London / Planning & development
Air quality consultants in London
Our London air quality consultants help you plan the right assessment for your development. We bring together borough requirements, emissions, exposure and practical mitigation for applicants and design teams.
Explore Air Quality Neutral, Air Quality Positive, monitoring and construction dust. Start with the London route checker, then check your borough’s guidance.
Clear evidence. Coordinated design.
Know the planning route
Separate assessment, Neutral and Positive requirements from the outset.
Check the local detail
Find borough guidance and identify the documents that need closer review.
Design around the evidence
Coordinate layout, ventilation, energy, transport and construction controls.
London in context
Why air quality changes from street to street
A London-wide improvement does not describe every façade, playground or intake. Start with the sources around the site, then examine how pollution reaches the people who will use it.
FIELD EVIDENCE / URBAN DISPERSION
The street changes the airflow.
The airflow changes exposure.
Conceptual cross-section · cross-street wind · flow regime depends on geometry and weather.
Roof level is an interface
Turbulence exchanges air with the atmosphere above. Sheltered streets can ventilate less effectively.
Pollution can return through the canyon
Buildings redirect the flow. The circulation pattern changes with wind direction, street proportions and openings.
Check both façades
Receptors A and B illustrate different positions. Assess occupied windows, pavements and intakes at relevant heights.
Original scientific illustration
Why a London street canyon needs a local assessment
Continuous building frontages can restrict ventilation and drive recirculating flow when the wind crosses the street. Pollutants may spend longer within the canyon, and concentrations can differ across the road and with height. The street remains connected to the air above: “trapped” does not mean sealed.
Real London streets include junctions, gaps, uneven rooflines and changing wind. These can create along-street transport and more complex circulation than a single idealised vortex. The DAPPLE field study around a central London junction demonstrates why traffic and local meteorology should be assessed together.
Review building height-to-width ratio, street orientation, wind climate and receptor locations before selecting a canyon treatment or a more detailed flow study. Dense planting can also alter airflow; evaluate its position and form alongside its other benefits. Greater height or a green screen should not be assumed to solve exposure automatically.
Tomlin et al. (2009), A field study of factors influencing the concentrations of a traffic-related pollutant in the vicinity of a complex urban junction, Atmospheric Environment, 43: 5027–5037. Paper / DOI. UCL: street geometry and ventilation research.
Transport corridors
Traffic contributes nitrogen oxides and particles. Brake and tyre wear remain relevant as exhaust emissions fall. Junctions, bus routes, servicing and street canyons shape the local picture.
Where are the occupied windows, entrances and walking routes relative to busy roads?
Buildings and works
Combustion plant, domestic burning and construction add different pollutants and time patterns. Aviation, river traffic and industrial activities warrant attention where they influence the site.
Which sources operate nearby, at what height and during which hours?
Weather and background
Wind and atmospheric mixing influence dispersion. Regional transport and secondary particle formation also matter. Ozone can behave differently from roadside nitrogen dioxide.
Does the chosen evidence represent the pollutant, season and site setting?
Source framework: GLA London Atmospheric Emissions Inventory 2022, revised May 2026.
People and place
Why children and vulnerable users belong in the brief
Children, older people and people with existing heart or respiratory conditions can be particularly affected by air pollution. Homes, schools, nurseries and care settings therefore need careful attention to exposure, alongside the relevant planning tests.
London children and lung development
The London LEZ study examined 2,164 children aged eight to nine between 2009–10 and 2013–14. Higher modelled pollution exposure was associated with smaller lung volumes. This historical study supports careful receptor assessment; it does not quantify the effect at a new development.
Mudway et al. (2019): Impact of London’s low emission zone on air quality and children’s respiratory health. The Lancet Public Health, 4: e28–e40Cleaner air and children’s lung growth
The prospective London and Luton study followed children over 2018–2022. It found improved lung-function growth in London alongside reduced pollution after ULEZ introduction. The Queen Mary and Imperial-led work adds newer evidence; individual outcomes and site-specific benefits cannot be inferred from it.
Wood et al. (2026): Impact of the Ultra Low Emission Zone on lung function growth in children in London, UK. The Lancet Public Health, 11: e733–e743Health evidence informs the layout
Consider outdoor play, entrances, occupied rooms and air intakes early. Assess exposure and practical source reduction together, rather than relying on an emissions benchmark alone.
The GLA’s 2026 summary reports an estimated 3,800–5,100 premature deaths attributable to London air pollution in 2024. This is a population-level modelled burden, not a count of individually identified deaths. Compare it with the same analysis’s revised 2019 estimate, rather than mixing estimates from different methods.
