Major development or saved earlier rules
- 1Enhance existing on-site habitat
- 2Create new on-site habitat
- 3Allocate registered off-site gains
- 4Statutory credits as the final option
Design decisions · Current planning rules
Avoid harm early.
Choose the right delivery route.
The biodiversity gain hierarchy guides how BNG is delivered. It works alongside the ecological mitigation hierarchy, which addresses harm to habitats and species.
Understand the difference, the August 2026 changes for qualifying minor development, and the evidence needed to explain your approach.
England TCPA guidance · Sources checked 3 November 2026
They are related, but they answer different questions. The ecological mitigation hierarchy asks how development avoids and addresses harm. The statutory biodiversity gain hierarchy sets priorities for actions within England’s BNG framework.
A project can meet a numerical unit target and still leave unacceptable ecological effects. Conversely, retaining important habitat does not automatically demonstrate the required BNG outcome. Address both questions in the design and explain them separately.
| Framework | What it asks | What demonstrates it |
|---|---|---|
| Ecological mitigation hierarchy | Can harm be avoided, then adequately mitigated, with compensation used as a last resort? | Alternatives, impact assessment, design changes and effective measures for affected ecological features. |
| Statutory biodiversity gain hierarchy | Have the applicable priorities for habitat impacts and BNG delivery been followed? | A reasoned delivery strategy, metric evidence and the Biodiversity Gain Plan, using the correct application-date rules. |
Current NPPF policy N2 retains the significant-harm test: development should be refused where significant biodiversity harm cannot be avoided, adequately mitigated or, as a last resort, compensated for. The current Framework also addresses how requirements beyond statutory BNG should be considered.
The phrase “avoid, minimise, restore, offset” is useful in broader environmental practice. However, it is not a complete statement of the statutory BNG sequence. Restoration may contribute to mitigation or compensation; its role depends on the effects and proposed measures.
First address adverse effects on on-site habitats with medium, high or very high distinctiveness: a metric distinctiveness score of 4 or more. The statutory hierarchy prioritises avoidance and then mitigation where effects cannot be avoided.
The subsequent compensation priorities depend on the development and application history. The following diagram applies to the TCPA statutory framework, excluding irreplaceable habitat. Other planning and ecological requirements still apply to habitats outside that first distinctiveness threshold.
Then: statutory credits only where none of those actions can be done.
For the standard route, explain why a lower-priority action is needed where a higher-priority action cannot be followed. A combined on-site and off-site solution can be appropriate. Select the delivery mechanisms that meet the project’s needs under the applicable priorities.
The 2026 regulations place on-site enhancement, on-site creation and registered off-site gains at the same preference level for qualifying non-major development. Such a project can choose off-site delivery without first exhausting on-site delivery options.
This flexibility does not remove the initial avoidance and mitigation priority for medium-or-higher distinctiveness habitats. It also leaves statutory credits as the final option. Nor does it exempt the development from BNG, protected-species law or other applicable planning requirements.
Where the application was made on or after 6 August 2026, the modified compensation hierarchy can apply. Confirm the legal development classification and any transitional exception.
The original hierarchy continues for the resulting permission’s Biodiversity Gain Plan. A later decision date or later gain-plan submission does not itself switch the rules.
For a section 73 application made from 6 August 2026, the original hierarchy remains where the original application was made, or original permission granted, before that date. For a chain of section 73 permissions, trace the history back to the first permission in the sequence.
Some developments are exempt under separate rules. For example, the new 0.2-hectare exemption has priority-habitat and application-history conditions. Small size alone is not enough.
Development classification, Small Sites Metric eligibility and exemption each have their own tests. Confirm each conclusion separately. Our BNG exemptions guide covers applicability, while the legislation guide explains the wider framework.
Use confirmed planning facts to build a focused route review note. Check the development classification, BNG applicability and permission history first. The tool identifies any facts still needed to establish the route.
Your next checks
Based on the 2026 regulations and current Planning Practice Guidance. Your answers remain in your browser. Verify the application documents before relying on the route.
A useful options review makes the decisions visible. Record what was changed, which ecological effect it avoids or reduces, and what remains. Keep this narrative alongside the metric; a spreadsheet alone does not explain why the preferred layout is appropriate.
| Option | Ecological reasoning | Evidence to retain |
|---|---|---|
| Move an access road | Avoid severing an established hedgerow corridor where a workable alternative exists. | Compared layouts, habitat and species constraints, engineering review and retained-habitat protection. |
| Reduce construction effects | Control lighting, storage and working areas around retained features. | Specific measures, responsible parties and how compliance will be checked. |
| Create or enhance habitat | Choose targets compatible with soils, hydrology, land use and long-term management. | Metric assumptions, design specification, management actions and delivery risks. |
| Use registered off-site gains | Address the remaining requirement through suitable, secured gains under the applicable hierarchy. | Habitat match, spatial adjustments, register allocation and the delivery agreement. |
For a qualifying non-major project, comparison of on-site and off-site benefits can still improve the design. Present that as a reasoned choice, not an invented legal requirement to exhaust on-site options first.
