ACP helps developers, architects and planning teams prepare energy and sustainability evidence for development proposals. Start with the requirements for your site, then build a coordinated strategy around the design.

A useful statement explains how each requirement changes the proposal.© 2026 ACP Consultants Ltd.
Policy-led scopeRequirements checked for the development and location
Coordinated evidenceEnergy, comfort and environmental constraints considered together
Clear next stepsSubmission needs and later evidence distinguished

Understand the scope

What is an energy and sustainability statement?

An energy statement explains a development’s predicted energy use, carbon emissions and proposed reduction measures. A sustainability statement addresses the wider environmental requirements relevant to the proposal. Councils may request separate documents or a combined report.

The value lies in the evidence: which policies apply, what the design achieves and how the commitments will be delivered. A generic list of green technologies cannot answer those questions. Equally, a planning statement should distinguish confirmed specifications from assumptions that still need design work.

Related documents serve different purposes.
DocumentMain purposeRelationship to the statement
Energy statementMain purposeEnergy demand, carbon performance and feasible reduction measures.Relationship to the statementForms the energy evidence for the planning case.
Sustainability statementMain purposeResponse to relevant environmental and sustainable-design policies.Relationship to the statementBrings the agreed measures and supporting assessments together.
SAP, SBEM or energy modellingMain purposeCalculations using the appropriate building method and assumptions.Relationship to the statementProvides technical evidence; the calculations alone do not explain every planning requirement.
EPC or BREEAM assessmentMain purposeAn energy rating or a broader assessment against a defined certification scheme.Relationship to the statementMay be relevant evidence, but neither automatically replaces a planning statement.
Environmental StatementMain purposeThe formal reporting document where Environmental Impact Assessment is required.Relationship to the statementA different process and scope; a sustainability statement is not an Environmental Statement.

Start with the site

Do you need an energy or sustainability statement for planning?

Check the council’s current validation requirements alongside the development plan and relevant guidance. The answer can depend on the number of homes, floor area, use, development type and application stage. A conversion or smaller scheme can still need evidence where a local requirement applies.

Major developments commonly face more detailed requirements. However, there is no single nationwide size threshold that tells every applicant which combined report to submit. Do not assume that meeting Building Regulations resolves the planning requirements.

For outline applications, agree which principles and feasibility evidence are needed now. For detailed applications, the design and calculations usually need closer alignment. Reserved matters, revised schemes and condition discharge may require further evidence.

The policy framework

How national policy, local requirements and Building Regulations fit together

The report should identify the policy position at the date of the application. National policy, regional or strategic plans, council policies and validation requirements have different roles. An emerging policy or consultation document must be labelled clearly.

01 · National planning policy

Mitigation and adaptation

The current NPPF separates plan-making from national decision-making policies. CC1 addresses climate change in plans; CC2 covers mitigation in proposals; CC3 addresses adaptation over a scheme’s lifetime. Energy conservation, reuse and resilience therefore need a joined-up design response.

Read NPPF climate policies CC1–CC3[1]
02 · Local planning requirements

Check the policy and its status

Local plans and supporting guidance establish the site-specific requirements. NPPF PM13 sets conditions for local energy efficiency standards beyond current or proposed Building Regulations, including justification, viability and the way the standard is expressed. Check how the current framework affects the particular policy.

Read NPPF policy PM13[2]
03 · Building Regulations

A separate compliance route

Building Regulations address building standards through their own procedures. Part L energy performance, ventilation and overheating requirements may influence the same design, but planning approval and building-control approval remain separate decisions. The statement should name the calculation method, regulatory baseline and applicable version.

Check the approved documents[3]

Which regional and council requirements apply?

Start with the national framework, then identify any applicable regional or strategic development plan. Next, check council policies, supplementary guidance and the local validation list. Finally, match each requirement to the proposal’s location, scale, use and application stage.

These sources do different jobs. A policy sets the planning expectations; a validation list identifies supporting information needed with an application. A regional climate ambition is not automatically a project-specific assessment requirement. Record each document’s status, date and relevant provisions. See the national explanation of the plan-led system[10].

Policy review: 25 October 2026.

