Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com
Planning & Development

Planning and development assessments

Understand the effects. Coordinate the evidence. Inform the design.

Our planning and development assessments connect transport, flood risk, drainage, environmental evidence and community health. We help you define the studies your proposal needs and coordinate their findings with the design.

First, tell us about your site and the decision ahead. Together, we can establish a clear scope before reports and drawings move in different directions.

Planning and development assessments illustration showing homes, green space and connected community routes
ACP ConsultantsBuildings, green space and community connections considered together.
Conceptual illustration · not an actual project · © ACP Consultants
Define the requirementTransport, flood risk, drainage, EIA and HIA.
Coordinate the inputsA shared project description and design assumptions.
Inform the next decisionClear findings, limitations and practical actions.
Different questions. Connected evidence.

Choose the right assessment route

EIA and HIA have different purposes. A proposal may also need individual technical studies, whether or not either wider assessment is required. First, establish the question your evidence must answer.

01 / Environmental effectsEIA

Environmental Impact Assessment

Bring likely significant environmental effects into the decision-making process for development that requires EIA.

Start with
First, review the project type, scale, location and likely effects. Where the position needs screening, establish the applicable route early.
Support to discuss
For example, screening information, assessment scoping, specialist studies and coordinated Environmental Statement preparation, as appropriate to the project.
What good evidence connects
The project description, baseline, assessment methods, likely effects and mitigation. For EIA development, keep the technical chapters aligned with the proposed design.
Explore our EIA service
02 / People & placeHIA

Health Impact Assessment

Examine how development could affect health and wellbeing, including how effects may differ between population groups.

Start with
First, review local policy, validation requirements, public-health advice and the communities the proposal may affect.
Support to discuss
For example, a proportionate health assessment, relevant population evidence, design review and recommendations to address potential effects.
What good evidence connects
Housing and place quality, environmental conditions, access to services and green space, and opportunities for active travel. Then agree which topics matter for your site.
Explore our HIA service
Access, water and development

Transport, flood risk and drainage services

Bring these disciplines into the design early. We provide transport planning, flood risk assessment and drainage support, alongside the wider environmental evidence your proposal needs.

01 / Movement

Transport planning

Understand how people and vehicles will reach, use and move around the development.

  • Transport Assessments and Transport Statements.
  • Travel Plans, sustainable travel and access strategy.
  • Parking, servicing and development traffic evidence.

First, share the site layout, proposed uses and any highway authority comments so we can define the scope.

Discuss transport planning
02 / Flood resilience

Flood risk assessment

Examine flood risk to the site and how the proposal could affect flood risk elsewhere.

  • Site-specific Flood Risk Assessments.
  • Review of relevant flood sources and constraints.
  • Mitigation advice to inform the layout and levels.

Start with the site boundary, current survey information and proposed development. Then agree the evidence needed.

Discuss flood risk
03 / Water management

Drainage and SuDS

Plan how the development will manage surface water and connect drainage with the wider site design.

  • Surface-water drainage strategies.
  • Sustainable drainage systems and layout coordination.
  • Discharge, maintenance and supporting evidence.

Consider drainage alongside access, landscape and ecology, so the design can accommodate the necessary measures.

Discuss drainage and SuDS
Match the evidence to the decision

Planning assessments at each project stage

Planning and development assessments should reflect where your project stands. This guide shows the questions to resolve, not a fixed sequence of reports for every development.

01 / EARLY OPTIONS

What could shape the proposal?

First, identify sensitive surroundings, information gaps and issues that could affect the layout. Then consider which options need further investigation.

Useful next stepInitial review and a prioritised evidence brief.
02 / PRE-APPLICATION

What assessment is needed?

Next, clarify the EIA position and relevant HIA requirements. Also identify specialist inputs and questions for the planning authority.

Useful next stepAgreed scope, responsibilities and programme assumptions.
03 / APPLICATION

Do the reports describe one design?

Then check the submitted layout against each assessment. Also reconcile mitigation, operating assumptions and any outstanding evidence.

Useful next stepCoordinated reporting with clear limitations and actions.
04 / DESIGN CHANGES

What needs to be reassessed?

A changed layout, use or phasing can affect previous conclusions. Therefore, review the relevant studies before relying on them.

Useful next stepA defined update scope and revised evidence where needed.
Planning-stage guide © ACP ConsultantsProject-specific requirements determine the scope.
Where coordination makes a difference

Make the reports work together

Planning and development assessments need consistent assumptions across the reporting package. Before submission, check that each specialist has assessed the same proposal and that the design reflects the stated measures.

