RESTAURANTS · TAKEAWAYS · EXTRACTION SYSTEMS

Commercial-kitchen noise & odour assessments.

Design kitchen extraction around the business and its neighbours. ACP assesses noise and odour risks, reviews the proposed system and provides clear technical advice for planning.

Connect cooking activity, extraction performance and nearby sensitive uses before the duct route, fan and discharge arrangement are fixed.

Noise & odour considered togetherSource-to-receiver assessmentPractical extraction design adviceClear planning evidence
ACOUSTIC EVIDENCE → PRACTICAL DESIGN
Section through a restaurant kitchen with cooking canopy, grease capture, odour-control equipment, fan and attenuation, a vertical discharge and a neighbouring upper-floor window. Sound and odour follow different paths.
One extraction system. Two environmental questions.Noise control, odour treatment and dispersion must be considered together. A quieter fan does not remove cooking odours, and filtration does not establish acceptable noise.View the detailed illustration →
Read the illustration description

Section through a restaurant kitchen with cooking canopy, grease capture, odour-control equipment, fan and attenuation, a vertical discharge and a neighbouring upper-floor window. Sound and odour follow different paths.

DEFINE THE BRIEF

Support the business.
Protect the neighbouring use.

Cooking type, throughput, hours and the surrounding buildings shape the assessment. We review the actual operation and the proposed extraction design, including homes above or beside the premises.

01 / A COORDINATED SUBMISSION

Noise & odour for planning

Bring the two assessment scopes together around the proposed use, extraction system and local authority request.

Explore the combined brief →
02 / SOUND & VIBRATION

Extraction-fan noise

Assess the relevant fan, duct and other plant contributions. Review sound character, operating periods and vibration transmission where appropriate.

Explore extraction noise →
03 / COOKING EMISSIONS

Odour risk & control

Review cooking activity, odour potential, sensitive locations, treatment and the proposed discharge arrangement.

Explore odour assessment →

TAILOR YOUR PROJECT BRIEF

Direct link to this version →

Start with the operation and the council request.

Share the site, cooking methods, hours and extraction proposal. We will identify the required noise and odour assessment scope.

Include any existing report, planning condition or environmental health comments.

SURVEY · ASSESS · COORDINATE

Understand the operation.
Coordinate the system.

We start with what will be cooked, how much, when and how emissions will be extracted. Then we connect the environmental assessment with the designer’s proposed equipment and layout.

Parallel kitchen assessment pathways for noise and odour. Noise reviews source sound, sound paths and acoustic controls. Odour reviews cooking activity, treatment and dispersion. Both require coordinated design and maintenance.
Agree the environmental performance brief with the extraction designer. Treatment, attenuation and duct arrangements interact through airflow, pressure loss and maintenance needs.View the full-size diagram →
  1. Define the business and sensitive uses

    Review the menu, cooking methods, anticipated throughput, hours and nearby homes or other sensitive locations. Include premises above the kitchen and future uses where relevant.

  2. Review the extraction design

    Obtain the canopy, duct, fan, treatment and discharge details. Identify equipment data, access, plant locations and the assumptions that need confirmation.

  3. Assess noise and odour separately

    Use the relevant acoustic method and a proportionate odour assessment. Consider existing conditions, the source-to-receiver paths and any further evidence needed.

  4. Set out the coordinated response

    Describe practical controls, performance requirements and operating assumptions. Record maintenance needs, design dependencies and any verification or condition response.

Design changes need a joined-up review.

Adding treatment or attenuation can change pressure losses and the fan duty. The extraction designer must coordinate airflow and system performance with the environmental recommendations.

THE DETAILS THAT SHAPE THE ANSWER

Follow the emissions
from cooking to the neighbour.

An assessment needs more than a fan model and a filter description. We review the linked questions that determine whether the proposal can be supported with meaningful evidence.