Monitoring / inventories / management
Read the London evidence at the right scale
London’s long-term NO₂ record shows substantial improvement. The GLA’s June 2025 report gives the following 2024 annual means, then marked provisional. The comparison illustrates why roadside and background settings should remain separate.
GLA monitoring summary / 2024
Roadside and urban background
Nitrogen dioxide (NO₂)
Annual mean · µg/m³ · scale 0–30
Fine particles (PM₂.₅)
Annual mean · µg/m³ · scale 0–12
View the values in a table
| Pollutant | Roadside | Urban background |
|---|---|---|
| NO₂ | 24.45 | 17.66 |
| PM₂.₅ | 8.67 | 8.22 |
These network averages are not predictions at an individual property. They are below the relevant annual legal limits cited in the report but above the WHO annual guideline values of 10 µg/m³ for NO₂ and 5 µg/m³ for PM₂.₅. WHO guidelines and statutory compliance tests serve different purposes.
GLA report, pages 87–88. For a current project, use the latest ratified station records and relevant council report; do not substitute this dated comparison for a baseline.
Measured concentrations
London Air, AURN and council networks provide complementary evidence. Automatic instruments resolve time patterns; diffusion tubes provide spatial NO₂ information over longer sampling periods.
Check site classification, coverage, ratification, bias adjustment and annualisation where relevant.
Modelled emissions and exposure
LAEI 2022 emissions were revised in May 2026. Its 2022 concentration maps are modelled; the 2025 and 2030 emissions entries are forecasts in that inventory.
Use the correct dataset version and year, and distinguish emissions in tonnes/year from concentrations in µg/m³.
Local management areas
The October 2026 Defra summary lists 35 active NO₂ and 28 active PM₁₀ AQMA entries for London, plus 7 revoked NO₂ and 4 revoked PM₁₀ entries. Pollutant counts overlap.
Check the current mapped order, pollutant and objective. An AQMA designation alone does not prove a present-day exceedance.
Our 19 October 2026 review of the 33 London authority records found active AQMAs in all 33: 30 covered the whole authority, while Bromley, Hillingdon and Lewisham had partial coverage. An AQMA, Air Quality Focus Area and ULEZ are different designations. Use the borough guidance and actual boundary for the site.
Defra AQMA statistics · AQMA boundaries · Council monitoring dashboard · London Air · AURN
London / changing sources
From coal smoke to a changing urban emissions mix
Coal, homes and industry
Industrial-era growth intensified an older coal-smoke problem. Domestic fires, furnaces and power generation contributed soot and sulphur dioxide; winter weather could limit dispersion.
Smog and smoke control
The Great Smog helped prompt the Clean Air Act 1956. Smoke controls, cleaner fuels and changes in industry progressively reduced the historic smoke and sulphur problem.
Roadside exposure
As coal declined, vehicle emissions became more prominent. Nitrogen dioxide and particles required different monitoring and controls, including emissions standards and London's charging zones.
Beyond the tailpipe
Electrification changes the source mix. Tyre and road wear, construction, combustion sources and regional secondary particles still matter alongside local exhaust reductions.
The lesson is to update the source model as the city changes. Historic land use can inform a site investigation, while present-day emissions and representative monitoring determine the current air-quality baseline.
GLA (2022), 70 years since the Great London Smog · London Air: history of London's air pollution.
Transport / energy / the next questions
Electric vehicles change the problem we need to assess
Battery-electric vehicles eliminate exhaust emissions at the vehicle during driving. That is valuable beside roads and homes. It does not remove every traffic-related particle or make electricity demand irrelevant.
Lower exhaust; remaining particles
Regenerative braking can reduce brake wear. Tyre and road wear, and resuspension of deposited dust, remain relevant. Vehicle mass, tyres, driving and mileage affect the balance; there is no single non-exhaust penalty that applies to every EV.
When and where charging happens
Charging adds electricity demand. Its emissions depend on the generation mix and timing. Keep local roadside exposure, power-sector emissions and whole-life carbon as separate assessment boundaries.
Energy and peak power differ
A fleet's daily energy need in kWh differs from its simultaneous charging demand in kW. Depot schedules, charger ratings, other building loads and local network capacity determine the connection question.
Does electrification put strain on the network?
It can increase local peak demand, particularly when vehicles charge together. Smart charging can move flexible demand; storage, staged deployment or reinforcement may also be relevant. Establish capacity with the network operator early. An EV uptake forecast alone cannot establish whether a particular connection is constrained.
Imperial's transport research shows why electrification, non-exhaust controls and reducing vehicle kilometres should be considered together. Its UK charging work also examines how charging patterns affect emissions. These are scenario- and method-dependent findings, rather than a universal percentage reduction for a London development.
