01 / PLANNING & DESIGN
New or expanded operations
Assess the defined proposal, identify important source contributions and compare relevant control or discharge options before the design is fixed.
Plan the study →Industrial odour · Emissions & dispersion
Understand how your operation could affect neighbouring uses, and what changes can make a difference.
ACP scopes industrial odour assessments and dispersion studies around the source data, operating scenarios and decision you need to support. Connect the model with a practical control and design brief.
Start with the operation
A new facility, an expanded process and a nearby residential proposal need different scenario definitions. We establish the decision and data requirements before agreeing the modelling commission.
01 / PLANNING & DESIGN
Assess the defined proposal, identify important source contributions and compare relevant control or discharge options before the design is fixed.
Plan the study →02 / PERMITTING & OPERATIONS
Review the permit context, operating information and request for further evidence. Separate the modelling task from the operator’s wider compliance responsibilities.
Review the required inputs →03 / SITE ALLOCATION & DEVELOPMENT
Identify the existing sources and proposed receiving locations. Agree the evidence needed to assess the relationship between the development and surrounding activities.
Understand the assessment →Build a traceable evidence base
Source information must describe the operation being assessed. We distinguish measured data, supplier information and assumptions, then identify which gaps could materially affect the findings.
| Input | Questions to resolve | Why it matters |
|---|---|---|
| Odour emissions | Which sources release odour? What data describe their emission rates and variation? | The model needs a representative source inventory, including relevant channelled and diffuse releases. |
| Release conditions | What are the outlet location, dimensions, flow, temperature and discharge characteristics? | Release conditions influence how emissions enter and disperse in the atmosphere. |
| Buildings and terrain | Which structures and surrounding features need representation? | Nearby geometry can influence plume behaviour and exposure at relevant locations. |
| Meteorology | Which weather data appropriately represent the site and assessment purpose? | Wind and atmospheric conditions affect transport and dispersion over time. |
| Receptors | Which existing or proposed uses, locations and heights need assessment? | The reporting points must answer the actual development and neighbour-exposure questions. |
| Operating scenarios | What constitutes the current operation, proposal, controls and relevant adverse conditions? | The comparison must reflect plausible operation and clearly stated dependencies. |
From information to interpretation
We make the assumptions visible throughout the commission. That allows the operator, project team and reviewer to understand what each scenario represents.
Read more than the contour
A coloured map is one part of the evidence. The report must explain the assessment basis and what the predictions mean for the operation, design and receiving environment.
Identify the applicable assessment approach and reporting metric. Explain the relationship between the selected criterion, odour characteristics and assessment context.
A model statistic is not a prediction of exactly what every person will smell at every moment.
If a result assumes an abatement efficiency or restricted operating condition, make that dependency explicit. Obtain the evidence needed to support the assumption.
The design team and operator should understand what must remain true for the assessment to represent the proposal.
Discuss the sensitivity of the conclusion to emissions, operating patterns and other material inputs. Scope additional scenarios where they would change a project decision.
Record missing information clearly so later revisions can be targeted.
Compare relevant containment, treatment, outlet or operational options. Explain the environmental implications alongside the design information still needed.
Detailed equipment selection and installation can then follow a defined performance brief.
An illustrative design comparison
A project team is considering a revised exhaust arrangement and additional treatment. An agreed study can compare the current design with each option while keeping other assumptions transparent.
01 / BASELINE
Record the source data, operation and discharge arrangement so the comparison has a clear reference. Avoid mixing old and revised drawings.
02 / ALTERNATIVES
Compare relevant outlet or treatment scenarios. Document exactly what changes between runs and what remains assumed.
03 / DECISION
Explain the relative results, residual issues and evidence needed to support the preferred option. A higher outlet alone is not a universal solution.
A reviewable technical record
The agreed package should allow another competent reviewer to follow the study. We define the report, supporting schedules and any model-file handover in the quotation.
Fees, information & programme
The number of sources, scenarios, information gaps and reporting requirements shape the fee. We confirm what is included before starting the technical work.
England · your local requirement
We welcome odour enquiries across England. Share the postcode, proposed activity and planning authority or regulator request. We will confirm the technical scope, site arrangements and programme.
Include the planning reference and exact wording of the requirement. We connect the assessment to the submitted drawings, local context and decision that needs supporting.
Share the relevant permit, process description and operating changes. We identify the operational evidence and specialist inputs needed before confirming our quotation.
Before you commission
Start with the decision and the available source information. We will help identify a proportionate study.
It can support decisions where quantitative predictions and scenario comparisons are needed. The source complexity, potential exposure, available data and authority request determine whether it is appropriate.
Sometimes other evidence can support a defined assessment. Its relevance and uncertainty must be examined. We review the available basis before deciding whether testing or additional scenarios are needed.
Both can use dispersion methods, but their emissions, metrics and assessment questions differ. If combustion pollutants or other substances also need assessment, we define that additional scope explicitly.
We can scope comparisons of agreed design scenarios. Provide the proposed technical data and evidence for treatment performance. The report will state which design and operating assumptions support each result.
No. Predictions represent a defined model and its inputs. Odour experience also depends on real operating and exposure conditions. The assessment must explain the limits of its findings.
Only where it is expressly included in the quotation. A model evaluates specified scenarios; an OMP sets out the operational controls and response. We can coordinate the two workstreams.
Yes. Share the report, authority comments and available input or model files. We can define a review of the assumptions, scenario coverage and information needed to answer the current request.
A short process description, postcode, site layout, proposed changes and authority correspondence. Mention existing emissions measurements, equipment data and any previous modelling.
Let’s define the right scope
Start with a short project outline. We will clarify the information needed and prepare a site-specific quotation.
Your site, activity and the planning or operational question.
A consultant can request drawings, operating information and authority comments.
Understand the deliverables, programme and any additional work.
Request an odour quotation
Your enquiry goes to ACP Consultants. See our privacy policy.
References checked on 27 October 2026. We confirm the relevant assessment guidance, authority request and operational scope for your project.