ConsiderationWhat the assessment needs to address
Cooking and throughputIdentify cooking methods, menu, equipment and expected intensity. Frying, grilling and other processes can create different odour and grease-control demands.
Operating hoursConsider preparation, service, cleaning and plant run-on, including evening or night-time periods. The extraction may operate beyond the customer opening hours.
Sensitive receiversIdentify nearby windows, balconies, ventilation intakes and occupied premises, including homes above or beside the unit. Review the relevant surrounding building geometry.
Acoustic pathwaysConsider discharge noise, fan casing breakout, duct radiation and structure-borne transmission where relevant. One attenuator does not necessarily address every path.
Treatment and dischargeReview grease control, odour treatment, airflow, discharge height, direction and location. Specify the assessment assumptions and obtain the designer’s supporting performance details.
Operation and maintenanceRecord inspection, cleaning and replacement requirements. A treatment system that is poorly maintained may not deliver the performance assumed in the assessment.

EVIDENCE INTO ACTION

Treat the source.
Control the paths.

Effective advice considers the whole system and its operation. We identify the measures needed for the assessment, then coordinate the environmental brief with the specialist designer.

NOISE

Address the relevant sound paths

Review suitable equipment, attenuation, casing or duct breakout and vibration isolation. Match measures to the actual source, receiver and operating scenario.

ODOUR

Match treatment to the cooking

Consider appropriate grease and odour controls for the operation. Obtain system performance and maintenance information rather than rely on an unspecified filter label.

DISCHARGE

Review the outlet in context

Assess the relationship with buildings, openings and intakes. A taller duct is not automatically sufficient, and a convenient wall outlet may create avoidable exposure.

Keep design responsibilities clear.

Our environmental assessment informs the performance brief. Detailed extraction design, fire safety, ventilation compliance and installation remain separately defined responsibilities unless expressly included.

THE RIGHT METHOD FOR THE RIGHT QUESTION

Guidance, scope
and the local requirement.

We identify which guidance and requirements apply to your project. The assessment method, the planning decision and any other statutory process each have their own role.

Commercial-kitchen extraction guidance

Use relevant current EMAQ+ guidance and the authority’s submission requirements to inform the design and assessment. Confirm the edition and scope accepted for the actual application.

BS 4142 and plant noise

Where applicable, assess industrial or commercial sound using the relevant background, sound character and context. Agree any specific local criterion rather than assume a universal limit.

Odour assessment for planning

The assessment should be proportionate to the operation and risk. Depending on the proposal, this may involve a qualitative risk assessment, supporting design evidence or more detailed analysis.

Planning, licensing and nuisance

These are related but separate matters. An environmental report supports the agreed planning scope; it does not grant permission, replace licensing requirements or guarantee that complaints cannot occur.

DEFINED DELIVERABLES

A report that connects
operation, design and controls.

Agree whether the submission needs combined noise and odour evidence, a focused technical assessment or a response to a specific extraction condition.

01

Operational brief

Cooking methods, throughput, operating hours and the relevant business assumptions.

02

Site and sensitive uses

Receiver locations, surrounding buildings and relevant existing conditions.

03

Noise assessment

Source data, survey evidence where needed, calculations, character and contextual findings.

04

Odour assessment

Assessment of the source, pathways, sensitive uses and the basis of the risk judgement.

05

Control strategy

Required acoustic measures, treatment and discharge recommendations with design inputs identified.

06

Management and next steps

Maintenance assumptions, outstanding information and any verification or council response included.

ACP · TECHNICAL EXPERTISE

Acoustic knowledge.
Clear project advice.

ACP brings acoustics together with wider environmental expertise. We help project teams turn technical findings into practical decisions and a defined next step.

Our team includes Institute of Acoustics members. Qualifications across the team include the IOA Diploma in Acoustics and Noise Control, an MSc in Applied Acoustics and a PhD in Air Quality and Environmental Noise.

PUBLISHED ACOUSTIC RESEARCH

Understanding changing sound.

Ayan Chakravartty’s co-authored 2025 research examines motorway speed management and environmental noise using high-resolution monitoring.

That research sits alongside our project-specific assessment work. Your advice will address the actual source, site and decision.

Explore the published research →

FEES & PROGRAMME

Understand the scope
before you commit.

The scale of the kitchen, surrounding uses and design information affect the assessment scope. Send the site, proposed menu and authority request so we can prepare a defined quotation.

