Health evidence for planning decisions
Health Impact Assessments for Planning
Plan your health impact assessment around the development.
A health impact assessment considers how a proposal could affect health, wellbeing and health inequalities. Therefore, its scope depends on the development, the people affected and the planning authority’s requirements.
ACP’s HIA consultants provide planning assessments, primarily rapid HIA. Where the project needs more depth, we can discuss a detailed assessment and the engagement it requires.
A clear starting point
Council requirements
Start with the policy, validation requirement or written request.
People and place
Understand the local health context and who may be affected.
Practical recommendations
Connect the evidence with design decisions and clear responsibilities.
When might a planning application need an HIA?
Start with the council’s current requirements. For example, an adopted policy may set a trigger. Alternatively, a project-specific request may identify health issues that need assessment.
However, there is no single development-size threshold to apply to every proposal in England. Therefore, check the local plan, validation list and any pre-application advice together.
England’s National Planning Policy Framework: promoting healthy communities sets the national policy context. Local requirements and the proposal’s likely effects guide the project-specific assessment.
- Identify the site and planning authority
Read the current adopted policy, validation list, requested toolkit and any written advice.
- Is an HIA requested or triggered?Yes
Clarify the method, assessment depth and submission requirements.
No clear requirementConsider potential health effects and seek project-specific advice. Record the reasoning.
- Is EIA also involved?
If so, coordinate with the EIA lead and confirm whether the authority also expects a standalone HIA.
- Agree the scope before assessment
Confirm the people affected, evidence, engagement, responsibilities, outputs and programme.
This pathway supports scoping. It does not determine application validity or grant planning permission.
Share the council’s wording alongside your plans. We can then agree the health impact assessment scope before setting the report programme.
A practical HIA scoping checklist
Use these questions to prepare a scope discussion. However, they do not give an automatic yes/no decision.
Where current local requirements have not been verified:
Local HIA requirements need confirmation. We have not verified current requirements for this authority. This does not mean an HIA is unnecessary. Please check the local planning authority's current guidance or contact ACP Consultants for project-specific advice.
Ask ACP to help scope your project. This checklist does not confirm planning validation, permission or compliance. Your ticks are not sent or saved.
Rapid HIA, with more detail where needed
ACP’s planning HIA work mainly involves rapid assessments. A rapid HIA focuses the work on the agreed issues. However, it still needs sound evidence.
Where the potential effects or council requirements justify it, we can discuss a more detailed HIA. In addition, external engagement and public consultation may form part of that scope.
| Approach | Evidence and engagement | Scope question |
|---|---|---|
| Desktop | Existing plans, local policy and readily available health evidence, with gaps identified. | Can existing information address the agreed health issues? |
| Rapid | A focused evidence review, with proportionate stakeholder input where the agreed method requires it. | Which effects and population groups need closer consideration? |
| Comprehensive / detailed | More extensive analysis and engagement. New evidence or public consultation may be needed. | What depth is justified by the potential effects and project complexity? |
These labels are not uniform national packages. Instead, local definitions and the agreed scope take precedence. This comparison does not set fees or turnaround times.
Before commissioning, agree the assessment depth, evidence, engagement and review requirements. For example, a desktop exercise will not suit a project that needs substantial additional evidence.
Which HIA method should you use?
Choose the framework and evidence around the council’s requirements and the proposal’s likely effects. However, the assessment label alone cannot determine the scope.
HUDU rapid HIA
The HUDU tool provides a structured review of health determinants relevant to planning. Then support each judgement with local evidence and practical actions.
Council tools and guidance
Some authorities publish their own template or process. Therefore, check the required method before committing to a generic report format.
Detailed assessment
Complex effects may need deeper analysis, specialist inputs and engagement. Therefore, agree the evidence and responsibilities around the project’s needs.
Methods may combine population data, research, health pathways and stakeholder insight. In addition, quantitative analysis can help where suitable evidence supports it.
Read HUDU’s explanation of its HIA tools.
How council requirements differ
- Bristol’s published template includes 100 or more homes, 10,000 m² of non-residential development and other significant health effects.
- Darlington’s policy summary specifies 150 or more homes and other non-residential major development. Its guidance expects a council-specific comprehensive assessment.
- East Sussex’s manual uses integrated screening and scoping instead of rapid, desktop or comprehensive labels. Check the relevant district’s policy triggers.
Examples checked 17 October 2026. Read the applicable policy, validation list, exceptions and current project advice together.
Does the planning route change the assessment?
