Planning & Development
Coordinate access, flood risk, drainage and wider assessments with retained habitats, trees and ecological mitigation.
Explore planning and development servicesOur ecology and biodiversity services help you understand your site, choose the right assessments and bring evidence into your design.
Start with habitats, protected species, trees or a planning request. We will help you clarify the questions and coordinate the next steps.

A habitat calculation, a species survey and a tree assessment each answer a different question. However, their findings often influence the same design decisions.
For example, a retained tree may also provide habitat. Lighting, access and drainage proposals can affect both. Therefore, share one current layout across the project team.
Our ecology and biodiversity services connect these workstreams. The aim is a clear brief, proportionate evidence and practical advice for your next decision.
Understand the baseline, potential effects and opportunities for enhancement. Where BNG applies, coordinate habitat proposals and calculations.
Identify relevant species questions. Then use appropriate surveys to inform avoidance, mitigation and any licensing considerations.
Consider retention, roots and canopies alongside access and services. Arboricultural and ecological advice should inform each other.
Use your project question to find the relevant service. If several rows apply, discuss them together so the scopes and programme align.
| Service | When to explore it | A useful first step |
|---|---|---|
Ecology surveys | You need to understand habitats, ecological constraints or what further surveys may be necessary. | Begin with an appraisal of the site and proposal. Then agree any targeted surveys. Share your boundary, drawings and earlier reports. |
Biodiversity net gain | Your proposal in England needs a review of BNG requirements, habitat change or a biodiversity delivery strategy. | Check the applicable route first. Then align the habitat baseline, metric and layout. BNG calculations do not replace species evidence. |
Bat surveys | Works could affect buildings, trees, roost features or habitat used by bats. | Share photographs, demolition or conversion plans and lighting proposals. Initial assessment helps determine any further survey work. |
Reptile surveys | Clearance or construction could affect suitable grassland, scrub or other reptile habitat. | Provide habitat photographs and the proposed works area. Survey findings can then inform avoidance, mitigation and construction timing. |
Great crested newt surveys | Ponds or surrounding terrestrial habitat could be relevant to your proposal. | Share available pond information and the site boundary. Then discuss survey requirements and any available licensing route. |
Bird surveys | Your proposal could affect nesting opportunities, breeding habitat or wintering birds. | Describe the habitat, proposed works and intended dates. A nesting check and a breeding or wintering survey answer different questions. |
Tree surveys | Trees on or beside the site could influence buildings, access, services or construction space. | Share the topographical survey and layout. Arboricultural advice can then inform retention, root protection and working methods. |
These are starting points, not a complete list of ecological constraints. Protected sites, other species and local policy may also affect your proposal.
Good coordination starts before fieldwork. First, establish what the proposal could affect and what information already exists. Then agree which investigations will answer the remaining questions.
As the design changes, tell the assessment team. Otherwise, a report may refer to an earlier layout or miss a newly affected area.
Deliverables vary by service. Your quotation should identify what is included.
Provide the boundary, current drawings, existing reports and council correspondence. Also explain the decision or deadline you are working towards.
Review the available evidence and likely effects. Then agree the surveys, access arrangements and sequence of work.
Consider avoidance and retention early. Coordinate mitigation, habitat proposals, tree protection and relevant lighting or construction details.
Bring the agreed reports and plans together. Finally, identify any further evidence or implementation requirements for the next project stage.
A useful programme recognises survey dependencies. Similarly, a useful quotation explains its scope rather than offering a single price for every site.
Some species surveys need specific seasons, suitable weather or more than one visit. As a result, late commissioning can affect the submission programme.
Share your intended dates early. However, do not assume that a single site visit will answer every ecological question.
Explore the relevant species page for more detail, then confirm the programme for your site.
Site size, habitat complexity, access and survey effort all affect the scope. Reporting, design changes and follow-up advice can also influence the fee.
To help us prepare a useful quotation, send your site location, boundary, proposal and any existing evidence. Also flag urgent council deadlines.
Discuss scope, timing and a quotationStart with the information you have. These answers explain how to approach the scope without assuming every site needs the same package.
Further reading for projects in England:
Natural England: protected species and developmentGovernment planning guidance on BNGPlanning practice guidance: natural environmentRequirements elsewhere in the UK differ. Confirm the applicable framework for your site.
Start with the site boundary, proposed works and any existing reports. An initial ecology appraisal can identify the main constraints and further evidence needed. However, share a specific council request at the outset: it may identify an immediate survey or reporting requirement.
No. BNG measures changes in habitat value. In contrast, protected species work considers particular species, their habitats and the effects of your proposal. Your project may need both, so coordinate the scopes and drawings from the start.
No. Survey requirements depend on the site, surrounding habitats, proposed effects and available evidence. Therefore, commission a proportionate scope rather than a standard bundle of surveys. The selection guide helps you identify questions to discuss; it is not a survey prescription.
Some appraisal work can begin at different times of year, although seasonal limitations may affect the findings. Species surveys often need suitable seasons, weather and repeat visits. Therefore, agree the required methods and programme before fixing your planning submission date.
Share it for review alongside the current drawings. Its usefulness depends on the methods, survey dates, site changes and proposed works. For example, a revised layout may affect areas outside the original assessment. Earlier evidence can help, but an update may still be necessary.
The fee depends on the site, scope, access, survey visits and reporting requirements. First, send your location, proposal and any council correspondence. We can then discuss an appropriate scope and quotation, including assumptions and any further work that may follow.