Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Bat surveys · Mitigation and licensing · England

Bat mitigation licence support

A bat mitigation licence may be needed when proposed works would otherwise breach the protection given to bats or their roosts. ACP helps you understand the survey evidence, assess the effects of your proposal and prepare an appropriate mitigation and licensing strategy.

Send your bat reports, current drawings and planning position. We will review what is already known, identify the decisions still needed and explain a scoped route through application preparation, site work and follow-up.

Discuss your bat mitigation project Understand the licence routes

Request a scoped quote

Tell us about your project

Share the location, survey findings and proposed works.

Get Your Free Quote Today
Great! What’s the property address for your quote?

When might a bat mitigation licence be needed?

The question is whether the proposed activity could result in a protected-species offence. A bat seen flying through a garden does not, by itself, establish that a building project needs a mitigation licence. Equally, an empty roof on the day of a visit does not establish that a known roost has lost its protection.

Assessment connects three things: the bats and roosts present, the work you propose, and the effects that work could cause. Relevant effects can include loss of a roost, blocked access or disturbance. They may arise during construction or through the completed development. Bats and their breeding sites or resting places are protected, including roosts when bats are temporarily absent. [1]

First, consider whether a change to the design or working method can avoid the relevant impact. Where that is not possible, a suitably experienced ecologist should assess the licensing requirement. A licence permits specified activities under conditions; it is not a general clearance for the whole site.

Projects where early mitigation advice helps

Licensing advice is most useful while the design can still respond to the ecology. Different projects create different conflicts. We therefore review the affected structures and proposed activities, rather than treating every building with bats in the same way.

Roof alterations and home improvements

Re-roofing, loft conversion, insulation or fascia replacement can affect concealed roosts and their access. The useful brief includes the actual roof build-up, affected elevations and intended sequence. A generic floor plan may not show the features that matter.

Barn conversions and redevelopment

A conversion may change roof space, temperature, lighting and access at the same time. Consider roost requirements alongside the architect’s accommodation plan. For demolition, establish the ecological implications before assuming replacement features can resolve every effect.

Trees and wider development sites

Tree works, access routes, new lighting and changes to surrounding habitat may need coordinated ecological input. Building emergence evidence alone does not answer every tree or habitat question. We identify where a different survey or specialist contribution is needed.

Planning permission and a wildlife licence are separate

Planning permission does not authorise an offence against protected bats or their roosts. Conversely, a wildlife licence does not replace planning permission, listed-building consent or another required approval. Each decision addresses a different part of the project.

For planning, the authority needs sufficient ecological information to assess the proposal. Natural England’s standing advice also explains how planning conditions and licensing requirements should work together. A planning condition should not contradict the measures needed under the wildlife licence. [2]

We can help the project team organise the ecological evidence and keep the report, drawings and mitigation proposals consistent. However, the planning authority determines planning matters, and Natural England determines the relevant licensing application. An ecological report cannot guarantee either decision.

A13, CL21 and Bat Earned Recognition: choosing a route

The route depends on the species, roost, proposed impacts and the ecologist’s relevant authorisation. A survey licence and a mitigation authorisation serve different purposes. Similarly, survey-licence levels are not the same as Bat Earned Recognition accreditation levels.

At quotation stage, we explain the proposed route, responsible ecologist and any specialist involvement. This includes confirming the authorisation relevant to the regulated work. Eligibility for a class-licence route must be established for the project and the practitioner undertaking it.

Individual application

A13 mitigation licence

An individual application addresses the specified project and proposed activities. Natural England's current A13 guidance explains the evidence, documents, application process and subsequent changes. This route remains relevant where a class-licence route is unsuitable. [3]

Transition in progress

CL21 low-impact route

Natural England is phasing out CL21. It is not accepting new registered-consultant applications. Existing registered consultants cannot register new sites after 14 December 2026. Check the current arrangements for an existing registration with the responsible consultant. [4]

Accredited consultant

CL47 Bat Earned Recognition

Bat Earned Recognition enables appropriately accredited ecologists to register eligible sites. Accreditation level and annexes determine the work covered. A consultant must hold the relevant accreditation; an ordinary bat survey licence does not confer it. [5]

What must the licensing case demonstrate?

