Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Greenwich / Planning & development

Air quality assessment in Greenwich

Connect local monitoring, planning requirements and building design for your Greenwich development. ACP provides air quality assessment, monitoring and mitigation advice for sites from the Peninsula and Charlton to Woolwich, Plumstead and Eltham.

Build a clear evidence brief before layouts, plant and ventilation decisions become difficult to change.

Discuss your project
01

Current local guidance

Policy E(c), the replacement Climate Resilience SPD and local validation.

02

Monitoring in context

Roadside trends, particles, diffusion tubes and site representativeness.

03

Your project checklist

Coordinate traffic, neighbouring uses, construction and building design.

01 / The local setting

A borough of corridors, riverside sites and neighbourhoods

Peninsula and Charlton Riverside

Study traffic and tunnel approaches, wharf or industrial activities, servicing and changing development layouts. Source relevance depends on the site, operating conditions and receptor location.

Woolwich and Plumstead

Busy roadside settings need a clear distinction between kerbside measurements, occupied façades and background. Consider loading, junction queues and pedestrian routes alongside the proposed use.

Eltham, Blackheath and the A2/A20 corridors

A borough-wide average can conceal differences between a major road and a quieter street. Check the road network, setback, building height, gardens and nearby sensitive uses.

A whole-borough AQMA, with local differences

Defra’s Greenwich record lists a whole-borough AQMA declared on 1 July 2001 for NO₂ and PM₁₀. The designation remains listed without a revocation date. The declared pollutants, current measured concentrations and a new development’s effects are separate evidence questions.

For wider assessment methods and London requirements, use our London air quality guide.

02 / Monitoring evidence

Read the trend and the measurement setting

The council’s 2025 Annual Status Report, published in June 2026, provides the results below. Seven of nine automatic stations recorded a small NO₂ rise from 2024, while Woolwich Flyover and Hoskins Street fell. Read the long-term reduction alongside this mixed recent picture.

Annual mean NO₂ / µg/m³

Two roadside histories

Selected 2019–2025 council results. These measured roadside series describe their monitoring locations.

Woolwich Flyover

GR8 / Roadside

27.7 µg/m³ in 2025

Woolwich Flyover: annual mean NO2 2019 to 2025: 52, 43, 40, 40, 33.1, 33.9, 27.7 micrograms per cubic metre.Annual objective: 40 µg/m³2019202020212022202320242025

Hoskins Street

GN5 / Roadside

26.7 µg/m³ in 2025

Hoskins Street: annual mean NO2 2019 to 2025: 41, 34, 33, 32, 30.9, 28.5, 26.7 micrograms per cubic metre.Annual objective: 40 µg/m³2019202020212022202320242025
Read the annual values
Annual mean NO₂, µg/m³
YearGR8GN5
20195241
20204334
20214033
20224032
202333.130.9
202433.928.5
202527.726.7

Source: Greenwich 2025 ASR, Table D. Calendar-year NO₂ capture: GR8 93.0%; GN5 91.4%. The chart does not attribute the changes to a single policy or intervention.

03 / A wider monitoring picture

Particles, diffusion tubes and the assessment baseline

The 2025 ASR lists nine automatic monitoring sites. Table C contains 42 diffusion-tube locations, including seven triplicate groups: 56 physical tubes. Triplicate tubes share a location for quality assurance. Confirm the method, data capture and exposure setting before choosing a project baseline.

2025 annual means, µg/m³ / council ASR Tables D, G and I
Monitoring siteNO₂PM₁₀PM₂.₅
Hoskins Street GN526.716.87.5
Falconwood GB619.618.69.3
John Harrison Way GN620.017.49.3*
Blackheath GR726.617.0—
Woolwich Flyover GR827.721.712.6
Westhorne Avenue GR919.217.79.0
Burrage Grove GN022.017.112.3
Plumstead High Street GN322.113.910.6
Fiveways Sidcup GN421.417.4—

Source: 2025 ASR. *GN6 PM₂.₅ was annualised from 43.7% calendar-year capture. A dash means no value in the reported table. GR8 PM₁₀/PM₂.₅ capture was 83.2%/79.7%; GR9 PM₂.₅ was 82.7%. All values refer to the monitor location.

Plumstead Road: monitor and receptor differ

The ASR reports 42.1 µg/m³ at tube BVTGNW101, then 39.7 µg/m³ at the relevant receptor after distance adjustment. Keep these figures distinct. Both the local hotspot and the adjustment assumptions matter when selecting a baseline.

Particles and ozone remain relevant

PM₁₀ annual means rose at all nine automatic sites from 2024 to 2025; PM₂.₅ rose at all seven reporting sites. The ASR also reports ozone monitoring at four sites. Assess particle exposure alongside the longer-term NO₂ trend.

Use national and London data appropriately

Defra’s local-authority dashboard adds wider modelled and national-network context. Compare year, metric and spatial scale with council and LAQN evidence; use provisional live readings with their quality flags.

04 / Planning evidence

Use the current Greenwich planning framework

Adopted Core Strategy: E(c)

Policy E(c) addresses air pollution from development, transport-emissions reduction and residential exposure. Read it with E(a)/E(b) pollution considerations and the current London framework. An older threshold or guidance reference should not be treated as the entire assessment test.

Climate Resilience SPD: replacement adopted

The 18 March 2026 Cabinet decision adopted the Climate Resilience SPD and revoked the Greener Greenwich SPD. Coordinate green infrastructure and climate resilience with ventilation and exposure; planting needs a site-specific design rationale.

Local validation and the document schedule

The council’s 2025 local validation list distinguishes air-quality evidence, including Air Quality Assessment and Air Quality Positive submissions. Match the application type, project scale and policy triggers to an agreed document schedule.