Yes. A local planning application starts with local requirements. Where EIA applies, coordinate the health evidence with the Environmental Statement.
For nationally significant infrastructure, check the consenting regime, relevant National Policy Statement and EIA scope. However, local housing thresholds do not decide that assessment.
Planning Inspectorate advice allows health effects to be addressed across relevant chapters or in a dedicated human-health chapter. Also confirm whether the authority expects separate HIA material.
What does a health impact assessment assess?
The assessment considers the ways a proposal could change the conditions that influence people’s health. Together, these are often called health determinants.
Homes and everyday movement
Housing quality, accessibility, walking, wheeling, cycling and connections to daily needs.
Services and social connection
Access to healthcare, education, employment, community facilities, green space and opportunities to meet others.
Environmental conditions
Relevant exposures such as air pollution and noise, using appropriate specialist evidence.
People, inequalities and uncertainty
First, a population baseline describes the local context. Useful sources include the Joint Strategic Needs Assessment, population statistics, public-health profiles and local health strategies.
Then consider how effects may differ between groups. Existing residents, future occupants, workers and neighbouring communities may experience different benefits or burdens.
For example, age, disability, income and existing health conditions may affect exposure or access to benefits. Construction and operation can also create different effects.
The assessment should explain data dates, geographical fit and limitations. It should also consider cumulative effects where relevant, rather than imply certainty that the evidence cannot support.
How HIA fits with other evidence
Relevant evidence may include an air quality assessment and a noise assessment. These specialist studies inform the health assessment; HIA does not replace them.
Where environmental impact assessment applies, agree how the health evidence fits the wider assessment. A separate HIA may still be required by the authority.
Similarly, assessing access to healthcare differs from calculating healthcare infrastructure capacity or contributions. Agree any separate evidence with the relevant planning and health-service contacts.

Illustrative example
Follow a health pathway through the design
Imagine a residential proposal with a busy access road, nearby noise and new green space. A proportionate assessment traces each feature through exposure or access, affected groups, evidence and action.
| Feature and pathway | People to consider | Evidence needed | Possible design response | Responsibility and follow-up |
|---|---|---|---|---|
| Walking route crosses a busy access: potential barriers to safe, active travel | Children, older people and people with mobility impairments | Site layout, movement evidence, access audit and relevant engagement | Review crossing location, accessibility and connections to services | Design and highways teams: agree the response and check its delivery |
| New homes near a noise source: potential effects on rest and wellbeing | Future residents, including people with greater sensitivity | Acoustic findings and the layout, ventilation and overheating interfaces | Review layout and specialist mitigation; explain remaining uncertainty | Acoustic and design leads: record design actions and the verification route |
| Green space has limited accessible routes: unequal access to its potential benefits | Residents who face physical or other access barriers | Accessibility, quality, safety and local-needs evidence | Review inclusive routes, entrances and practical access | Landscape team and future manager: agree delivery and maintenance responsibilities |
These are hypothetical pathways, not findings for a real site. Therefore, an assessment must test them against project evidence.
From assessment findings to practical actions
The following hypothetical scenarios illustrate how recommendations can become an action plan. However, they are not ACP project examples or measured outcomes.
Making a community facility accessible
Imagine a proposed community room whose entrance is accessible, but whose opening hours and booking arrangements remain undecided. However, physical access alone would not establish who could benefit.
The assessment could explore affordability, timing and local needs with relevant groups. An action plan would then assign responsibility for inclusive access and explain how the team would review it.
Maintaining access during construction
Imagine building works beside a pedestrian route to a bus stop. A temporary diversion could create a longer journey, particularly for people who cannot walk far.
The project team could review accessible alternatives, clear signs and advance communication. It would then record the evidence, remaining uncertainty and responsibility for checking the route during construction.
Turning a possible issue into a clear action
| Possible issue | Action to investigate | Responsibility and follow-up |
|---|---|---|
| Booking costs could limit access to the community room. | Explore local needs and affordable access arrangements. | Facility operator: agree the approach and review access after opening. |
| Opening hours could exclude some potential users. | Discuss suitable times with relevant community groups. | Operator and engagement lead: record feedback and the agreed response. |
| A temporary diversion could make the bus stop harder to reach. | Check route length, accessibility and safe alternatives. | Construction and access leads: agree arrangements and inspect the route. |
These examples explain the approach only. However, actual findings, actions and monitoring depend on site evidence and the agreed commission.
Discuss the scope for your proposalHow we develop your health impact assessment
Agree the work before assessment begins. The process below shows the main stages, including a technical check before report issue.
