A phased redevelopment can involve different buildings, contractors and design issues over time. Keep the bat evidence linked to the specific works it supports. A phase register should help the project team identify dependencies and refer changes for review before a later work package is treated as covered by an earlier report.
Map the works into identifiable phases
Describe each phase on a current plan and explain the proposed activities. Include relevant demolition, refurbishment, external works and lighting interfaces. State whether sequencing is agreed or still an option, and name the person responsible for programme changes.
Connect each report to the proposal it reviewed. The presence of one ecology report in the project folder does not show that it covers every subsequent phase or a changed work method.
Record advice and dependencies
Ask the ecologist to identify how the existing evidence relates to the phase proposals and what questions remain. Keep recommendations, further evidence and design actions traceable to their source. Use the specialist’s advice rather than inserting a generic seasonal timetable into the contractor programme.
Planning and licensing questions should be referred to the appointed advisers within their scope. This coordination register is not a licence interpretation, work authorisation or determination that evidence remains sufficient after a delay.
Review the programme when the proposal changes
Record revised drawings, methods, lighting or sequencing with the phase affected. Send the change to the responsible ecologist and other relevant advisers. Their response should identify the next action and any consequences for the evidence or programme. Use the bat report validity guide when a delay or design change raises questions about existing evidence.
Before issuing a work package, check that the contractor has the current advice and knows the contact for queries. Retain earlier versions as part of the project record. A clear programme interface is more useful than a broad note saying ‘ecology addressed’. Where follow-up is required, include post-development monitoring and its responsibilities in the programme.
Information register
| Phase record | Information to capture |
|---|---|
| Works | Location, scope and current drawing revision |
| Evidence | Report and proposal it relates to |
| Dependency | Outstanding advice or action with an owner |
| Change | Revised information and review response |
A practical example
Illustrative example: A refurbishment phase is brought forward while the associated design remains under review. The coordinator identifies the affected work package and asks the ecologist to review the revised proposal and sequencing. The response becomes part of the programme decision record.
Before the next issue
- Phases are identifiable on the plan.
- Reports are linked to the proposals reviewed.
- Dependencies have owners.
- Programme changes have been referred.
- Contractors receive the current agreed advice.
For the relevant specialist scope, see bat planning evidence, bat mitigation licence.
Professional context: Natural England bat advice, Bat protection and licensing guidance.