01 / PONDS
On-site and nearby waterbodies
Show known ponds and ditches, including those outside your ownership. Access and connectivity influence the assessment and any survey programme.
Compare the survey options →Great crested newts · Planning & development
Great crested newt surveys and eDNA assessment shaped around your ponds, proposed works and planning requirements.
ACP helps you establish the evidence needed, plan seasonal work and understand the next decision. Start with your site and existing advice; we will define the appropriate scope.
Before booking a test
We review the site boundary, nearby waterbodies, habitat connections and the works proposed. Existing reports and the council’s request help establish the evidence the project needs.
01 / PONDS
Show known ponds and ditches, including those outside your ownership. Access and connectivity influence the assessment and any survey programme.
Compare the survey options →02 / LAND
The assessment also considers the land between ponds and the working area. Scrub, grassland and other shelter can be relevant beyond the water’s edge.
Review the site context →03 / ROUTE
Check district level licensing availability and suitability early. Eligible developments may have an alternative to a conventional survey and mitigation route.
Understand the alternatives →Different methods, different answers
We match the method to the decision. Habitat suitability, species detection, population evidence and licensing eligibility each serve a different purpose.
| Approach | The question it helps answer | What to clarify |
|---|---|---|
| Habitat / HSI assessment | How suitable is the pond and surrounding setting for great crested newts? | A Habitat Suitability Index describes suitability. It does not establish presence, absence or population size. |
| eDNA survey | Is great crested newt DNA detected in pond-water samples collected under an appropriate protocol? | Sampling period, access, laboratory analysis and interpretation must suit the evidence purpose. eDNA does not estimate population size. |
| Conventional aquatic surveys | What occurrence or population evidence can appropriate field methods provide? | Agree the methods, repeat visits and seasonal programme. Survey licences must cover relevant licensable activities. |
| District level licensing review | Could the development use a suitable strategic licensing scheme? | Scheme coverage alone does not confirm eligibility. The operator, site, risk zone and proposal need checking. |
The commission may combine approaches. We distinguish evidence already available from new fieldwork, reporting and any separately scoped licence support.
From water sample to project evidence
Environmental DNA testing looks for genetic material in pond water.
We can arrange suitable sampling and laboratory analysis as part of the agreed survey scope. Before booking, we confirm which ponds need assessment and whether the method suits the planning or licensing purpose.
The report should identify the sampled waterbodies, dates, method and laboratory result. It then explains what that information means for your proposal, including any remaining evidence needs.
A laboratory result alone is not the same as a complete development assessment.
A positive eDNA result does not tell you how many newts are present.
Protect the project programme
Start the review early enough to leave room for access arrangements, the appropriate survey window, laboratory work and any further evidence the results may identify.
01 / START EARLY
Site review, document checks and discussions about survey or licensing options can start before the field season. Habitat assessment remains subject to access and conditions.
Plan the commission →02 / eDNA WINDOW
This is the accepted sampling period for standard great crested newt eDNA evidence. Confirm the applicable protocol and requirements for the intended use.
Understand the result →03 / OTHER FIELDWORK
Conventional aquatic surveys usually fall in spring and early summer. The exact programme depends on the survey objective, methods and suitable conditions.
Choose the evidence route →Sampling dates do not include laboratory turnaround or report preparation. Cellmark: eDNA sampling period →
Resolve the route before works
Great crested newts, breeding sites and resting places are protected. Planning permission does not replace a wildlife licence where one is needed, and a survey licence does not authorise development impacts.
Where this route is appropriate, the project needs evidence of likely effects and a proportionate response. Avoidance, mitigation and any necessary licence application must align with the scheme and construction programme.
The quotation separates survey and reporting from detailed mitigation design, licence support or implementation.
Where an appropriate scheme operates and the development qualifies, DLL can replace the developer’s own detailed newt surveys and traditional on-site mitigation. The scheme’s process and required authorisation still apply.
Other species and habitat obligations remain. We check availability for the actual site rather than assuming an entire county has identical coverage.
Natural England: great crested newt protection and licences → Natural England: district level licensing for developers →
A report you can act on
We agree the deliverables and their purpose before work starts. The report makes clear what has been assessed and which matters still need resolution.
Already have a report or eDNA result? Send the complete evidence and current layout. We can review what it supports before proposing the next commission.
Review my newt evidence →Scope and fees
A single-pond sample and a complete newt assessment are different scopes.
Fees depend on the ponds, access, travel, method, field effort, laboratory work and reporting needed. Your quotation identifies included costs and any assumptions about information supplied by others.
Licensing fees, scheme payments, mitigation design and construction support are not automatically part of a survey price. We state whether any related advice is included.
Your location, your proposal
We welcome planning enquiries across England, including Greater London, the South East, East of England and the Midlands. Tell us the postcode and relevant planning authority; we will confirm survey arrangements and availability.
A county name alone cannot define the survey requirement. We review the validation request, consultee comments or planning condition against your proposal and existing evidence.
Include temporary access, service routes, compounds and off-site works where relevant. Your quotation identifies the survey area, travel assumptions and landowner access needed.
Before you commission
For more background, read ACP’s existing great crested newt guide. For project advice, send the site plan and current evidence.
A nearby pond and connected terrestrial habitat may still be relevant. We review the setting and proposed effects, including any suitable strategic licensing option. The red line alone does not define the ecological question.
No. It assesses pond suitability rather than confirming presence or absence. We use it with the wider site evidence to decide what the commission needs to establish.
No. Standard great crested newt eDNA analysis provides detection evidence, not a population estimate. If more detailed population evidence is needed, the methods and programme must be scoped accordingly.
For standard planning evidence, arrange sampling within the accepted 15 April–30 June window. An out-of-season result cannot simply be treated as an equivalent negative survey. Contact us to review the evidence purpose and available route.
Tell us before the visit if possible. Access and water conditions can affect the method and the conclusions. We document limitations and agree how to address the gap, rather than treating an unsampled pond as clear.
Not automatically. The finding informs assessment of the proposal and the appropriate response. Design changes, mitigation or a licensing route may be needed. Their feasibility and programme must be considered for the actual scheme.
It is an alternative for eligible developments, not a universal answer. We compare the available route with the site and project objectives. Scheme eligibility, payments and other ecological requirements also matter.
No. They serve different purposes. A habitat gain calculation does not resolve protected-species effects or authorise works. We can coordinate the relevant scopes with ACP’s BNG service.
Let’s define the right scope
Start with a short project outline. We will clarify the information needed and prepare a site-specific quotation.
Your site, planning stage and the help you need.
A consultant can request drawings, council comments and previous reports.
Understand the deliverables, programme and any additional work.
Request an ecology quotation
Your enquiry goes to ACP Consultants. See our privacy policy.
Guidance checked on 26 October 2026. Survey design and any authorisations are confirmed for the actual site and proposed works.