Mehlig, ApSimon & Staffell (2022), Emissions from charging electric vehicles in the UK, Transportation Research Part D, 110: 103430. DOI. Mehlig et al. (2023), Accelerating electric vehicle uptake favours greenhouse gas over air pollutant emissions, 124: 103954. DOI. Imperial research summary.
Network evidence: Government/Ofgem smart-charging action plan and Project Shift findings.
Research and trials worth following
Non-exhaust particles
EIT Urban Mobility, TfL and the GLA commissioned e:misia to compare technical and travel-behaviour interventions. Its London scenarios use an LAEI 2019 baseline; they should not be read as current measured emissions.
Study and modelling contextFrom neighbourhood to lung
Imperial's INHALE work connects urban airflow and personal exposure with biological responses. It illustrates why an intervention's effect on exposure needs testing, rather than judging success from its appearance.
INHALE researchCommercial fleet charging
Optimise Prime collected data from more than 6,000 commercial EVs across home, depot and private-hire workstreams. Its outputs inform charging profiles and network planning; they are not a present-day capacity map.
UK Power Networks: Optimise Prime dataFaster connection processes
UK Power Networks' Net Zero AI Accelerator runs from August 2026 to March 2027. It is developing more efficient connection and customer-information processes; this is an active programme, not evidence that local capacity constraints have disappeared.
Project scope and datesResearch status checked 22 October 2026. These are external programmes; no ACP partnership or project involvement is implied.
Turn the evidence into a coordinated project brief
For an electric fleet or charging development, align traffic, operating hours, charging demand and connection arrangements. Include any standby generator, ventilation and cooling plant in the air and noise scope. Review pedestrian exposure and servicing alongside the energy strategy so one decision does not create an avoidable problem elsewhere.
01 / The London planning framework
What does London air quality policy require?
Start with London Plan 2021 Policy SI 1 and the relevant borough development plan. Under SI 1, major development proposals require an air quality assessment. However, other proposals may also need evidence because of their location, emissions or future occupants.
Assessment should address development impacts and exposure. Air Quality Neutral adds an emissions-benchmark test; Air Quality Positive concerns opportunities to improve air quality through wider design.
SI 1 also addresses construction emissions, machinery and mitigation. Design measures should be considered early, when layouts and energy choices can still change.
- 01
Locate
Borough, policy, AQMA and nearby sources.
- 02
Scope
Impacts, future exposure, Neutral and Positive.
- 03
Test
Baseline, monitoring or modelling matched to the question.
- 04
Coordinate
Layout, ventilation, plant, transport and construction.
Original process graphic
Air quality assessment
Examine the baseline, relevant receptors and changes associated with the proposal. This may include traffic, combustion plant, construction dust and the exposure of future users. Therefore, the scope depends on the scheme and setting.
Air Quality Neutral
The GLA guidance considers building and transport benchmarks separately. Some development without additional emissions sources is excluded; minor schemes may use a simplified route. In either case, record the basis and check the borough’s requirements.
Air Quality Positive
The adopted GLA approach covers relevant masterplans and qualifying large-scale EIA applications, including applications without a masterplan. It records how design maximises air quality benefits. In addition, borough policy can extend the local scope.
02 / A useful starting point
London air quality planning-route checker
Answer six questions to build a preliminary scope for your project. This checker identifies topics to review; it does not certify compliance or decide whether permission will be granted.
Based on adopted London Plan SI 1 and the 2023 GLA guidance. Borough requirements remain a separate check. Answers stay in this page and are not submitted.
03 / Local planning detail
London borough air quality guidance finder
Choose from all 32 boroughs and the City of London. Each profile links to official planning guidance or local air quality evidence, with its status and the next project check. To begin, select a council to focus the list. Read the adopted plan, validation list and environmental health guidance together.
Barking and Dagenham
Local Plan air quality policy and 2026 checklist
Local Plan policy DMSI 4 addresses major-development assessment, AQN and large-scale Air Quality Positive statements. The council also publishes a February 2026 full-application checklist.
Project check: Use DMSI 4 and the current application checklist together; coordinate air quality, overheating and acoustics in the design.
Barking and Dagenham council guidance
For local policy, monitoring and a project checklist, use our Barking and Dagenham air quality assessment guide.
Barnet
New design SPD — June 2026
The Sustainable Design and Development Guidance SPD was adopted on 15 June 2026, replacing the 2016 design/construction guidance. The application checklist separately identifies AQA, AQN and large-scale EIA/AQP requirements.
