Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com
Environmental assessments · ACP Consultants

Environmental assessments for planning

Our environmental assessments for planning help you understand air quality, noise, odour and land contamination before key design decisions.

First, tell us about your site, proposed use or a council request. We can help you identify the relevant assessments and agree a proportionate scope.

For developers, landowners, architects and planning teams.
Conceptual environmental assessments illustration showing homes, a workshop, air and noise effects, and ground investigation
Conceptual site illustration · air, noise, odour and ground conditions.
Illustration © ACP Consultants.
One site · two directions

Environmental evidence.
Connected design decisions.

Your proposal can affect its surroundings. Equally, existing conditions can affect the people who will use your development.

For example, a new ventilation system may address indoor conditions but introduce noise at neighbouring homes. Therefore, share the same drawings and operating assumptions across the assessment team.

This joined-up approach helps you identify conflicts early. It also gives designers a clearer basis for choosing layouts, equipment and mitigation.

01

What could affect your development?

Consider nearby traffic, commercial noise, odour sources and previous land uses. Then identify who or what could be exposed.

02

What could your development affect?

Consider new plant, extraction, vehicle movements and construction. Then identify neighbours and other sensitive locations.

03

Which decisions need coordination?

Bring together building layout, ventilation, plant positions, external areas and ground works. Also check changes against each relevant assessment.

One shared design brief. Separate technical questions. Coordinated responses.
ACP Consultants© ACP Consultants · Assessment scoping guide
A starting framework for discussion, not a substitute for site-specific assessment.
Find your starting point

Which environmental assessments do you need?

Start with the question the evidence must answer. Then use the relevant service page for assessment methods and more detailed guidance.

Common reasons to review the scope. These examples do not automatically trigger every assessment.
AssessmentWhen to discuss itWhat it can inform

Air quality assessment

When to discuss itNew homes near busy roads; changes to traffic or combustion plant; demolition and construction dust.What it can informExposure at sensitive locations, emissions, construction controls and the need for modelling or monitoring.

Noise surveys & assessments

When to discuss itRoad, rail or commercial noise affecting a site; new plant, servicing or activity near sensitive neighbours.What it can informAcoustic design, plant selection, operating arrangements and mitigation. Coordinate ventilation requirements with the design team.

Odour assessment

When to discuss itCommercial kitchens, waste handling or other odorous processes; sensitive development near an existing odour source.What it can informSource controls, extraction arrangements, separation and management measures, based on the activity and surrounding uses.

Contaminated land assessment

When to discuss itPrevious industrial activity, made ground, uncertain site history or a change to a more sensitive land use.What it can informPotential contamination risks and whether investigation, remediation or verification is needed to support the proposed use.

One report does not automatically cover all four disciplines. The appropriate scope depends on the site, proposal, available evidence and planning requirements.

From brief to useful evidence

Scope your environmental assessments around the decision

A useful brief explains what you propose and what you need to resolve. It also identifies the planning stage and any deadline.

Our environmental assessments for planning start with that context. We can then discuss the relevant disciplines, information gaps and sequence of work.

Send what you already have

  • Site address, boundary and current layout drawings.
  • Proposed use, operating hours and relevant plant or process details.
  • Council correspondence, planning reference or exact condition wording.
  • Previous reports, surveys and any known changes to the site.
  • Your next design decision and intended submission date.
  1. 01

    Review the question

    Identify the proposal, surroundings and relevant planning request. First, check what existing evidence can usefully contribute.

  2. 02

    Agree the investigations

    Define the methods, assumptions and reporting scope. Where necessary, plan surveys, monitoring or ground investigation to answer specific gaps.

  3. 03

    Coordinate the design response

    Discuss the findings with your designers. Then check how mitigation and design changes affect the other technical disciplines.

  4. 04

    Prepare the agreed evidence

    Set out findings, limitations and recommendations in the agreed reports. Finally, identify any further design details or verification needed.

Before you commission

Environmental assessments: timing and fees

Commission early enough for the findings to influence the design. A clear brief also makes the quotation and programme more useful.

Timing: plan around the evidence

For example, access, operating conditions and survey requirements can affect the programme. Ground investigation may also involve laboratory testing and follow-up work.

Therefore, share your target dates before booking. If the council has requested evidence, send the exact wording rather than relying on a report title alone.

A revised layout, new equipment or changed operating hours may require the assessment team to review earlier conclusions.

Fees: agree the scope and assumptions

The fee depends on the discipline, site complexity, available information and investigation effort. In addition, modelling, specialist testing and reporting requirements can affect the cost.

Also ask what the quotation includes, which information you must provide, and how revisions or further work will be handled.

Discuss scope, timing and a quotation
Before your first enquiry

Questions about environmental assessments for planning

You do not need a finished technical brief to start. Explain the decision you face and share the information you have.

Further reading for projects in England:

Planning practice guidance: air qualityPlanning practice guidance: noisePlanning practice guidance: land contaminationGovernment guidance on statutory EIA

Planning frameworks differ elsewhere in the UK. Confirm the applicable requirements for your site.

01

Do I need all four environmental assessments?

No. Requirements depend on the proposal, surroundings and available evidence. First, review the site and any planning request. You can then agree the relevant disciplines and avoid commissioning a standard bundle that does not match your project.

02

Is an environmental assessment the same as EIA?

Not necessarily. An air quality, noise, odour or land contamination assessment answers a particular technical question. In contrast, statutory EIA is a wider process for qualifying development. A project may need individual assessments even where EIA is not required.

03

Do environmental assessments always need site surveys?

No. Existing evidence and a desk-based review may answer some questions or define the next investigation. However, monitoring, surveys or sampling may be necessary where information is missing. Agree the purpose and method before commissioning fieldwork.

04

Can we use reports from a previous application?

Share them alongside your current drawings. However, their usefulness depends on the scope, methods, dates and any changes to the site or surroundings. For example, new plant or revised operating hours can change the assessment. As a result, earlier reports may help, but an update may still be needed.

05

Can assessments wait until after planning permission?

Do not assume that they can. Some evidence may be needed to assess the application, while conditions may address later details. Therefore, check the council’s requirements and any condition wording before fixing the programme or starting relevant works.

06

What if I only have a council request?

That is a useful starting point. Send the full request or condition, your planning reference, site location and latest drawings. Also explain your deadline. We can then discuss the question the environmental evidence needs to answer and the scope of a quotation.

Your site · your next step

Tell us what you are planning.

Share your site location, proposed use and the question you need to resolve. We can then discuss the relevant environmental assessments.

If available, include your planning reference and tell us about existing reports. You do not need a finished brief to get in touch.

0330 236 7329
hello@acp-consultants.com

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the site address or the closest location you can provide.

We use your details to respond to your enquiry. Read our Privacy Policy.