The NPPF was revised on 29 September 2026. Its implementation provisions matter when assessing older local policies. Do not rely on a superseded paragraph reference or an older council webpage without checking the current framework. Read the implementation provisions.[4]

Future Homes and Buildings Standards: check the transition

The 2026 regulations have a principal commencement date of 24 March 2027, with separate timing for specified higher-risk building work. Transitional arrangements also matter. Therefore, a project assessed in October 2026 should not automatically be described as subject to the future standard.

Record the anticipated application and construction programme, then check the applicable route. Our Future Homes Standard design-coordination guide explores the connections between energy, ventilation and noise. See the government’s commencement and transition circular[5] for the regulatory detail.

From policy to evidence

What should the statement include?

The scope should be proportionate to the scheme. A useful report connects each applicable requirement to a design response, supporting evidence and a clear delivery commitment.

A report framework to adapt to the application, rather than a universal submission checklist.
Report componentEvidence to explainKey check
Development and policy reviewEvidence to explainSite, uses, floor areas, drawings, policy references and submission requirements.Key checkAre the policy status, thresholds and document versions clear?
Baseline and methodEvidence to explainModelled building, calculation method, emissions factors and assessed energy uses.Key checkCan the reader compare the baseline and proposal on the same basis?
Demand reductionEvidence to explainFabric, airtightness, orientation, glazing, shading and building-services efficiency.Key checkDo the assumptions match the plans and outline specification?
Heat and renewable optionsEvidence to explainHeat networks, low-carbon heating, solar generation and relevant site constraints.Key checkAre selections supported by feasibility rather than a generic technology list?
Performance resultsEvidence to explainEnergy and carbon outputs, policy comparisons and residual emissions where relevant.Key checkAre units, boundaries, exclusions and calculations transparent?
Wider sustainabilityEvidence to explainApplicable measures for water, materials, waste, transport, ecology and climate resilience.Key checkDo supporting reports and drawings tell the same story?
Delivery and verificationEvidence to explainDesign commitments, responsibilities, later evidence and any monitoring requirements.Key checkWhich items are confirmed, assumed or still subject to agreement?

Design before equipment

Reduce demand, then assess how to supply it

01

Improve the building

Consider orientation, compact form, insulation, airtightness and thermal bridges. Balance useful daylight and winter solar gains against summer comfort. Coordinate ventilation with the fabric strategy.

Output: an agreed demand-reduction specification

02

Choose efficient systems

Assess heating, hot water, ventilation, controls and heat-network opportunities. For heat pumps, consider operating temperatures, plant space, electrical capacity, noise and maintenance access.

Output: a feasible building-services strategy

03

Integrate renewable energy

Test solar capacity against roof area, shading, orientation and competing uses. Consider installation, access and long-term operation. Explain why selected options suit the development.

Output: quantified measures that fit the design

A design sequence: reduce demand, select efficient systems and integrate renewable energy.© 2026 ACP Consultants Ltd.

What do SAP, SBEM and dynamic modelling contribute?

Domestic and non-domestic projects use different assessment methods. SAP is associated with dwelling energy assessment; SBEM and approved simulation methods serve non-domestic assessment routes. Dynamic thermal modelling may also test comfort, ventilation and overheating scenarios.

The report should identify the method and version appropriate to the project. Distinguish regulated energy from other uses, and explain mixed-use or shared-system boundaries. A compliance model is not a guarantee of actual energy bills: occupancy, controls, weather and operation all affect performance.

A simple worked example

How a carbon reduction percentage is calculated

Suppose an illustrative baseline produces 10 tonnes of carbon dioxide equivalent each year. The proposed design produces 6.2 tonnes on the same calculation basis. The reduction is 3.8 tonnes, or 38%.

Baseline
10.0 tCO₂e/year
Proposed design
6.2 tCO₂e/year

(10.0 − 6.2) ÷ 10.0 × 100 = 38% reduction

Hypothetical figures. A consistent baseline and assessment boundary make the comparison meaningful.© 2026 ACP Consultants Ltd.

This is an explanation of the arithmetic, not a project result, an approval threshold or an offset quotation. Actual assessments must use the required method, factors, scope and policy baseline. Separate stage reductions must not be double-counted.

Beyond operational energy

What else belongs in the sustainability strategy?

Resources and materials

Review water demand, efficient fittings, material selection, opportunities for reuse and construction waste. Explain which measures are committed and how the design supports them. Where required, a whole-life carbon assessment considers emissions beyond the building’s operation, using an agreed scope and methodology.