Project check: Use the 2026 edition and check the proposal against the current validation list, including minor development in poor-air-quality locations.
For local policy, monitoring and a project checklist, use our Barnet air quality assessment guide.
Bexley
Published planning and monitoring evidence
The council’s 2025 annual-status reporting records its use of air quality assessment, construction-dust monitoring and AQN/AQP evidence in planning.
Project check: Use the report for local context; obtain the application-specific validation requirements and conditions rather than treating reporting statistics as thresholds.
For local policy, monitoring and a project checklist, use our Bexley air quality assessment guide.
Brent
Local Air Quality Positive scope
Brent’s development guidance says major schemes in an Air Quality Focus Area or Growth Area should achieve Air Quality Positive. Its guidance also covers construction emissions and NRMM.
Project check: Check the council policy map for the site and read the Sustainable Environment and Development guidance with policy BSUI2.
For local policy, monitoring and a project checklist, use our Brent air quality assessment guide.
Bromley
Planning validation guidance — January 2025
The validation guidance identifies major development, potentially polluting or traffic-generating proposals in AQMA/AQFA areas, and uses occupied by particularly vulnerable people.
Project check: Read the checklist for the application type alongside the full guidance. Distinguish AQA, Neutral and Positive evidence rather than treating the checklist headings as interchangeable.
For local policy, monitoring and a project checklist, use our Bromley air quality assessment guide.
Camden
Adopted CPG and emerging Local Plan
The council lists Air Quality CPG dated January 2021. Its new Local Plan page still distinguishes the submitted draft from the current 2017 Local Plan.
Project check: Read the adopted CPG with current validation requirements. Identify emerging provisions separately when discussing the site.
For a project-specific starting point, use our Camden air quality assessment and monitoring guide.
City of London
Revised SPD — implementation condition
The council reports adoption of its revised Air Quality SPD on 22 June 2026. It says full implementation is tied to adoption of the City Plan.
Project check: Confirm which SPD applies on the submission date. The council page also distinguishes AQN exclusions, major-development assessment and Air Quality Positive statements.
City of London council guidance
For local policy, monitoring and a project checklist, use our City of London air quality assessment guide.
Croydon
Council planning guidance — older document
Croydon publishes air quality planning guidance covering development effects and exposure. Older policy references in the linked guidance need checking against the current development plan.
Project check: Use the guidance to identify the issues, then confirm current policy and validation requirements for the application.
For local policy, monitoring and a project checklist, use our Croydon air quality assessment guide.
Ealing
Air quality strategy and local evidence
Ealing publishes an Air Quality Action Plan for 2022–27 and an Air Quality Strategy for 2020–30. These provide local context for transport, development and exposure.
Project check: Check the current development plan and application validation list. Older air quality SPG references need cross-reading with London Plan 2021 and adopted GLA guidance.
For local policy, monitoring and a project checklist, use our Ealing air quality assessment guide.
Enfield
DMD 65 and September 2026 validation
The council links its 28 September 2026 non-householder checklist. Read its air-quality entry with adopted DMD 65, relevant area plans and London Plan SI 1.
Project check: Review major development, exposed sensitive uses, substantial demolition or earthworks and significant traffic effects. Select the checklist for the application type.
For local policy, monitoring and a project checklist, use our Enfield air quality assessment guide.
Greenwich
Core Strategy E(c) and Climate Resilience SPD
The Climate Resilience SPD replaced the Greener Greenwich SPD following the 18 March 2026 adoption decision. Use the adopted Core Strategy, current London policy and the local validation list.
Project check: Distinguish the emerging Royal Greenwich 2040 plan from adopted policy. Coordinate road exposure, construction, ventilation and the relevant monitoring baseline.
For local policy, monitoring and a project checklist, use our Greenwich air quality assessment guide.
Hackney
Air Quality Action Plan — adopted 2026
Hackney confirms adoption of its 2026–30 Air Quality Action Plan and provides annual-status reports with monitoring and planning information.
Project check: Use the latest monitoring evidence and the separate planning validation checklist. The action plan provides context, not a universal application threshold.
For a project-specific starting point, use our Hackney air quality assessment and monitoring guide.
Hammersmith and Fulham
Climate Change SPD — adopted October 2023
The council adopted its Climate Change SPD in October 2023. It includes air quality within guidance on sustainable design, energy, transport and development.
Project check: Read its air quality principles with Local Plan CC10, the current validation list and GLA assessment guidance.
Hammersmith and Fulham council guidance
For local policy, monitoring and a project checklist, use our Hammersmith and Fulham air quality assessment guide.