Licensing involves legal tests as well as an ecological method. The applicable purpose and evidence need to be considered for the actual activity. The following is a practical outline of the three tests, rather than a prediction of Natural England’s decision. [6]

A permitted purpose

The proposed activity must fall within a relevant licensing purpose. The applicant and advisers need to explain that purpose clearly and support it with the appropriate project evidence.

No satisfactory alternative

The assessment needs to address realistic alternatives. These may include retaining a feature, changing a design or adjusting how work proceeds. Record why an alternative does or does not meet the project's requirements.

Conservation status

The authorised action must not harm the maintenance of the species' population at favourable conservation status in its natural range. The survey evidence, impact assessment and mitigation strategy support this ecological test.

Survey evidence should answer the licensing question

Before preparing an application, we review what the existing reports actually establish. Useful evidence identifies the affected roosts, species, use, survey coverage and material limitations. The information should relate to the structures and drawing revision now proposed for work.

A preliminary roost assessment identifies evidence, features and the need for further investigation. Where required, bat emergence surveys add observations about building use. Other survey approaches may be needed for trees, winter use or the wider site. Existing reports help scope that work; they do not automatically settle every later licensing question.

For example, a report prepared for an extension may not cover a later proposal to strip the entire roof. Similarly, a conclusion about one building cannot simply be transferred to another. We explain the gap and its practical consequence before recommending additional work.

How ACP can support the project

Agree the required stages at the outset. This makes the quotation easier to understand and gives the architect, applicant and contractor a clearer allocation of responsibilities.

1. Review the information

We review the proposal, available survey reports, planning position and intended programme. Then we identify the decisions, evidence gaps and access information needed to scope the next stage.

2. Assess impacts and alternatives

We relate the works to the ecological findings and discuss feasible avoidance options with the project team. Where impacts remain, the strategy needs to explain the proposed mitigation and compensation.

3. Prepare the agreed application input

Within the commissioned scope, we prepare the ecological documents and coordinate the information needed from the applicant and designers. The application must use consistent plans, dates, responsibilities and methods.

4. Respond to the licensing process

Natural England may seek clarification or further information. We explain the ecological response and identify any effect on the programme. Application preparation and regulator determination are separate stages.

5. Brief and support the works

Where commissioned, we help translate the authorised requirements into a site briefing, agreed supervision and practical records. The responsible team should understand the hold points before work reaches an affected feature.

6. Complete the agreed follow-up

We can support compliance evidence, ecological monitoring and the required reporting within the agreed scope. Clarify who retains access and responsibility for mitigation features after the construction team leaves.

Mitigation design starts with avoiding the impact

Begin with what the bats use and what the proposal would change. Retaining a roost may involve more than keeping a box or a small piece of roof. Access, internal space, conditions and surrounding connections can all matter.

Where avoidance is achievable, record it on the drawings and in the work instructions. This helps prevent the agreed solution being lost through a later specification change. Where impacts cannot be avoided, the response should distinguish measures that reduce harm from measures that compensate for a loss.

The illustration shows a conceptual retained loft, separate from occupied space, with an access opening and nearby habitat. It explains questions to discuss with the ecologist and designer. It does not specify a suitable roost for every species, prove that a licence is unnecessary or provide construction instructions.

Give the design team a usable brief

A useful ecological brief identifies the features to retain or provide, the reason for each measure and the decisions requiring coordination. It should also explain what needs checking before substitutions are accepted.

Therefore, send revised drawings back for ecological review when a roof layout, material, access feature or lighting proposal changes. A small architectural alteration can have a different ecological consequence from the one assessed originally.

Conceptual cutaway illustration of a barn with a separate bat loft, a high gable access opening and adjoining trees and hedge.
Conceptual roost-retention illustration, not a construction detail or an actual ACP project. © ACP Consultants.

What should the application and method statement cover?

The documents should explain the proposed work clearly enough for the regulator to assess it and for the responsible team to implement it. A long report with inconsistent drawings is less useful than a coherent set of evidence and instructions.

The precise requirements depend on the route and the application’s circumstances. For A13, check the current guidance and forms when preparing the submission. Include the required applicant and ecologist information, declarations, supporting plans and any applicable reasoned statement. [3]

Our bat survey methods and evidence limitations guide explains what the different evidence types can establish.