Movement, landscape and biodiversity

Coordinate cycle provision, access and other transport measures with the project’s transport evidence. Likewise, landscaping and habitat commitments should match the ecological work and any Biodiversity Net Gain assessment. A sustainability summary does not replace the supporting technical evidence.

Summer comfort and climate resilience

Consider shading, glazing, ventilation and the changing climate early. Avoid an energy strategy that depends on opening windows where noise or poor air quality makes that impractical. Water scarcity, drainage and other climate risks may also need specialist assessment.

For the wider assessment of hazards, vulnerability and adaptation, see our climate change impact assessment service. The energy statement should explain the interfaces without duplicating that work.

Certification where relevant

If a BREEAM or other certification requirement applies, identify the correct scheme, target and evidence stages. Confirm responsibilities with the appropriately qualified assessor. Do not promise a rating from a general sustainability narrative alone.

A distinct local framework

Energy statements in London

This section gives an overview of London’s assessment framework. The project brief still needs a check of the applicable GLA guidance and borough requirements.

London proposals require attention to the London Plan, the relevant borough’s policies and the current GLA guidance. Policy SI2 provides the energy hierarchy: be lean, be clean, be green and be seen. SI3 addresses energy infrastructure; SI4 addresses heat risk.

Major developments need detailed energy evidence under the London framework. The scope can include staged carbon reductions, heat-network feasibility, renewable generation and monitoring arrangements. Referable schemes also have specific GLA requirements, including whole-life carbon evidence where applicable.

Where an on-site shortfall remains, check the relevant offset arrangements, calculation basis and agreed payment mechanism. An offset is not a substitute for explaining feasible on-site reductions. Borough requirements and contributions must be verified for the particular application. Smaller schemes may also need evidence where borough policies or validation requirements apply.

Use the current GLA energy planning guidance[6] and applicable reporting tools. Confirm the baseline and guidance version before modelling, especially where national standards are changing.

Location changes the brief

Why council-specific requirements need their own check

The same building description can lead to different evidence requirements in different locations. Use the council’s current information, then reconcile it with the policy framework and application details.

London borough example

Westminster

The council publishes dedicated energy-statement advice. Review it with the City Plan, London requirements and the application’s scope.

Westminster energy statement guidance[7]
Outside London example

North Somerset

A dedicated energy-statement page explains local submission requirements. Check the stated development categories and thresholds rather than applying London’s approach.

North Somerset energy statement guidance[8]
Sustainability checklist example

West Oxfordshire

The council promotes a sustainability checklist through its climate-action planning guidance. Distinguish recommended design measures from the applicable submission obligations.

West Oxfordshire planning guidance[9]

Avoid conflicting assumptions

Coordinate energy with the wider design team

Reserve enough space for plant, distribution, ventilation and maintenance. Check roof layouts before committing to photovoltaic capacity. Test shading and glazing alongside daylight and summer comfort.

A noise assessment can inform plant locations and realistic window-opening assumptions. An air quality assessment can inform ventilation and air-intake design. Carry those findings into the energy and overheating assumptions.

For development requiring Environmental Impact Assessment, agree how the energy strategy connects with the relevant environmental topics. Keep descriptions, mitigation commitments and drawing revisions consistent across the submission.

Agree the deliverable before commissioning calculations

An energy statement and a Building Regulations calculation can use some of the same inputs while serving different decisions. The appointment should name the required output, its audience and the stage it supports. Asking only for “energy compliance” leaves too much unresolved.

Original scope comparison for a development in England
QuestionPlanning energy statementBuilding Regulations evidence
What decision is supported?The proposal’s response to applicable planning policies and information requirementsThe relevant building-control compliance decision
Which framework applies?Current national, strategic and local planning requirements relevant to the siteApplicable regulations, technical guidance and transition arrangements
What should the brief identify?Policy requirements, options, commitments and supporting performance evidenceRequired calculations, specifications and the relevant design or as-built stage
What must remain coordinated?Drawings, floor areas, building uses, fabric, services and renewable assumptionsThe same project inputs, with any method-specific differences explained
What does it not establish alone?Completion of the separate Building Regulations processA complete response to every applicable planning policy or condition

The NPPF information requirements should be read against the policies and circumstances they address. The Approved Documents provide guidance on meeting Building Regulations. Neither source supports treating every project as requiring the same report.