Haringey
Development Management policy DM23
Haringey’s published Development Management document sets out DM23: consider both effects on local air quality and exposure of future occupants, with assessment for major and other appropriate proposals.
Project check: Check the current plan position and validation list. Use the older Sustainable Design and Construction SPD for supporting detail with current regional guidance.
For local policy, monitoring and a project checklist, use our Haringey air quality assessment guide.
Harrow
New Local Plan — March 2026
Harrow adopted its 2021–2041 Local Plan on 24 March 2026, replacing the 2012/2013 plan. The adopted plan and policy maps are available through the council’s plan page.
Project check: Check the new plan’s air quality provisions and current validation evidence; do not base a submission solely on superseded plan references.
For local policy, monitoring and a project checklist, use our Harrow air quality assessment guide.
Havering
Supporting information and validation route
Havering’s application guidance directs applicants to the national framework, London Plan and Havering Local Plan. A separate validation-list consultation is not proof that its draft requirements are operative.
Project check: Use the council’s current supporting-information page to identify the applicable list, then confirm AQA, AQN, dust and exposure evidence for the proposal.
For local policy, monitoring and a project checklist, use our Havering air quality assessment guide.
Hillingdon
Local Plan Part 2 — air quality context
Hillingdon’s Development Management Policies identify particular air quality issues near major roads and Heathrow, including new exposure and deterioration affecting existing residents.
Project check: Read the air quality provisions with current validation and London guidance. Identify road, airport and plant sources relevant to the actual site.
For local policy, monitoring and a project checklist, use our Hillingdon air quality assessment guide.
Hounslow
Adopted design guidance — May 2024
Hounslow adopted its Character, Sustainability and Design Codes SPD on 14 May 2024. It provides borough-wide and neighbourhood design guidance relevant to the site layout.
Project check: Check the air quality policy and validation requirements separately, alongside the adopted design guidance. Consider airport, road and other relevant sources for the particular site.
For local policy, monitoring and a project checklist, use our Hounslow air quality assessment guide.
Islington
Local Plan 2023 and Climate Action SPD 2025
Islington adopted its Local Plan in September 2023 and Climate Action SPD in September 2025. The latter replaces the older Environmental Design SPD.
Project check: Check the local Air Quality Positive scope as well as the London-wide starting point; do not assume the two are identical.
For a project-specific starting point, use our Islington air quality assessment and monitoring guide.
Kensington and Chelsea
Council air quality planning guidance
The council’s air quality service links to planning guidance addressing emissions from new development, conversions and changes of use.
Project check: Check the applicable Air Quality SPD, current Local Plan and validation list, including exposure, energy plant and construction controls.
Kensington and Chelsea council guidance
For local policy, monitoring and a project checklist, use our Kensington and Chelsea air quality assessment guide.
Kingston upon Thames
Action-plan and planning evidence
Kingston’s published 2021–26 action plan includes London Plan AQN implementation and planning conditions for relevant proposals.
Project check: Check for a successor action plan and use the current planning validation requirements; the action-plan period alone does not establish today’s application scope.
Kingston upon Thames council guidance
For local policy, monitoring and a project checklist, use our Kingston upon Thames air quality assessment guide.
Lambeth
Planning guidance and CHP information
Lambeth’s guidance index provides air quality planning notes and a CHP information-request form, alongside archived annual monitoring reports.
Project check: Check the current Local Plan and validation list. For combustion plant, assemble the specification, emissions, flue and operating details requested by the council.
For a project-specific starting point, use our Lambeth air quality assessment and monitoring guide.
Lewisham
Council assessment-scoping guidance
Lewisham identifies traffic changes, new exposure, construction effects and conflict with action-plan measures as assessment considerations. Its examples are not an exhaustive trigger list.
Project check: Build the assessment around baseline and future conditions, relevant pollutants and mitigation, then check current validation and London requirements.
For local policy, monitoring and a project checklist, use our Lewisham air quality assessment guide.
Merton
Air Quality SPD — adopted June 2021
Merton’s dedicated SPD covers major development, new exposure including conversions, and smaller sources such as commercial kitchens and basement works.
Project check: Read it with Local Plan 2024 policy P15.10 and the validation checklist. The latter separately covers AQA and AQN, including the simplified route.
For local policy, monitoring and a project checklist, use our Merton air quality assessment guide.
Newham
Planning conditions and local monitoring
Newham describes its use of planning conditions, AQN building/transport requirements and mitigation of pollution sources and exposure. Its air quality page provides local monitoring resources.
Project check: Review the current validation list and site-specific conditions. Match monitoring locations and data years to the assessment question.
For local policy, monitoring and a project checklist, use our Newham air quality assessment guide.