1. Screen
Your input: site details, proposal and council request.
Output: a recorded basis for the required assessment, using any established policy trigger.
2. Scope
Your input: plans, available reports, programme and relevant contacts.
Output: agreed issues, groups, methods, engagement and exclusions.
3. Assess
Your input: design information, specialist evidence and agreed engagement findings.
Output: findings on likely benefits, adverse effects, inequalities and evidence gaps.
4. Report and recommend
Your input: responses to queries and proposed design actions.
Output: a report with findings, limitations, recommendations and responsibilities.
Check the method, evidence, conclusions and proposed actions before releasing the report.
5. Monitor and evaluate, as agreed
Your input: agreed delivery information and follow-up evidence.
Output: a record of implementation and evaluation against the agreed measures.
This is a proposed assessment workflow. The commission must identify who undertakes each stage; monitoring is not automatically an ACP service.
What your health impact assessment report covers
The agreed report should explain the proposal, policy context, population baseline and assessment method. It should also show how the evidence supports the findings.
Before appointment, confirm the report format, supporting schedules and agreed review stages. Therefore, the quotation should make clear what the commission includes.
- Potential health benefits and adverse effects, including differences between population groups.
- Evidence sources, assumptions, data gaps and assessment limitations.
- Recommendations that connect findings with design or management actions.
- Responsibilities for implementation and any agreed monitoring or evaluation.
- Relevant engagement findings and unresolved matters, where engagement forms part of the scope.
What to send before a quotation
Start with the information you have. For example, the council’s request and a clear proposal description help establish what evidence is needed.
- Site address and planning authority.
- Development description, scale and available plans.
- Council request, policy reference or requested toolkit.
- Planning stage and submission deadline.
- Existing specialist reports and known evidence gaps.
- Relevant engagement completed or requested.
Have a council request?
Include its exact wording, date and any referenced policy. Also explain whether the design or submission timetable may change.
Our guide explains the information needed for a health impact assessment.
Please do not send personal medical records or identifiable health information through the enquiry form.
Health impact assessment: programme, fees and scope
The assessment depth, proposal complexity and available evidence affect the programme and fee. Engagement, design changes and technical review can also affect the work required.
Therefore, share your deadline at the start. Report preparation and the council’s determination timetable are separate matters.
Ask whether the scope includes site visits, council liaison, external engagement, public consultation, additional specialist studies, revisions and monitoring. Also record any exclusions and the approach to changes.
A rapid HIA is not a fixed turnaround promise. Similarly, detailed HIA and consultation need a project-specific programme and agreed responsibilities.
Agree the assessment team and review responsibilities
Your agreed scope should identify responsibility for the HIA, specialist inputs, technical review and any external engagement. If detailed assessment or public consultation is needed, agree the delivery arrangements before that work starts.
Health impact assessment FAQs
Is an HIA required for every planning application?
No. Requirements depend on the relevant policy, development and likely effects. Check the council’s current requirements and any project-specific advice.
Is a rapid HIA the same as a desktop HIA?
Authorities may use the labels differently. Therefore, agree the evidence, engagement and outputs rather than relying on the name alone.
When might a detailed HIA or public consultation be needed?
The likely effects, evidence gaps and authority’s requirements guide the depth. If engagement or consultation is needed, agree its purpose, participants, method and responsibility within the scope.
Does HIA replace EIA or specialist air and noise assessments?
No. They answer different questions, although their evidence may overlap. Agree how the studies work together and what the authority expects.
How much does an HIA cost, and how long does it take?
The scope, available evidence, engagement and review needs affect both. Therefore, share your proposal and deadline so we can discuss the required work.
Can an HIA guarantee planning permission?
No. It provides evidence for the planning process. The relevant decision-maker determines the application.
Related planning evidence
Explore our planning and development services for related assessment routes.
Technical references
- National Planning Policy Framework — England
- Planning Practice Guidance: healthy and safe communities
- Public Health England: HIA in spatial planning
- Essex Design Guide: HIA process and method
This page discusses planning HIA in England. Confirm the relevant policy framework for projects in other UK nations.
Your project. A clear starting point.
Let’s scope your HIA
Tell us about your site, proposal and planning requirements.
Send the council’s request, planning stage and deadline. We can then discuss the evidence and assessment depth your project needs.
Start with what you have
- Site address and proposal
- Council wording or policy reference
- Planning stage and target date
Prefer to speak?0330 236 7329hello@acp-consultants.com
Please do not send personal medical records or identifiable health information. Read our privacy policy.