Odour · Planning & development

Odour assessment.
Clear evidence for planning.

Understand the odour risk. Resolve the design questions. Support your planning submission.

ACP’s odour consultants assess proposed activities and development near existing sources. We connect the operation, surrounding uses and authority request with a defined assessment and practical recommendations.

Source-to-receptor assessmentPractical design recommendationsPlanning & operational contextClear scope, fee & programme
READ THE SITE. DEFINE THE NEXT STEP.
Conceptual odour source, dispersion pathway and nearby homes.
The boundary is not the end of the assessment.Follow emissions from their source to the locations where people could experience them.1 Source and controls. 2 Dispersion pathway. 3 Sensitive uses. Illustration only; no predicted concentrations.

Define the decision

What is driving your odour assessment?

The starting point might be a new activity, a change to an existing facility or homes proposed near an established source. We build the assessment around that actual relationship.

01 / NEW OR CHANGING ACTIVITY

Assess the proposed source

Review the process, operating hours, material handling and discharge arrangement. Identify sensitive neighbours and the controls that need to form part of the proposal.

Explore the assessment →

02 / NEW SENSITIVE DEVELOPMENT

Understand the surroundings

Consider how existing industrial, waste, agricultural or other activities could affect the proposed use. Examine the site layout, exposure and evidence needed for the planning decision.

Review the technical questions →

03 / AUTHORITY REQUEST

Answer a defined requirement

Send the validation request, consultee comments or condition. We identify the report, supporting information or design response needed to address it.

Share the request →

A proportionate technical approach

Choose the evidence that answers the question.

A useful odour assessment explains how the conclusion was reached. We define the purpose of each method and how its findings will inform the development, rather than commissioning an unexplained bundle.

Assessment componentWhat it can establishHow we scope it
Desk-based source and receptor reviewThe operation, nearby sensitive uses, existing evidence and questions requiring investigation.Review the proposal, site setting, process information and authority correspondence.
Odour risk assessmentThe relationship between emission potential, transport and likely exposure at relevant locations.Describe the source, pathway and receptor assumptions, then consider the proposed controls.
Site odour observationsConditions and detectable odour during defined visits and operating circumstances.Agree the purpose, locations, timing, weather records and limitations of the observation programme.
Dispersion modellingPredicted exposure under specified emissions, weather and operating scenarios.Establish the data and model scope where quantitative assessment is needed. Explore odour modelling.
Management and mitigationMeasures that can support the assessment conclusions and operation.Separate design recommendations from the detailed responsibilities in an Odour Management Plan.

The questions behind the report

Technical depth that informs the design.

An odour source is more than a point on a map. The process and the way it operates can change what reaches neighbouring premises.

Characterise the operation

Review materials, storage, handling, treatment and releases. Ask when emissions occur, what changes during busy periods and which controls the proposal relies on.

A closed building with frequent vehicle access needs a different description from a continuously exhausted process or an open handling area.

Understand exposure and context

Consider the frequency, intensity, duration and character of odour alongside the sensitivity and use of the receiving location. Include relevant occupied outdoor areas and future uses.

Distances help describe the setting, but the same separation can mean different exposure with different sources, buildings and weather.

Test the design assumptions

Identify the proposed containment, treatment and discharge arrangement. Review the information needed to support claimed control performance and how it would be maintained.

We can compare agreed design options and show which assumptions must carry into the final drawings or operational brief.

Explain the uncertainty

State what is measured, supplied, assumed or still required. A short visit cannot represent every operating and weather condition.

Where information gaps affect the conclusion, the report should explain their significance and the next evidence needed.

Illustrative project decision

New homes beside an existing operation.

A developer is considering residential use near a facility with potential odour releases. The first task is to understand both the receiving development and the existing activity.

  • Establish the actual sourceIdentify relevant processes, operating patterns and available information. Consider the parts of the operation that could influence the proposed homes.
  • Relate the assessment to the layoutReview homes, gardens, balconies and other occupied locations. Use the current drawing revision so the assessment remains connected to the design.
  • Define a defensible responseSet out the evidence, any further investigation and the implications for design or deliverability. Clearly distinguish proposed changes from controls already in place.