Redbridge
Local planning application requirements
Redbridge’s validation gateway links the full Local Planning Application Requirements. Its quick matrix is only a guide and does not replace the detailed document.
Project check: Check the detailed air quality and AQP entries, including proposal scale, exposure and the relevant EIA/referral categories.
For local policy, monitoring and a project checklist, use our Redbridge air quality assessment guide.
Richmond upon Thames
Separate AQA, Neutral and Positive entries
The council’s validation checklist distinguishes AQA, AQN and AQP evidence. It includes major development and certain minor proposals within or beside Air Quality Focus Areas.
Project check: Use the checklist with the Air Quality SPD and current Local Plan; check the site’s mapped context and the EIA position.
Richmond upon Thames council guidance
For local policy, monitoring and a project checklist, use our Richmond upon Thames air quality assessment guide.
Southwark
Planning submission checklist
The council’s full-application checklist requests an air quality assessment for major development. It identifies baseline, construction, operational effects and mitigation.
Project check: Read the checklist with Southwark Plan policy and the council’s technical guidance. Agree any site-specific modelling or monitoring requirements.
For a project-specific starting point, use our Southwark air quality assessment and monitoring guide.
Sutton
Development assessment guidance
Sutton’s guidance identifies proposal scale, nearby sensitive receptors, existing poor air quality and increased vehicle movements as reasons to consider assessment.
Project check: Address baseline, construction, operational effects, AQN and future-occupant exposure; explain any omitted scope and check current application requirements.
For local policy, monitoring and a project checklist, use our Sutton air quality assessment guide.
Tower Hamlets
Air quality and planning guidance
The council publishes an air quality planning page and a separate validation entry. Its listed assessment triggers include major schemes and sensitive development in poor-air-quality settings.
Project check: Check the flowchart and the authority’s requested AQA, AQN, AQP and dust documents for the actual proposal. Some older validation references need cross-reading with current London policy.
Tower Hamlets council guidance
For a project-specific starting point, use our Tower Hamlets air quality assessment and monitoring guide.
Waltham Forest
Full-application validation checklist
The published checklist covers sensitive uses in poor-air-quality areas, traffic effects and possible conflict with the action plan. It requests construction and operational evidence with mitigation.
Project check: Use the current checklist edition and Local Plan together, including cumulative effects and the proposed occupation year.
Waltham Forest council guidance
For local policy, monitoring and a project checklist, use our Waltham Forest air quality assessment guide.
Wandsworth
Air quality planning flowchart — July 2020
Wandsworth’s published guidance sets out AQA, AQN and dust-management submissions for major development, alongside site, receptor and mitigation information.
Project check: Cross-read this older flowchart with the current Local Plan and GLA2023 guidance; use current assessment methods rather than its superseded reference editions.
For a project-specific starting point, use our Wandsworth air quality assessment and monitoring guide.
Westminster
Adopted guidance — February 2026
The Environment SPD was adopted on 13 February 2026. Use this edition alongside the City Plan when preparing the air quality submission.
Project check: Check the air quality chapter, design response and current validation requirements. Avoid relying on the superseded 2022 guidance.
For a project-specific starting point, use our Westminster air quality assessment and monitoring guide.
Sources checked 18 October 2026. Coverage includes every London authority; the depth and type of available evidence varies. These profiles support application scoping rather than a complete policy audit. Follow the council source to check changes before submission.
Practical tools / Build your brief
London Neutral, Positive and monitoring tools
Use these two tools to organise your next assessment step. Your answers stay in the page. You can use the resulting checklist when discussing the project with us.
Air Quality Neutral / Positive evidence planner
Identify the AQN evidence route and record the four AQP design themes. For AQP, check qualifying large-scale EIA applications as well as masterplans; borough policy can extend the scope.
Sources: GLA AQN 2023 and GLA AQP 2023. A full emissions calculator requires the applicable building/transport inputs and benchmarks.
Construction-dust screening and monitoring brief
Check the initial receptor-distance screen, then choose the question your monitoring should answer. Measure from the site boundary. Leave a distance blank if it has not been established.
Distance screening: human receptors within 250 m, ecological receptors within 50 m, and the vehicle-route check above. Boundary values are conservatively included. Sources: IAQM construction dust v2.2 (2024), Box 1; IAQM monitoring v1.1 (2018); EPUK/IAQM planning v1.2 (2017). NO₂ is a separate pollutant-specific scope.
Guidance register checked 18 October 2026: IAQM lists the planning, construction-dust and construction-monitoring documents above as the published editions while updates are in progress. Check the IAQM guidance register.