London Plan SI1: distinct questions

Assess exposure and local effects alongside applicable Air Quality Neutral, Air Quality Positive and construction requirements. Our London Air Quality Neutral guide explains the benchmark workstream.

05 / A coordinated assessment

Make the report useful to the design

Start with sources and receptors

Locate roads, occupied rooms, outdoor amenity, plant, extract, nearby activities and construction boundaries. Establish which emissions and exposure pathways need assessment.

Resolve the building strategy

Align ventilation intakes, window use, overheating, acoustics and energy assumptions. A mitigation measure needs a feasible design and a clear maintenance responsibility in the project brief.

Build proportionate evidence

Use a documented screening decision, dispersion modelling or monitoring where justified. Keep construction dust controls, operational emissions and any ecology pathway explicit in the scope.

For connected design questions, explore our noise assessment advice and odour assessment service.

Greenwich / Public planning examples

How air quality has shaped Greenwich planning proposals

Public planning records show how Greenwich’s roads, neighbouring uses and development design can influence an air-quality brief. The examples below concern different proposals and consenting routes.

Millennium Retail Park: room layout and ventilation

At Millennium Retail Park (24/1965/F), the June 2025 Planning Board minutes record how the applicant addressed A102 traffic and neighbouring uses through the residential design. The proposed response included filtration and heat-recovery ventilation for some homes, together with fewer habitable rooms facing the A102. The Board resolved to grant permission subject to referral, a legal agreement and conditions. This example shows why air quality, acoustics and room layout need to develop together.

For your brief: Coordinate exposure, room orientation and ventilation while the layout can still change.

Read the public planning record

Silvertown Tunnel: separate construction controls and operational monitoring

Silvertown Tunnel illustrates a different evidence programme. Its Greenwich construction air-quality plan sets out dust, vehicle and plant controls. Operational effects sit within a separate monitoring and mitigation framework: the development consent requires baseline NO₂ monitoring, independent annual review and mitigation where the specified tests are met. For a new project, the useful lesson is to distinguish construction management from operational assessment and to define what monitoring will trigger.

For your brief: Set the monitoring purpose, review criteria and management response before collecting data.

Construction air-quality plan · Consent monitoring requirements

06 / Interactive project checklist

Greenwich evidence planner

Answer five questions to assemble a starting brief. Keep uncertain points visible by choosing “Not sure yet”. Answers are processed in this page.

Your proposal

This planner organises a project brief. It does not decide legal requirements or demonstrate compliance.

07 / The horizon

Keep dates and policy status visible

Royal Greenwich 2040: emerging plan

The Regulation 19 consultation ran from 27 July to 6 September 2026. The council describes examination before intended adoption. Keep emerging policy and its stage distinct from the adopted Core Strategy.

A revised Air Quality Action Plan decision is listed for March 2027, with status “For Determination” when checked. This is a forward programme, not an adopted replacement. Recheck progress at submission.

Review changes in transport, energy, construction and national air-quality guidance against the assessment year. For local schemes, consider a defined ecological receptor or designated-site pathway where relevant, rather than adding an unsupported blanket requirement.

08 / Your next step

Start your Greenwich air quality brief

Send the site address, development description, drawings and planning stage. Include traffic or energy information already available, any council request and the intended programme.

ACP can then identify the assessment workstreams, information gaps and practical next steps for your proposal.

Discuss the assessment scope

09 / Common project questions

Greenwich air-quality FAQs

Is the whole of Greenwich an Air Quality Management Area?

Yes. Defra lists the whole borough as the Greenwich AQMA, declared on 1 July 2001 for nitrogen dioxide and PM10. This designation does not mean every location currently exceeds an objective. Check monitoring year, pollutant and the proposed exposure at the actual site.

Does the Greener Greenwich SPD still apply?

Cabinet agreed adoption of the Climate Resilience SPD and revocation of the Greener Greenwich SPD on 18 March 2026. Use the replacement guidance and adopted planning policies. Historic reports citing the earlier SPD need a document-status review.

What does Policy E(c) require for air pollution?

The adopted Core Strategy policy addresses developments with potentially significant air-quality impacts and measures to minimise them. It also addresses transport emissions and residential exposure. Read the policy with London Plan SI1, current validation requirements and the specific proposal.

Does Greenwich use NO2 diffusion tubes?

Yes. The council reports diffusion-tube monitoring alongside continuous analysers. The networks answer different questions: tubes provide longer-period indicative NO2 results, while automatic instruments resolve shorter-term variation. A tube does not measure PM10 or PM2.5.

Can I use the Woolwich Flyover result as my site background?

Choose a monitor that represents the site and assessment purpose. A roadside flyover reading includes local traffic influences. It should not automatically be used as urban background or transferred to a courtyard, upper-floor home or another road.

How should a Greenwich Peninsula or Charlton Riverside scheme be scoped?

Identify road and tunnel approaches, adjacent commercial or industrial activities, servicing, plant and construction phases. Check which sources can affect the particular receptors. Coordinate ventilation, overheating and acoustics before fixing a mitigation strategy.

Is an Air Quality Neutral calculation the whole assessment?

Air Quality Neutral compares specified building and transport emissions against London benchmarks. Exposure, local impacts, construction dust and any applicable Air Quality Positive work answer additional questions. Agree the submission schedule for the application.

Is the Royal Greenwich 2040 Local Plan adopted?

The council held its Regulation 19 consultation from 27 July to 6 September 2026 and describes independent examination before intended adoption. Keep the emerging plan separate from the adopted framework and check the latest examination position when submitting.

Greenwich / Your next step

Discuss your air quality project

Send the site, proposal and planning stage. Include any council request and programme constraints so ACP can identify the assessment steps.

0330 236 7329
hello@acp-consultants.com

Explore our London air quality guide

Your details are handled under our privacy policy.