BNG changes in August 2026: recheck your exemption before submitting

BNG changes in August 2026: three exemption checks

BNG changes in August 2026 introduced two exemptions in England and removed the separate self-build and custom-build exemption for new applications. The application date, site area and habitat impacts determine which rules need checking.

A previous exemption note may therefore need revisiting. Use the actual proposal and permission history, rather than a description such as “small site” or “temporary works”. The following table summarises the changes; it does not determine whether a particular development qualifies.

August 2026 changes: the three checks to make
ChangeConditions and evidence
Site area of 0.2 hectares or lessThe application must be made on or after 6 August 2026. The whole red-line site area must be no larger than 0.2 hectares, and the development must not impact on-site priority habitat. Measure the application site, not just the building footprint.
Wholly temporary developmentThe application must be made on or after 6 August 2026. All development must be temporary, with no impact on on-site priority habitat. The permission’s specified period must not exceed five years, including removal, discontinuance of use and reinstatement.
Self-build and custom-buildThe separate exemption ended for applications made on or after 6 August 2026. Earlier qualifying applications retain the saved exemption. A new self-build proposal may still qualify under another exemption, but that requires its own evidence.

For these rules, habitat impact includes loss or degradation that reduces biodiversity value. Priority habitat is a defined category, not simply any vegetation. Use suitable ecological evidence to establish what is present and what the proposal affects.

The official BNG exemptions guidance covers the wider exemption categories. This article focuses on the August changes and their practical checks.

Check variations and successive temporary permissions

A new submission date does not automatically bring an older permission within the new exemptions. For section 73 variations, trace the original permission and its application date.

The new area-based and temporary exemptions do not apply to a section 73 permission if either of these applies:

  • The application for the original permission was made before 6 August 2026.
  • The original permission was granted before 6 August 2026.

There is a different saving for self-build and custom-build. A section 73 application made on or after 6 August can retain that exemption where the original permission qualified under it.

Also check the full temporary permission history. The temporary exemption does not apply where the specified periods for the same temporary development total more than five years. A further permission cannot simply restart the clock.

These details come from regulations 3 and 4 of the 2026 amendment and transitional regulations. Keep the original permission, conditions and later variations together when assessing the route.

BNG changes in August 2026: keep an evidence register

Connect each exemption claim to a document before submission. The register should show what the team has checked and what still needs resolution.

  • Route and dates: retain the application record, original permission and any variations.
  • Area: use a measured, dated red-line plan matching the submitted application.
  • Habitats and impacts: record the evidence for habitat type, priority status and expected loss or degradation.
  • Temporary development: retain all relevant permissions, their conditions and the cumulative specified period.
  • Conclusion: identify the exemption relied on, its supporting documents and who will resolve remaining uncertainty.

The de minimis exemption remains a separate test. It concerns impacts below 25 square metres of on-site habitat with biodiversity value greater than zero and below five metres of linear habitat. It also excludes impacts on on-site priority habitat. Do not confuse these impact thresholds with the new whole-site area threshold.

If ecological evidence is missing, discuss the appropriate BNG assessment and habitat baseline scope before commissioning a full package.

Recheck the conclusion when the plan changes

Imagine a proposal gains an access strip shortly before submission. The building footprint stays the same, but the application boundary becomes larger. This is an illustrative situation, not an ACP case study.

First, remeasure the submitted red-line area. Then check whether the access works change the habitat impacts. Finally, update the exemption note and drawing references together. An earlier email saying “small site” is not a lasting justification.

A BNG exemption does not remove other ecological obligations. Protected species, designated sites, trees and planning policies may still affect the proposal. Keep those requirements separate in the project brief.

The BNG changes in August 2026 also revised the biodiversity gain hierarchy for non-exempt minor development. Where the new arrangements apply, on-site enhancement, on-site creation and registered off-site gains sit at the same preference level. Statutory biodiversity credits remain a last resort. Earlier applications and certain variations retain the previous hierarchy.

Our BNG service guide explains the wider process. For a site-specific discussion, send ACP the location, application stage and current plan.

Sources and scope

England; sources checked 28 October 2026. The amendments took effect on 6 August 2026. This article is a practical coordination checklist, not a determination that a development is exempt.