  • The existing position: survey findings, roost use, relevant features and limitations.
  • The proposed work: affected structures, activities and current drawing revisions.
  • The impact assessment: how construction and the completed scheme could affect bats.
  • The agreed measures: avoidance, mitigation, compensation and their intended functions.
  • The delivery arrangements: sequence, timing, responsibilities, supervision and contingencies.
  • The follow-up: compliance evidence, monitoring, maintenance and required reporting.

Keep instructions practical

The contractor needs to know which activities require an ecological check, who authorises the next step and what happens if unexpected evidence appears. Put those decisions in the agreed work documents, not only in a report appendix that nobody on site sees.

Keep the evidence traceable

Retain the drawing revisions, relevant correspondence and records needed to demonstrate what was agreed and delivered. This supports later reporting and makes a change easier to assess.

Worked example: coordinating a barn conversion

Illustrative scenario, not an ACP case study. A proposed barn conversion includes new accommodation in a roof space. Survey evidence identifies a roost associated with that part of the building. The team should first test whether the layout can retain the relevant function and access.

The architect, ecologist and client consider the accommodation plan together. They compare the effects of alternative layouts, identify what further information is needed and record the agreed ecological requirements on revised drawings.

If an impact remains, the licensing strategy considers the relevant route and supporting measures. The contractor then needs a clear sequence and defined points for ecological involvement. Finally, the handover should explain who will retain access for any required monitoring.

The useful outcome at this stage is an agreed brief and a documented decision trail. It is not a promise that a particular layout, bat box or application will be accepted.

Timing: surveys, determination and works are different stages

The overall programme includes evidence gathering, design coordination, application preparation, determination and the authorised work period. A target date for one stage is not a delivery promise for the whole project.

Natural England currently aims to decide an A13 application within 30 working days. That is its stated aim, not a guaranteed construction start date. Allow for an incomplete application, requests for information, changes and any relevant seasonal restrictions. [3]

There is no universal “safe winter window” for works affecting bats. CIEEM’s 2025 mitigation guidance clarifies assessment of winter use, including less obvious features in buildings. The evidence, species, works and risk should inform the method and timing. [7]

We can help identify the dependencies that affect your programme. For survey-stage planning, use our bat survey season guide and survey season planner alongside project-specific advice.

Roof materials, lighting and access need coordination

Bat-related requirements should be included in the specification before products are ordered. A product name or a supplier’s broad assurance is not a substitute for checking its suitability within the proposed scheme.

Roofing membranes

Natural England’s A13 guidance requires a snagging-test certificate where a non-bitumen coated roofing membrane is proposed. Check the exact product and supporting evidence. A certificate alone does not establish that the whole design is suitable for the roost or guarantees licence acceptance. [3] [7]

Lighting and retained access

Consider light reaching roost access and relevant habitat connections, including temporary construction lighting. A retained entrance can lose value if a later fitting illuminates it or another trade blocks it. Coordinate the ecological requirements with the lighting designer and site team.

BCT and the Institution of Lighting Professionals provide joint guidance on bats and artificial lighting. Use it to inform the project-specific assessment rather than treating one lamp type or colour as a universal solution. [8]

During works: brief the team and keep the conditions usable

Once the relevant permission or registration is in place, the responsible team must follow its scope and conditions. Ecological involvement should match the authorised method and agreed commission. Attendance by an ecologist does not itself authorise an otherwise prohibited activity.

Before work reaches affected features, confirm the current documents, the site contact and any required supervision. Explain the activities that must pause for an ecological check. Keep the relevant conditions accessible to the people carrying out the work.

If bats or unexpected evidence are found, stop the affected work and obtain advice from the responsible ecologist. Do not handle bats, block an entrance or improvise a new method. The finding may change the assessment, the authorised approach or the immediate site arrangements.

Monitoring, maintenance and licence changes

Completion of building work is not necessarily the end of the ecological commission. A licence or planning condition may require records, monitoring or continuing management. Establish those obligations and their costs before the construction team leaves.

