration, allocation and legal arrangements are distinct steps. The scope will explain the support included and any other advisers required.

07Is BNG a replacement for protected-species surveys?

No. Habitat accounting does not resolve every ecological constraint. Protected species, designated sites and other planning ecology requirements may need separate consideration. We can identify relevant interfaces when reviewing your brief.

08How soon can the work be completed?

Timing depends on site access, survey suitability, evidence quality and the availability of current drawings. We will confirm a realistic programme after reviewing your information. Council determination is a separate part of the project timetable.

Let’s define the right scope

Tell us where your project is heading.

Start with your email and a short project outline. We will clarify the information needed and prepare a site-specific quotation.

  1. Share the essentials

    Your site, planning stage and the help you need.

  2. We review the available evidence

    A consultant can request drawings, council comments and previous reports.

  3. Receive a defined scope and fee

    Understand the deliverables, programme and any additional work.

0330 236 7329

Have plans or a decision notice? Submit the enquiry first. We can then request the relevant files together, so your brief stays clear.

Request a BNG quotation

A clear starting point.

Your enquiry goes to ACP Consultants. See our privacy policy.

Technical sources & further reading

Technical framework checked on 26 October 2026. The appropriate requirements depend on the application and permission.

Ecological evidence. Practical decisions.© 2026 ACP Consultants Ltd
Discuss your BNG project →