04 / Evidence that fits the site
How our London air quality consultants use evidence
Air quality monitoring and modelling in London should answer a defined planning question.
A roadside flat, a school playground and a rooftop air intake can have very different exposure conditions. The evidence should match the pollutant, location, height and period relevant to the decision.
Baseline and background review
Start with suitable council monitoring, mapped background data and relevant local sources. Check the year, completeness and station setting. For example, a nearby monitor may not represent a sheltered courtyard or a busy junction.
Monitoring design
Define the question before choosing equipment. Nitrogen dioxide diffusion tubes can support longer-term spatial assessment. Continuous instruments can examine time patterns and particulate conditions, with an appropriate quality-control plan.
Modelling and interpretation
Where needed, assess road or plant emissions using an appropriate dispersion approach. Document traffic, emission rates, meteorology, background assumptions and model checks. Finally, explain uncertainty and use the findings to test practical design choices.
For wider methods and assessment scopes, visit our air quality assessment service.
Monitoring duration, equipment specification and analysis should follow the project objective and any agreed authority requirements. A short monitoring period should not be presented as an annual average without an appropriate adjustment method and its limitations.
Use one set of project assumptions
Align traffic, plant schedules, operating hours, weather and monitoring timestamps before comparing air and noise results. Retain data gaps and quality flags. A correlation can suggest a relationship; it does not by itself establish causation or a transferable mitigation benefit.
Methods / traceable evidence
From London datasets to a defensible assessment
Our dispersion-modelling work uses ADMS-Roads and ADMS 6 where appropriate to the source and assessment question. The report should identify its actual model build, inputs, verification and uncertainty. Software choice supports the analysis; the strength of the assessment comes from the evidence and its interpretation.
Traffic and source inputs
Defra’s EFT v14.2 calculates road-vehicle emission rates using year, speed, road type and fleet assumptions. Check London fleet settings, traffic inputs and non-exhaust particles. The LAEI adds the wider London emissions context.
Defra EFT v14.2 and user guideRoads, plant and receptors
Use ADMS-Roads for appropriate road-source assessments and ADMS 6 for suitable industrial or combustion-source applications. Test meteorology, buildings, terrain and receptors where relevant; document background and NOₓ-to-NO₂ treatment.
CERC: ADMS 6.0.2 / ADMS-Roads 5.1Published release families checked 22 October 2026; the project report records the build used.
R, openair and spatial analysis
Openair supports reproducible time-series, wind/pollution roses, polar plots and trend analysis. Pair these with mapped receptors and source locations. A directional association is evidence to investigate, rather than proof of a unique source.
Carslaw: The openair bookCarslaw & Ropkins (2012), Environmental Modelling & Software, 27–28: 52–61. Paper and DOI.
The method must match the decision
Use EPUK/IAQM planning guidance alongside London Plan SI 1 and borough requirements. Record the assessment year, relevant exposure, model verification, cumulative scenarios and mitigation. A screening result, emissions benchmark and detailed dispersion assessment answer different questions.
IAQM guidance register: planning guidance 2017 v1.2 remains listed while its update is in progress. Check current construction-dust and monitoring guidance separately.
London data in the wider UK picture
The London Atmospheric Emissions Inventory (LAEI) describes emissions and modelled concentrations. London Air, AURN and council monitoring supply measured evidence. Use each at its appropriate scale, with the dataset year and quality status recorded.
Defra’s Air Pollution in the UK 2025, published in October 2026, provides the national compliance assessment. This is distinct from local AQMA management and an individual planning assessment. It also covers pollutants beyond NO₂ and particles, including ozone, sulphur dioxide, benzene and metals.
GLA LAEI 2022, revised May 2026 · London Air monitoring · Defra AURN
05 / Construction and machinery
Construction dust and London NRMM requirements
Assess dust from demolition, earthworks, construction and trackout. Use the risk assessment to define site controls, responsibilities, inspection records and any monitoring requirements. In particular, nearby homes, schools and other sensitive receptors can affect the approach.
The London NRMM Low Emission Zone covers relevant construction machinery rated 37–560 kW. Since January 2025, the general London-wide minimum has been Stage IV. Engine categories where Stage IV does not exist, including constant-speed generators, need particular attention to Stage V requirements.
Check the machine category, registration and any approved exemption against the official London NRMM requirements. Then include relevant plant information in the construction brief.
For a combined construction scope, coordinate dust with noise assessment, working hours and the site management plan.
06 / Practical design decisions
Bring air, noise and odour into one coordinated brief
London sites often have limited space for plant, ventilation and servicing. For this reason, resolve the relationships early: moving an intake away from a road may introduce a noise issue elsewhere, while an extract discharge may affect nearby windows.