Evidence your project team can use

A report with a clear line of reasoning.

Agree the deliverables at the outset, including the planning submission, technical appendices, design recommendations and any response to authority comments.

  • Project and decisionThe proposed activity or sensitive development, planning stage and assessment purpose.
  • Source and settingThe relevant processes, sensitive uses, site plans and evidence relied upon.
  • Methods and assumptionsThe selected approach, operating scenarios, observations or modelling where included.
  • Findings and implicationsA reasoned assessment that relates the evidence to the project and its surroundings.
  • Controls and dependenciesThe design or operational measures assumed, with information still required clearly identified.
  • A defined next stepThe submission, further study or agreed authority response needed to progress the project.

Fees & programme

Know what you are commissioning.

The fee depends on the source, site complexity, available information and evidence required. We provide a project-specific quotation once we understand the brief.

  • Start with the information you haveSend the location, proposed use and authority request. A consultant can then request drawings, operating details and any previous reports.
  • Separate the work stagesAgree whether the scope includes a site visit, observations, modelling, external sampling, a management plan or review of later design changes.
  • Plan around the evidenceAllow for access, representative operating conditions and any missing technical data. We identify these dependencies before confirming the programme.

England · your local requirement

Start with the site and the decision.

We welcome odour enquiries across England. Share the postcode, proposed activity and planning authority or regulator request. We will confirm the technical scope, site arrangements and programme.

Planning applications and conditions

Include the planning reference and exact wording of the requirement. We connect the assessment to the submitted drawings, local context and decision that needs supporting.

Permitted and operating facilities

Share the relevant permit, process description and operating changes. We identify the operational evidence and specialist inputs needed before confirming our quotation.

Before you commission

Clear answers before you instruct us.

Tell us what the authority has requested and what you are proposing. We will help define the assessment brief.

01What is an odour impact assessment?

It examines how odour from relevant activities could affect surrounding uses, or how a proposed use could be exposed to existing sources. The report explains the evidence, assessment method, conclusions and any control measures.

02Is an odour survey the same as an assessment?

A survey usually provides observations or measurements. An assessment interprets the relevant evidence for a defined decision. We clarify what the requested report needs before selecting site work.

03Does every project need dispersion modelling?

No. The required evidence depends on the source, risk, available information and authority request. We explain when qualitative assessment, site observations or a detailed model would contribute to the decision.

04Can you assess a development near an existing odour source?

Yes. Share the proposed use, site layout and nearby activity. We will identify the available source information and any further work needed to assess the proposed receiving environment.

05Does a planning report also satisfy an environmental permit?

No. IAQM’s September 2026 guidance addresses planning; it does not replace Environment Agency permitting guidance. Tell us whether you need planning evidence, permit support or both. We will identify the applicable method, guidance edition and decision criteria in the report.

06Can you respond to environmental health comments?

We can review the exact comments against the submitted report and proposal. Our quotation will identify any additional evidence, revised assessment or technical response included.

07Can you guarantee planning approval?

The authority determines the application. Our role is to provide clear technical evidence, explain the findings and identify practical recommendations within the agreed scope.

08What should I send first?

The postcode, proposed use, project stage and council or regulator request are enough to start. Include a short description of any relevant activity nearby and mention existing reports or drawings.

Let’s define the right scope

Tell us where your project is heading.

Start with a short project outline. We will clarify the information needed and prepare a site-specific quotation.

  1. Share the essentials

    Your site, activity and the planning or operational question.

  2. We review the available evidence

    A consultant can request drawings, operating information and authority comments.

  3. Receive a defined scope and fee

    Understand the deliverables, programme and any additional work.

0330 236 7329

Have plans, process details or authority comments? Submit the enquiry first. We can then request the relevant files together, so your brief stays clear.

Request an odour quotation

A clear starting point.

Your enquiry goes to ACP Consultants. See our privacy policy.

Technical sources & further reading

References checked on 27 October 2026. We confirm the relevant assessment guidance, authority request and operational scope for your project.

Understand the source. Define the response.© 2026 ACP Consultants Ltd