Send the information you have. A consultant can request the supporting plans, technical details and authority correspondence needed to confirm the deliverables and programme.

What shapes your quotation?

  1. Business and location

    Cooking intensity, hours, existing conditions and relevant neighbours.

  2. System information

    Availability of drawings, fan sound data, treatment details and discharge design.

  3. Assessment scope

    Noise, odour, combined reporting, further measurements or a condition response.

ENGLAND · LOCAL PROJECT CONTEXT

Where is your project?

We discuss projects across England and confirm practical survey arrangements in the quotation. Select your region and tell us the site postcode.

SITE-SPECIFIC SCOPING

England — national guidance

Share the site postcode, council request and project stage. We establish the relevant authority and assessment requirements for the actual site.

Include the planning reference or council request where available. We review the requirements for the actual authority and project.

We confirm the relevant council requirements, survey access and project scope before quoting.

Direct link to this selection →

BEFORE YOU BOOK

Clear answers.
A better project brief.

Share the authority’s request if you are unsure what is required. We can help distinguish the assessment, design advice, monitoring or verification that your project needs.

Do restaurants and takeaways need noise and odour reports?

Requirements depend on the proposal, site and authority. New uses, extraction changes and nearby sensitive premises can prompt requests for both assessments. Share the planning or environmental health comments so we can define the required evidence.

Can one report cover noise and odour?

Yes, where that suits the submission. The report should still explain the two assessment methods and findings clearly. Acoustic and odour controls need coordination but do not answer the same question.

Is a carbon filter enough to control odour?

The treatment must suit the cooking, airflow and required performance. A generic carbon-filter statement is not enough to establish an adequate design. Grease control, treatment specification, maintenance and discharge arrangements all matter.

Will an attenuator remove every noise issue?

No. It can address a particular airborne path, but casing breakout, duct radiation, other plant and vibration may remain relevant. We identify the contributions and specify the acoustic requirements for the design team.

Does the discharge always have to be above the roof?

The appropriate arrangement depends on the guidance, local requirements, surrounding geometry and proposal. We review the actual outlet and sensitive locations rather than prescribe a universal height for every site.

What if there are flats above the kitchen?

Tell us at the outset. Windows, ventilation intakes, occupied rooms and the structure connecting the premises can affect the assessment. The design may need both airborne and structure-borne noise consideration alongside odour exposure.

Can you review an extraction system that is already installed?

Yes. We can review available design details, actual operation and the reported concern. Surveys or further investigation may be needed. Any remedy will depend on the evidence and the practical constraints.

Do we need dispersion modelling?

Not every kitchen requires detailed modelling. We scope a proportionate approach using the operation, site and authority request. More complex or higher-risk proposals may need additional analysis.

Can you design and install the extraction system?

Our agreed work provides environmental assessment and acoustic or odour-control advice. Detailed mechanical design, procurement and installation are separately scoped specialist responsibilities.

What should I send for a quote?

Submit the postcode, type of food, cooking methods, anticipated hours and any council request. We can then request plans, fan data, treatment specifications and discharge details.

LET’S SCOPE YOUR PROJECT

Tell us about the kitchen and its neighbours.

A short brief is enough to start.

  1. Send the essentials

    Your site postcode, proposal, timing and any council request.

  2. Discuss the technical scope

    A consultant can request drawings, existing reports and the project-specific information needed.

  3. Receive a defined quotation

    Understand the deliverables, fee, programme and any separately scoped work.

0330 236 7329

Have drawings or consultation comments? Submit the enquiry first and we can request the files needed. You can also call or email us.

KITCHEN EXTRACTION · NOISE & ODOUR

Tell us what you need.

Your enquiry goes to ACP Consultants. See our privacy policy.

Technical references

Technical references reviewed 26 October 2026. Illustrations explain assessment concepts; they are not measured or predicted project results.

Commercial-kitchen noise and odour assessments · Practical acoustic advice© 2026 ACP Consultants Ltd · Company no. 14085697
White Collar Factory, 1 Old Street Yard, London EC1Y 8AF