A calculation is evidence, not the whole planning argument

A calculation can demonstrate performance under a stated method. The planning statement also needs to explain the applicable requirement, design choices and commitments relevant to that application. Where a result is reused, identify the calculation version and the assumptions behind it. Do not copy a percentage into a different baseline without checking what it measures.

For example, a residential scheme might have design-stage energy results but no clear explanation of the local reporting requirement. The next task is to close that specific gap, not automatically commission the same calculation again. Conversely, a narrative strategy cannot substitute for calculations where those are needed.

Use one assumptions register

Record the drawing revision, building uses, floor areas, fabric specification, services strategy and renewable provision. Identify who controls each input and how changes reach the assessment team. Keep proposed commitments distinguishable from confirmed specifications. An equipment substitution or change in glazing may require review across several outputs.

The handover should state which evidence is complete, which is provisional and which will be checked later. Include the relevant planning conditions and building-control stage without suggesting that one approval automatically satisfies the other.

Check the transition against the real programme

The 2026 government circular gives 24 March 2027 as the general commencement date, with specified higher-risk provisions from 24 September 2027 and transitional conditions. Record the building type, submission route and programme, then confirm the applicable rules. The calendar year in a report title is not enough.

Use our Future Homes Standard coordination guide for the related energy, ventilation and noise interfaces. Keep any later revisions, as-built work or monitoring explicit in the commission.

References for this update

  1. NPPF Annex C: information requirements. Ministry of Housing, Communities and Local Government. 29 September 2026. Current policy
  2. Future Homes and Buildings Standards circular. Ministry of Housing, Communities and Local Government. 24 March 2026. Future commencement

How the work progresses

From initial brief to planning submission

01

Scope and review

Review the site, proposal, policy position and available drawings. Agree the required outputs, modelling inputs and interfaces with other consultants.

A defined scope and information request

02

Develop and test

Assess the proposed design and relevant options. Discuss gaps or constraints with the design team before fixing commitments in the report.

Coordinated assumptions and performance evidence

03

Report and respond

Prepare the statement for the agreed submission stage. Identify outstanding items and any later verification. Agree the scope of revisions or planning responses.

An application-ready report within the agreed brief

An assessment sequence: agree the scope, test the design and prepare the planning evidence.© 2026 ACP Consultants Ltd.

What happens after permission?

Planning conditions may require revised calculations, specifications, as-built evidence or monitoring. Design changes can also alter performance. Review the approved commitments before changing glazing, plant, ventilation or renewable capacity.

Condition discharge, detailed-design revisions and post-occupancy reporting should be scoped explicitly. They are not automatically included in every planning-stage commission.

How much does a statement cost, and how long does it take?

Fees and programme depend on the number and type of buildings, calculation needs, policy complexity and quality of the available information. Mixed-use schemes, option testing and GLA submissions can require additional work.

A useful quotation identifies deliverables, assumptions, included revisions and dependencies. Share your target submission date early so the programme can account for design decisions and missing inputs.

Prepare your enquiry

What information should you send?

  1. Site location, planning authority and application stage.
  2. Proposed uses, number of homes and approximate floor areas.
  3. Current plans, elevations and site layout, where available.
  4. Outline fabric, heating, hot-water and ventilation proposals.
  5. Planning advice, relevant conditions and existing assessments.
  6. Your programme and the decisions still open to discussion.

Common questions

Energy and sustainability statements: FAQs

Clear answers to the questions that shape the scope, evidence and programme.

Discuss your requirements
01

Is an energy statement the same as a sustainability statement?

No. The energy statement focuses on energy demand, carbon performance and the proposed energy strategy. The sustainability statement considers the broader policies relevant to the development. A combined report can cover both where that suits the council’s requirements.

02

Does every planning application need one?

No single rule requires a combined statement for every application. Check the local validation list, relevant policies, development category and application stage. Smaller schemes and conversions may still need evidence where a local requirement applies.

03

Can SAP calculations or an EPC replace the report?

Not automatically. Calculations and ratings answer specific technical questions. The planning report must also explain applicable policies, design choices, feasibility, commitments and any wider sustainability matters.