Compliance checking asks whether the specified measures were delivered. Monitoring can ask whether bats use the provision and whether it remains functional. These are related questions, but they are not interchangeable. Natural England advises that monitoring should be proportionate and may extend over several years. [2]

Where commissioned, ACP can help define the ecological follow-up, record findings and explain recommendations. Confirm the required access, responsible owner, reporting dates and any review triggers in the scope.

If the project changes after a licence is issued, ask whether a modification is required before proceeding. Natural England’s A13 guidance sets out how to request changes and which updated documents and signatures are needed. A contractor’s agreement does not amend the licence. [3]

Bat mitigation licence costs and quotation scope

The cost depends on the evidence already available, the proposal, the licensing route and the required delivery support. Application preparation is one part of the potential commission. Surveys, design revisions, supervision and monitoring may involve separate work.

Ask for the quotation to distinguish consultancy fees, any regulator charges and physical construction measures. Natural England charges and exemptions depend on the route and circumstances. Check the current guidance rather than assuming every domestic project is charged in the same way. [3] [4] [5]

Also agree how additional information requests, material redesign or changes to the programme will be handled. This makes comparisons more useful than comparing a single headline fee. Our bat survey cost guide covers the earlier survey stages. For the application budget, see our A13 application and cost checks.

Bat mitigation licence questions

Does finding bats mean I automatically need a licence?

No. The assessment must relate the bats or roost to the proposed activity and its likely effects. Avoidance may remove the need for a particular licensable activity. Obtain project-specific advice before changing or disturbing an affected feature.

Does planning permission allow the work to start?

Planning permission does not replace a required wildlife licence. Check the planning conditions, relevant licensing requirements and other consents before starting the affected work.

What is the difference between a survey licence and a mitigation licence?

A survey licence authorises specified survey activities. Mitigation authorisation concerns specified effects of works on bats or their roosts. Holding a survey licence does not automatically authorise development impacts or confer Bat Earned Recognition accreditation.

Can a new site still use CL21?

Natural England is phasing out CL21. Existing registered consultants cannot register new sites after 14 December 2026. Ask the responsible ecologist to confirm the route and current eligibility for your project.

How long does a bat mitigation licence take?

Natural England currently aims to decide A13 applications within 30 working days. Your overall programme also includes evidence gathering, design and application preparation, and may be affected by further information or seasonal constraints. A decision date or start date cannot be guaranteed.

Will installing bat boxes make the project acceptable?

Bat boxes are not a universal replacement for every roost or impact. The measures need to address the ecological function and the effects of the proposal. Installing a box does not authorise disturbance or roost loss.

Is a reasoned statement always required?

No. Current A13 guidance sets out circumstances where submitting a reasoned statement is required and where an exemption applies. The underlying licensing tests still matter. Check the correct category for the proposed activity.

Can ACP review reports prepared by another ecologist?

Send the reports and current drawings so we can assess their relevance to the proposed commission. We will explain any limitations, information gaps and arrangements needed with the responsible applicant or ecologist. A review does not automatically transfer an existing licence or responsibility.

Current guidance behind this page

Checked 13 November 2026. This page explains mitigation licence support in England. Other UK nations have different licensing authorities and procedures. The sources below support the technical distinctions; the appropriate approach depends on the actual project.

  1. Natural England: bats, protection and licences

    Protection of bats and roosts, avoidance and licensing context.

  2. Natural England: bats and planning decisions

    Planning evidence, conditions, mitigation and proportionate monitoring.

  3. Natural England: A13 application and modification guidance

    Current documents, reasoned-statement exemptions, roofing membranes and the stated determination aim.

  4. Natural England: CL21 guidance and phase-out

    The 14 December 2026 cutoff for new site registrations by existing registered consultants.

  5. Natural England: Bat Earned Recognition

    Accreditation, annexes, site registration and the current application position.

  6. Conservation of Habitats and Species Regulations 2017, regulation 55

    Licensing purposes and the statutory tests. Read with the current Natural England application guidance.

  7. CIEEM: UK Bat Mitigation Guidelines 2025

    Reason and Wray, version 1.2. The 2025 amendments include winter-working assessment and additional case evidence.

  8. BCT and ILP: bats and artificial lighting

    Joint guidance on assessing and managing lighting effects on bats.

Discuss your bat mitigation project

Share the reports, current proposal and the decision you need to make. We will review the available information and explain the next ecological input to scope.