Five practical checks for a coordinated assessment package.
CheckWhat to reconcileWhy it matters
Project descriptionWhat to reconcileSite boundary, uses, scale, layout revision and operating hours.Why it mattersOtherwise, different assumptions can produce conclusions that do not apply to the submitted scheme.
Baseline and receptorsWhat to reconcileExisting conditions, nearby sensitive uses and the population groups under consideration.Why it mattersIn particular, the evidence needs to explain who or what may experience the effects.
Construction and operationWhat to reconcilePhasing, temporary works, access and the completed development's operation.Why it mattersFor example, temporary and lasting effects may require different assessment and mitigation.
Design and mitigationWhat to reconcileMeasures in the reports against the drawings, specifications and management proposals.Why it mattersIn turn, a recommendation needs a practical route into the proposal and its delivery.
Changes and limitationsWhat to reconcileOutstanding surveys, revised information, assessment limits and further actions.Why it mattersThe project team must also know which conclusions remain conditional.
A design decision in practice

One change can affect several assessments

For example, consider a residential proposal beside a busy road. Moving homes further from traffic might help address one environmental issue, but it can also change access routes and the quality of shared outdoor space.

The answer is not simply to accept the first mitigation suggestion. Instead, test the revised layout across the relevant disciplines and explain any remaining trade-offs.

This is where planning and development assessments should inform design while choices remain open.

Example: homes, a road and shared green space

Illustrative coordination exercise—not an ACP project or an assessment conclusion.

01

Check the technical effect

First, ask the relevant specialists to review noise, air quality and ventilation assumptions for the revised arrangement.

02

Check the experience of the place

Next, consider access to green space, walking routes and how different residents may use the development. Also feed relevant findings into the HIA.

03

Close the loop with the drawings

Finally, record the agreed change, update affected reports and show how the proposal incorporates the necessary measures.

The site evidence determines whether a measure is appropriate. A conceptual example cannot establish compliance.
From your first enquiry

A clear brief for planning and development support

You do not need to commission every report before speaking to us. Instead, start with what you know, the decision you face and any written request from the council.

We can then discuss the relevant ACP role, the evidence available and what needs further clarification. In addition, agreeing responsibilities early helps avoid gaps between specialists.

Five things to send

  1. Site and proposal. Address, boundary plan, current use and proposed development.
  2. Current design. Latest drawings, revision numbers, intended uses and phasing.
  3. Planning context. Application reference, council correspondence and any screening or scoping opinion.
  4. Existing evidence. Previous reports, survey dates and specialists already involved.
  5. Next milestone. The decision or submission date, plus any information still in preparation.
A realistic scope and programme

Timing, fees and agreed outputs

Ask what the quotation includes and which dependencies could change the programme. A clear brief is more useful than a promised turnaround before the evidence needs are understood.

Plan around the dependencies

For example, seasonal surveys, access, monitoring and design revisions can affect delivery. Consultation or engagement may also require time.

  • First, agree when each specialist input will be available.
  • Then allow time for the design team to respond to findings.
  • Also set draft-review and final-report milestones.
  • Finally, review the programme if the proposal changes.

Know what you are commissioning

For planning and development assessments, fees depend on the route, site complexity and coordination effort. Therefore, confirm the evidence available and the assumptions as well as the price.

  • First, which reports and technical inputs are included?
  • Who handles meetings, consultation and coordination?
  • How many review rounds does the scope allow?
  • Also, how will additional work or updates be agreed?
Before you commission

Your planning assessment questions

Clarify the requirement, then agree the evidence. A report title alone rarely describes the complete task.

Current guidance for England

Government EIA guidance

Healthy and safe communities

Requirements differ elsewhere in the UK. Confirm the applicable framework for your site.

01

Does every development need EIA?

No. EIA applies to particular development under the relevant regulations. Where screening is needed, the project's type, scale, location and likely effects matter. Seek a site-specific view rather than relying on a broad project label.

02

What is the difference between screening and scoping?

Screening addresses whether EIA is required. Scoping addresses the issues and information the assessment should cover. Therefore, establish which question needs resolving before commissioning the next stage.

03

When should we consider an HIA?

Check local policy, validation requirements and public-health advice early. HIA can also help examine potential health effects and inequalities. Therefore, its scope should reflect the proposal, affected population and relevant planning requirements.

04

Can EIA and HIA use the same evidence?

Yes. Air quality, noise and access to green space may inform both. However, the assessments have different purposes. Agree how findings connect while retaining the necessary analysis for each.

05

Can we rely on reports from an earlier scheme?

Possibly. First, check their scope, age, methods and design assumptions. Changes to the site or proposal may require updates. Share the reports and revised drawings so the relevant specialists can review their suitability.

06

What happens if the design changes during assessment?

First, tell the assessment team promptly and identify the revised drawings. Then check which assumptions, effects and mitigation need review. Finally, agree the update scope before treating earlier conclusions as applicable to the new design.

07

What if the council's request is unclear?

First, send the exact wording, application reference and latest drawings. We can then discuss the likely assessment route and what needs clarification. This helps establish the next step before commissioning unnecessary work.

Your proposal · your next step

Bring your planning question to us.

Share the site location, proposed development and the decision you need to support. We can help with transport planning, flood risk, drainage, environmental impact and health impact assessments.

Include any council request, existing reports and your target date. An outline brief is enough to start.

0330 236 7329
hello@acp-consultants.com

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the site address or the closest location you can provide.

We use your details to respond to your enquiry. Read our Privacy Policy.