04

Can I use an energy statement template?

A template can help organise the headings, but it cannot establish the policy position or calculate your building’s performance. Replace generic claims with project-specific evidence and check every assumption against the drawings and specification.

05

Is a sustainability statement the same as an Environmental Statement?

No. An Environmental Statement is associated with the formal Environmental Impact Assessment process. A sustainability statement normally explains the proposal’s response to sustainable-design policies. The need for either document should be established separately.

06

Do conversions and refurbishment projects need energy evidence?

They can. The answer depends on the proposal and local requirements. Existing fabric, heritage constraints and the scope of building work may change the feasible measures and the appropriate assessment method.

07

Can planning conditions deal with all the detail later?

Not necessarily. The authority may need sufficient evidence before deciding the application. Agree what must be demonstrated at submission and what can reasonably follow through a condition, rather than assuming that all design decisions can wait.

08

Does a statement guarantee planning permission?

No. It supports the application by explaining relevant evidence and commitments. The planning authority considers the proposal against the applicable policies and other material considerations.

09

What if the design changes after the report?

Review any change that affects the assessed performance or agreed commitments. Updated glazing, heating, ventilation, floor areas or solar layouts may require revised calculations and reporting. Keep the assessment and drawing revisions aligned.

10

Does this guidance apply throughout the UK?

This page focuses on planning in England, including London. Scotland, Wales and Northern Ireland have different planning and building standards frameworks. Confirm the correct jurisdiction before applying the guidance.

Discuss your development

Turn the requirements into a clear project brief.

Tell us where the site is, what you are proposing and what the council has requested. We will help identify the energy and sustainability evidence to discuss.

Useful details to include

Application stage · building uses · available drawings · target submission date

Prefer to email? hello@acp-consultants.com
Or call 0330 236 7329.

Early-stage enquiries are welcome. The scope and deliverables will be agreed before work begins.

Start your enquiry

Three short steps. Only your email and the security check are required.

STEP 1 OF 3

Where should we reply?

Start with your email. Next, add your site location and project details.

STEP 2 OF 3

Where is your site?

Add an address, postcode or council area if known. You can leave this blank.

STEP 3 OF 3

What are you planning?

Share the information you have so we can discuss the right scope.

We handle your enquiry in accordance with our Privacy Policy.

Evidence and further reading

References, scope and review date

Guidance reviewed on 25 October 2026. These sources support the numbered references in the text. Follow a source title to read the guidance, or use the return link to find the relevant passage on this page.

  1. National Planning Policy Framework: climate policies CC1–CC3

    National planning policies addressing climate mitigation and adaptation.

    Back to national climate policy ↑
  2. National Planning Policy Framework: policy PM13

    The policy context for local energy-efficiency standards and their justification.

    Back to local energy standards ↑
  3. Approved Documents for Building Regulations

    Official technical guidance covering matters including energy, ventilation and overheating.

    Back to Building Regulations ↑
  4. National Planning Policy Framework: Annex A

    Implementation provisions to check when considering the framework alongside existing local policy.

    Back to policy implementation ↑
  5. Future Homes and Buildings Standards: Building Circular 01/2026

    Government information on commencement dates and transitional arrangements for the 2026 regulations.

    Back to regulatory transitions ↑
  6. Greater London Authority: energy planning guidance

    London guidance on energy assessments, reporting tools and supporting submissions.

    Back to London requirements ↑
  7. Westminster City Council: energy statements

    Local supporting-document advice to read alongside applicable Westminster and London policies.

    Back to the Westminster example ↑
  8. North Somerset Council: energy statement

    Council guidance on development categories and energy-statement submission requirements.

    Back to the North Somerset example ↑
  9. West Oxfordshire District Council: climate action through planning

    Local sustainable-planning guidance, including the council’s sustainability checklist approach.

    Back to the West Oxfordshire example ↑
  10. National Planning Policy Framework: introduction

    Explains the plan-led system and the roles of national policy, development plans and supporting guidance.

    Back to regional and council requirements ↑

This page concerns planning in England. Requirements depend on the applicable policies, proposal and submission date. Check local policy status, regulatory transitions and reporting tools again before submission. The carbon illustration uses hypothetical figures and is not a client case study. The agreed project scope determines the assessments and deliverables provided.