01 / ESTABLISH
Habitat survey & baseline
Identify and map the habitats within the site boundary. Record the evidence needed for classification and, where required, condition assessment.
See how the evidence is used →Biodiversity net gain · Planning & development
Biodiversity net gain consultancy that connects your habitat survey, site design and planning requirements.
From the first baseline to a coordinated delivery strategy, ACP helps you understand the constraints, test the options and commission the right work.
Start from your project
Use your current planning stage to shape the enquiry. If you already have evidence, we will review what can be used before proposing further work.
This is a scoping guide, not an automatic exemption or compliance decision. Your site and permission determine the next step.
We will review the existing evidence and identify the appropriate scope.
Commission the right work
A BNG assessment brings together evidence and design decisions. The survey records the habitats; the metric tests the proposal; the reporting explains how the result can be delivered.
01 / ESTABLISH
Identify and map the habitats within the site boundary. Record the evidence needed for classification and, where required, condition assessment.
See how the evidence is used →02 / TEST
Compare the baseline with the proposed layout. Examine habitat losses, retention, creation and enhancement while there is still time to influence design.
Understand the calculation →03 / COORDINATE
Explain the assessment, remaining dependencies and next documents. Where permission is granted, move into a defined Gain Plan scope.
Explore the Gain Plan service →Evidence you can trace
A credible calculation starts with a credible baseline.
We examine how habitat mapping, survey observations and condition evidence support the inputs. Then we compare those inputs with the development and landscape drawings.
Consistent parcel references make the assessment easier to review. They also help the design team see the effect of changing an access road, drainage feature or landscape area.
Review the red-line plan, previous surveys, site history and the proposed works. Confirm what fieldwork is needed.
Use habitat evidence appropriate to the metric. Explain access restrictions, seasonal limitations and any specialist inputs.
Reconcile retained, lost and proposed habitats with current drawings. Make assumptions visible before they become commitments.
Identify the further design, management or off-site evidence needed and who should provide it.
Beyond a headline percentage
Habitat size alone does not determine biodiversity value. The statutory metric also considers habitat type, condition and strategic significance. New habitat proposals carry time and delivery risks.
| Input | What we examine | Why it matters to the scheme |
|---|---|---|
| Baseline evidence | Habitat parcels, areas or lengths, classification and supporting observations. | A change in the baseline can change the design’s starting position. |
| Proposed habitats | Target habitat, achievable condition and the space available for establishment. | Landscape labels need to translate into deliverable ecological proposals. |
| Time and difficulty | How long a proposed habitat takes to establish and the risk of achieving it. | A small area of ambitious habitat is not automatically the best solution. |
| Rules and spatial context | Relevant metric rules, strategic significance and off-site location where applicable. | Check the detailed result, not only the summary gain figure. |
We select the appropriate statutory tool. Eligibility for the Small Sites Metric is a separate question from exemption. Official metric guidance →
The access road, drainage layout and landscape scheme should use a consistent revision. A late change can affect several habitat parcels.
Consider servicing, shading, public access and the practical maintenance regime when discussing habitat proposals with the design team.
If off-site provision or specialist habitat assessment is needed, identify it clearly. Separate confirmed inputs from outstanding decisions.
An agreed, usable output
Your quotation defines the package for your planning stage. The aim is evidence your architect, planner and landscape team can use together.
Already have a survey or metric? Send it with your plans. We can scope a review or update instead of assuming the work must start again.
Discuss existing evidence →Costs, scope & programme
The consultancy fee depends on the habitats, site complexity, available evidence and work required. We confirm the scope, deliverables and programme in writing.
Habitat works, unit purchases, legal agreements and future management can create separate costs. Identifying these early gives you a clearer basis for project decisions.
Before you commission
We support BNG projects in England. The relevant planning authority, site evidence and application stage shape the assessment.
A survey supplies habitat evidence. An assessment uses that evidence to evaluate the development. A Biodiversity Gain Plan brings the required delivery evidence together for the gain condition. Tell us your planning stage and share the council’s request; we will define the relevant scope.
We can review existing reports, drawings and calculations. Their age, scope, site changes and supporting evidence determine whether they are suitable. The quotation will identify any gaps and further work, rather than assuming a complete restart.
England’s statutory objective is at least 10% for development within scope. Exemptions and transitional arrangements apply. Local policy can also be relevant. We check the planning route before treating a percentage as the project brief.
No. Establish which exemption, if any, applies using the application date, boundary and habitat impacts. Also distinguish exemption from eligibility to use the Small Sites Metric. Share the red-line plan and planning history so the position can be reviewed.
Yes, but the evidence may need updating. Changes to hardstanding, habitat areas, drainage or the landscape specification can affect the calculation. Keep the approved design, metric and associated plans coordinated.
Where relevant, we can identify the assessment inputs and evidence needed for an off-site route. Unit purchase, registration, allocation and legal arrangements are distinct steps. The scope will explain the support included and any other advisers required.
No. Habitat accounting does not resolve every ecological constraint. Protected species, designated sites and other planning ecology requirements may need separate consideration. We can identify relevant interfaces when reviewing your brief.
Timing depends on site access, survey suitability, evidence quality and the availability of current drawings. We will confirm a realistic programme after reviewing your information. Council determination is a separate part of the project timetable.
Let’s define the right scope
Start with your email and a short project outline. We will clarify the information needed and prepare a site-specific quotation.
Your site, planning stage and the help you need.
A consultant can request drawings, council comments and previous reports.
Understand the deliverables, programme and any additional work.
Request a BNG quotation
Your enquiry goes to ACP Consultants. See our privacy policy.
Technical framework checked on 26 October 2026. The appropriate requirements depend on the application and permission.