Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

ACP Insights & Guidance

Clearer thinking.
Better environmental decisions.

Environmental planning guidance for the decisions behind your project. Explore ACP’s practical checklists, policy updates and questions to ask before commissioning an assessment.

For developers, designers & landownersEvidence-led guidanceAcross environmental disciplines

Featured insight · Biodiversity

When the habitat plan and metric disagree

A practical checklist for tracing discrepancies, coordinating the right document versions and agreeing the next step with your project team.

Read the reconciliation checklist →
Illustration of an ecologist reviewing habitat plans for a proposed development
Illustration: connecting habitat surveys, development design and biodiversity calculations. This is not an ACP project photograph.

Explore the knowledge library

Explore environmental planning guidance on biodiversity, ecology, air quality, noise, land and development. Each article helps you identify useful questions and the next step for your site.

Browse the published guidance below.

Habitat commitments and the landscape maintenance tender

A landscape maintenance tender needs to show where ordinary amenity work meets agreed habitat commitments. Give bidders enough information to understand the scope, reporting arrangements and specialist interfaces. Keep the authoritative habitat requirements intact: procurement is the opportunity to clarify delivery responsibilities, not to rewrite ecological objectives for a convenient maintenance schedule.

Read article

Trees and bats: the arborist–ecologist handover before works

Tree information and bat advice need to refer to the same features and proposed works. Before instructions are issued, connect the arborist’s tree schedule with the ecological evidence and current layout. A clear handover helps the specialists review the actual proposal while keeping tree assessment, bat assessment and work authorisation within their respective scopes.

Read article

Reptile survey access: a coordination note for the site team

Good access coordination helps an appointed ecologist deliver the agreed reptile survey scope. Provide current plans, relevant site activity and practical contacts before the visit. Preparation should make the information clearer; it should not involve altering habitat or moving potential refuges to make the site appear easier to survey.

Read article

Retained habitat on a construction site: the design-to-contractor handover

Retained habitat needs to stay visible when design information becomes a contractor’s working pack. A pre-start handover should connect the ecological constraints with the current layout, access arrangements and instruction process. It should help the site team recognise questions that require specialist review, rather than supply a generic clearance method.

Read article

New plant and equipment: information to give your acoustic consultant

Before an acoustic consultant reviews new plant or equipment, give them a coordinated description of what will be installed and how it will operate. A useful brief connects the manufacturer’s information with the actual layout and nearby uses. It helps the assessor identify missing inputs before advice is relied on in a design or planning decision.

Read article

Comparing bat survey quotations: questions about scope and assumptions

Bat survey quotations are easier to compare when they answer the same project brief. Look beyond the headline price to the site, proposed works, evidence stage and deliverables each offer covers. A clear clarification table helps identify differences without assuming that the cheapest quote or the greatest number of visits is automatically the most appropriate scope.

Read article

Bats and lighting: a coordination checklist for the design team

Lighting decisions should be coordinated with the project’s bat evidence before the specification is settled. Bring the ecologist and lighting designer together around the same layout, operating assumptions and constraints. The useful output is a reviewed design response with clear responsibilities, rather than a generic claim that one lamp type or colour makes every scheme suitable.

Read article

Coordinating habitat and drainage drawings before design sign-off

Habitat and drainage drawings often describe the same land for different purposes. A coordinated review helps the ecologist, drainage engineer and landscape designer identify conflicting assumptions before design sign-off. It should connect features, levels, access and maintenance responsibilities without treating a drainage function as proof of a particular habitat outcome.

Read article

Buying a development site: questions to ask about inherited BNG records

When a development site changes hands, its BNG records may arrive as a mixture of reports, drawings, spreadsheets and correspondence. A structured request helps the buyer’s advisers understand what exists, what the documents relate to and which questions still need an answer. It is a records exercise, not a substitute for legal or ecological due diligence.

Read article

Changed layout, changed BNG evidence: keeping a revision trail

A design change can leave several versions of the BNG evidence in circulation. Keep a short revision trail that connects the changed layout with the habitat drawing, metric workbook and supporting report. The aim is to make the change visible to the people responsible for reviewing it before the next issue.

Read article

New development near an odour source: framing the site questions

A development near a potential odour source needs a brief that explains both the proposed use and the surrounding activity. Bring the available information together without assuming that a source is harmless, unacceptable or responsible for every reported smell. A factual starting point helps the appointed assessor frame the site-specific questions.

Read article

Traffic and air quality: coordinate the information before assessment

Traffic information can pass through several revisions before an air quality assessment is prepared. Keep the transport inputs, development description and assessment scenarios connected. A coordinated information register helps the transport specialist and air quality consultant identify which figures belong together and where an assumption still needs confirmation.

Read article