For commercial kitchens, consider cooking odour and extract-fan noise alongside any relevant combustion or traffic effects. First, identify the sources, neighbours, operating hours and proposed discharge arrangement in one brief, then define the technical assessment for each issue.
Explore our odour assessment and noise assessment services. As a result, a shared site description helps coordinate recommendations without mixing their assessment criteria.
- 01
Reduce at source
Review combustion, traffic, servicing and extract emissions.
- 02
Coordinate the design
Test intake and discharge locations with air, noise and overheating requirements.
- 03
Secure the measures
Record performance, access, maintenance and verification in one mitigation schedule.
Original process graphic
Cumulative effects and shared design decisions
Where relevant, include other committed development, traffic and emission sources in the assessment scenarios. Check what the background data already contain to avoid double-counting. Cumulative pollutant effects are a separate question from the way one mitigation measure affects air quality, noise, heat or energy. Record both in the shared design brief.
Illustrative design question
A mixed-use proposal introduces homes above a commercial unit beside a busy road. The initial brief should address future residents’ exposure, the energy strategy, extract locations, servicing and construction. The resulting scope follows those sources and receptors. Mechanical ventilation may help manage outdoor exposure and acoustic constraints, but its intake position, filtration, fan noise, overheating strategy, energy use and maintenance must work together. It is not a universal substitute for controlling emissions.
07 / Prepare your brief
What to send for a London air quality assessment
Send the information you already have. These details help us define the right scope and identify any missing inputs:
- Site address, London borough and planning reference, if available.
- Proposed uses, homes or floorspace, and the application stage.
- Site layout, building heights, nearby receptors and ventilation proposals.
- Parking, traffic or servicing information and the energy strategy.
- Plant, generator or flue specifications, where relevant.
- Demolition or construction details and any council request or condition.
Our air quality consultants agree the London project scope with you. The output may include an assessment report, an AQN calculation, an AQP statement, a dust assessment or a monitoring proposal. We identify the required documents and scope before the work begins.
08 / Policy status
Adopted guidance and the next London Plan
Current planning basis
This page’s route checker uses London Plan 2021 SI 1 and the adopted 2023 AQN/AQP guidance, with borough checks kept separate.
Draft London Plan 2026
The consultation ran from 16 July to 15 October 2026 and has now closed. The draft is an emerging policy document, not an adopted replacement. Therefore, its status and any relevant proposals should be considered separately for the application.
Read the draft London Plan consultation information and the closed consultation notice.
Local updates matter too. Westminster’s adopted 2026 Environment SPD and the City of London’s revised SPD implementation condition illustrate why document dates alone are not enough: adoption, commencement and superseded guidance need separate checks.
09 / Common questions
London air quality assessment questions
Does every London development need an air quality assessment?
Major proposals require an assessment under London Plan SI 1. Smaller proposals may also require evidence because of the site, use, emissions or borough requirements. Use the route checker to identify the issues for scoping.
Is Air Quality Neutral the same as an air quality assessment?
They address different questions. AQN checks building and transport emissions against benchmarks, while an assessment considers effects and exposure. Meeting the AQN benchmarks does not by itself resolve every site-specific air quality issue.
Does a car-free scheme automatically pass Air Quality Neutral?
However, parking is only one part of the review. Check the energy strategy, relevant vehicle movements and the GLA exclusions or simplified procedure. Explain the proposed route in the submission and consider the wider assessment scope.
Can a minor development need a full assessment?
Yes. The GLA guidance recognises that a borough may require a full assessment for a minor scheme because of its nature or location, including an Air Quality Focus Area. Therefore, check the local requirements before assuming the simplified route is sufficient.
Can your air quality consultants arrange monitoring in London?
Our air quality consultants can help define a monitoring scope for a London project, including the pollutant, locations, duration, equipment requirements and analysis. Start with the decision the monitoring needs to support and any authority request.
How long will the assessment take and what will it cost?
This depends on the scope, available drawings and data, modelling needs and any monitoring period. Send the proposal and planning deadline so we can discuss a proportionate scope, programme and quotation.
Discuss your London air quality project
Send the site location, borough, proposal and planning stage. Include any council request or condition so we can discuss the assessment scope and next steps.
We can help bring together air quality assessment, AQN, monitoring and construction requirements in a clear project brief.
0330 236 7329
hello@acp-consultants.com
For the wider service, explore our air quality assessment page.
Your details are handled under our privacy policy.
Sources / London and borough guidance
Primary sources and further reading
The council links in the borough finder sit alongside these London-wide sources. Check the applicable edition and local submission requirements for each project.