A health impact assessment for planning connects the proposal, the local population and the design decisions still open to change. Start with the applicable local policy and screening question. Then organise the evidence, uncertainties and responsibilities around the decisions the team needs to make.
The practical answer
Check whether the authority requires an HIA and agree its scope early. Provide the current layout, relevant population evidence and coordinated specialist studies. Building for a Healthy Life can inform design discussion, but its ratings do not replace an HIA or create a universal national requirement.
Establish the planning requirement and assessment question
First, record the applicable local policy or validation requirement and the screening decision. Identify who confirmed the scope and whether the authority has requested a particular method or level of assessment. This creates a clear starting point for a health impact assessment for planning.
Provide the development description, current layout and planning stage. Include the local authority’s requirements and any pre-application correspondence. Also explain which decisions remain open and when the team needs findings to inform them.
For example, the location of an access route may still be flexible, while the site boundary is fixed. Make that distinction clear. Otherwise, recommendations may arrive too late to influence the feature that matters.
Requirements vary by place and project. Therefore, ask the assessor to establish the scope using the local policy context and available evidence. Do not assume that every scheme needs the same type or depth of assessment.
Use Building for a Healthy Life alongside the HIA
Homes England published the 2026 Building for a Healthy Life (BHL) toolkit in May and updated it in August, including a correction to Consideration 7. Its 12 considerations sit under integrated neighbourhoods, distinctive places and streets for all. They encourage a discussion about how places work for people and nature.
BHL uses green, amber and red ratings to identify strengths and areas needing further work. However, those ratings do not replace a project-specific HIA or establish a new national HIA requirement. Keep the design review and health evidence connected, while recording their separate conclusions.
As a practical coordination exercise, use the toolkit to identify design questions. Then ask which evidence the HIA needs to assess their implications. Record the design response, responsible person and outstanding decision together.
Organise the population and environmental evidence
List available transport, noise, air quality, open-space, housing and other relevant studies. Record their dates, revisions and geographic scope. The assessor can then decide which sources support the assessment and where further work is proportionate.
Also identify the population groups that the evidence actually describes. An area-wide average may conceal differences between communities. Therefore, explain the limits of each dataset instead of treating every resident as having the same needs.
Keep personal or sensitive health information out of the routine public project bundle. Use suitable published or aggregated evidence and agree any additional information handling with the responsible parties. Where evidence is missing, record a gap rather than inventing a population characteristic.
Start with traceable evidence. Every important conclusion should have an identifiable source, a relevant date and a clear link to the proposal.
Where community engagement informs the findings, record who participated, when and how their views relate to the proposal. Also explain whose views may be missing. Keep consultation findings distinct from measured environmental evidence and from professional assumptions.
Bring design disciplines together

A coordinated review helps the team identify tensions between otherwise sensible recommendations. For example, a quieter route may be less direct, while a drainage feature may affect access. Consider those relationships before each specialist finalises a separate report.
| Design question | Evidence to coordinate | Response to record |
|---|---|---|
| Can people reach everyday destinations? | Routes, crossings, gradients and transport information | Access changes and unresolved barriers |
| Will outdoor spaces work in practice? | Landscape, drainage, shading and management proposals | Usability, maintenance and delivery responsibilities |
| Who may experience adverse effects? | Population context and environmental assessments | Avoidance, mitigation and remaining uncertainty |
| Will facilities remain useful? | Capacity, access and stewardship information | Delivery assumptions and long-term ownership |
This is a coordination framework, not a substitute assessment matrix. The assessor should choose the relevant topics and methods. In addition, the team should explain why any apparently relevant issue falls outside the agreed scope.
Make recommendations usable for the design team
A useful assessment supports design decisions rather than simply increasing the size of the evidence bundle. For each recommendation, identify the design owner, drawing reference and response date. Keep positive opportunities visible alongside concerns.
Then record whether the team accepts the recommendation, proposes an alternative or needs further evidence. Explain the reason for the response. A clear decision record is more useful than a statement that the team has merely considered health.
Also distinguish an aspiration from a secured measure. If a proposed benefit depends on future management or third-party delivery, state that dependency. The final assessment should reflect what the project can reasonably deliver.
Keep an evidence and revision register
Use a short register to keep the assessment aligned with the current proposal. Include these fields for each important input:
- Document title, author, date and revision.
- Site area or population covered.
- Decision or assessment topic supported.
- Known limitations and outstanding information.
- Responsible contact and next review date.
For example, suppose the transport study changes during assessment. The coordinator issues the new version and explains the change. The assessor can then check its implications for access rather than unknowingly relying on a superseded route plan.
Before the next issue, reconcile the register with the design package. This final coordination step helps the HIA describe the proposal that the planning authority will actually consider.
Turn findings into a decision record
As an illustrative example, consider a layout change that moves a walking route closer to a busy road. Shorter journeys may improve accessibility, while exposure, crossings and perceived safety need a separate review. Record the affected groups and the evidence behind each judgement.
- First, distinguish measured evidence, consultation findings and professional assumptions.
- Next, identify the design response, responsible discipline and drawing or management document that will secure it.
- Finally, explain remaining uncertainty and set a review point rather than presenting an untested benefit as an established outcome.
Use the health impact assessment scope to agree the level of work. Where exposure affects the recommendation, commission proportionate air quality evidence and share the same layout and population assumptions.
Common questions
What is a health impact assessment?
An HIA examines how a proposal may affect population health and how those effects may differ between groups. It supports recommendations for decision-makers. It is not a medical assessment of an individual.
Does every planning application need an HIA?
No single rule applies to every application in England. Check the relevant local policy, validation requirements and project circumstances. Then agree the appropriate scope with the assessor and, where needed, the authority.
Does a green BHL rating replace an HIA?
No. BHL supports design review, while an HIA examines health effects using an agreed scope and evidence. Use their findings together, but do not treat a design rating as proof that all health effects have been assessed.
What information should we provide first?
Start with the current layout, development description, planning stage and authority correspondence. Then provide an indexed list of relevant studies and population evidence. Explain missing information and the decisions that remain open.
When should the assessment influence design?
Early enough to change the proposal where needed. Therefore, align the assessment programme with layout reviews and submission dates. If the design changes later, ask the assessor whether the evidence or conclusions need updating.
References and scope
Apply the relevant jurisdiction, local requirements and project-specific professional advice. These references support the scope described above.
- Homes England. Building for a Healthy Life — publication record.Provides the current toolkit and update history, including the correction to consideration 7.
- Homes England. Building for a Healthy Life: 2026 edition.Design toolkit, published May 2026 with an August correction. Its considerations inform design discussion; they do not replace a project HIA.
- Public Health England (2020). Health Impact Assessment in spatial planning: a guide for local authority public health and planning teams.Practice resource for assessing health implications in the planning process.
- GOV.UK. Planning practice guidance: Healthy and safe communities.England planning context. Local policy and validation requirements still need project-specific checks.