Worked design comparison · Illustrative area units
Compare two layouts for the same surveyed site. Both use an evidenced baseline of 8.00 area units and a 10% target of 8.80 units. The post-development figures below already include the applicable on-site risk adjustments.
| Calculation | Layout A | Layout B |
|---|---|---|
| Design approach | More existing habitat lost; greater reliance on replacement | Layout adjusted to retain more habitat and improve connectivity |
| Baseline × 1.10 | 8.00 × 1.10 = 8.80 units | 8.00 × 1.10 = 8.80 units |
| Post-development on-site value | 7.80 units | 8.50 units |
| Remaining contribution | 1.00 area unit | 0.30 area units |
Layout B reduces the remaining contribution by 0.70 units. Retention keeps existing value in the account; the baseline stays at 8.00 units. Assess the habitat types and trading rules behind each total, then apply any off-site spatial adjustment to suitable gains.
This comparison addresses area units only. Assess hedgerow and watercourse units separately where relevant. The biodiversity-unit calculation guide explains the wider arithmetic and risk adjustments.
For each layout, identify the drawing revision, affected parcel IDs and direct or indirect ecological effects. Then record the alternatives, technical constraints, mitigation and residual effects. The preferred option should have a clear reason that readers can trace to the evidence.
For example, moving a road may retain a habitat corridor but change drainage, lighting or access requirements. Coordinate those changes with the relevant designers before finalising the ecological conclusion. Check the updated metric and management proposals against the same drawing revision.
For major development and saved earlier applications, explain the applicable priority sequence and why any step cannot be followed. For qualifying non-major development, document the chosen combination of on-site and registered off-site gains within the modified hierarchy.
Marshall and colleagues (2024) studied baseline biodiversity units and species measures across 24 sites. They found relationships with plant measures, but not the bird or butterfly measures studied. This was a baseline comparison, not a long-term audit of delivered BNG projects.
The practical implication is to retain species-focused assessment and management alongside habitat accounting. Assess the outcomes for relevant species and ecological features alongside the metric result. Our BNG and EIA guide explains how the evidence fits together.
Record the application date, development classification, exemption conclusion and section 73 history where relevant. Cite the current rule supporting the chosen sequence.
Identify the affected features, alternatives considered and measures retained in the design. Explain remaining effects and how the proposals address them.
Reconcile the final layout, baseline, habitat proposals and metric. For off-site gains, demonstrate the appropriate unit types, spatial treatment and allocation.
Align the Biodiversity Gain Plan with the required legal, management and monitoring arrangements. Keep responsibilities and long-term funding clear.
The planning authority considers how the hierarchy has been applied when determining the Biodiversity Gain Plan. Where an action has not been followed, explain why. This should be specific to the site rather than a generic statement copied between reports.
Some council documents predate the August 2026 change. For example, Cheshire West and Chester’s March 2024 interim note describes exhausting on-site options before off-site compensation.
Check the latest council position, the application’s transitional rules and current national policy. Apply the current national hierarchy to the permission’s confirmed application history when interpreting older local wording.
Registered off-site gains are habitat gains allocated to a development through the biodiversity gain site register. They can come from suitable land you control or a third-party provider. Review the actual habitat requirements and delivery arrangements, not just a headline price.
Government statutory biodiversity credits are a separate last-resort mechanism. They remain last in both hierarchy routes. The non-major flexibility does not make government credits interchangeable with private off-site units.
Use our off-site units guide to explore delivery, the units-versus-credits comparison to clarify terminology, and the buying units and credits guide for procurement checks.
Clear answers on on-site priorities, the non-major route and permission history.
No. Qualifying non-major applications made from 6 August 2026 can consider on-site enhancement, on-site creation and registered off-site gains at the same preference level. Earlier applications and saved section 73 cases retain the original hierarchy. Other ecological duties remain.
No. The first statutory priority for adverse effects on medium-or-higher distinctiveness on-site habitats remains. The wider mitigation hierarchy also continues to address significant ecological harm.
Not simply because the section 73 application is new. The saving provisions preserve the original hierarchy where the original application was made, or permission granted, before 6 August 2026. Review the full permission history, including a sequence of section 73 permissions.
The statutory biodiversity gain hierarchy does not apply to irreplaceable habitats. Separate BNG treatment and stringent planning protections apply. Ordinary units or credits should not be presented as a routine substitute for their loss.
No. Their position depends on the applicable hierarchy. In the modified non-major route, registered off-site gains share a preference level with on-site enhancement and creation. Government statutory credits remain the final option.
Cost is relevant to feasibility, but it does not establish compliance by itself. Explain ecological constraints, the applicable hierarchy, deliverability, metric rules and legal arrangements. Compare prices for units that meet the project’s habitat and delivery requirements.
This guide and tool address England’s TCPA framework. NSIPs have a separate statutory BNG regime, applying to Development Consent Order applications made on or after 2 November 2026. Review the relevant infrastructure rules rather than assuming this application-date test transfers across.
Discuss your BNG strategy
Tell us about your site and planning history. We can review ecological constraints, compare delivery options and explain the evidence your strategy needs.
Share the application date, development classification and any section 73 history.
Identify the site boundary, habitat surveys, current layout and metric.
Tell us about on-site opportunities, off-site options and your next planning milestone.
Sources checked 3 November 2026. England scope unless stated otherwise.