Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Islington / Planning & development

Air quality assessment in Islington

An air quality assessment in Islington should be coordinated with the Local Plan and Climate Action SPD. The strongest brief records how the design has responded to air quality, alongside the assessment of development emissions and future exposure.

ACP helps applicants and design teams define the evidence, coordinate the assessment and plan practical next steps.

Discuss your project
01

Local guidance

Climate design and Positive evidence

02

Your evidence checklist

Use the planner to organise questions and missing inputs.

03

A coordinated brief

Connect the assessment with the design and programme.

Local context / Streets, sources and exposure

From Holloway Road to the southern city fringe

Islington combines busy through-routes, dense housing, workplaces and construction beside occupied buildings. Begin with the actual street, source and receptor relationship.

01

Roads, junctions and bus activity

The Local Plan identifies Holloway Road, Angel, Seven Sisters Road, Old Street and King’s Cross/Caledonian Road as areas of historic concern. Use current measurements to refine that context. Check bus stands, junction queues and servicing near windows and air intakes.

02

Heat, power and mixed uses

Bring boilers, generators, kitchen extract and proposed energy systems into the brief. Compare locations and operating hours alongside ventilation, odour and noise. Lower carbon emissions alone do not demonstrate lower local pollutant exposure.

03

Works beside sensitive neighbours

Map homes, schools, care settings and relevant ecological receptors around demolition, earthworks and construction access. Then identify the pollutants and pathways needing assessment, including dust deposition where habitats could be affected.

Local Plan paragraphs 6.100–6.105 inform this source-and-receptor review. Historic concern is not a current exceedance claim for every street.

AQMA / Current designation

The whole borough remains designated

Defra’s register records the 19 January 2001 AQMA for annual and hourly NO₂ and daily PM₁₀. The current council report confirms whole-borough coverage. PM₂.₅ needs assessment where relevant, but it is not a pollutant listed in this AQMA declaration.

The original action plan linked designation to the August 2000 review’s predicted objective failures. The declaration date does not establish the first measured breach.

Defra / Coverage matters

22 dashboard records are not the whole network

The Defra dashboard shows 22 of 22 included NO₂ records compliant for 2025. It includes a combined Holloway Road triplicate record. This is a selected reporting dataset; additional council monitoring can tell a different local story.

Navigator Square is reported there at 39.3 µg/m³ after distance correction. Check whether a published value represents the monitor or relevant exposure before reusing it.

Annual values and data capture
Station20192020202120222023202420252025 capture
Holloway Road40312928242324.599%
Arsenal25202020171515.995%

Diffusion tubes show the local variation

The 2025 report covers 271 monitoring locations in its wider summary, with a 21-location long-term series and separate co-location tubes. Three wider-network NO₂ results exceeded 40 µg/m³: MacDonald Road 90 and 78, and City Road 41. These are not the City Road long-term result of 31.0.

In 2024, the wider-network exceptions were two MacDonald Road locations and Pauntley Street/Archway Road. Read the preceding report before interpreting a single year’s change.

Particles and additional evidence

Both reference stations measure NO₂, PM₁₀ and, from 2025, PM₂.₅. The 2025 PM₂.₅ means were 10.1 at Holloway Road and 8.7 at Arsenal; capture was 90% and 97%. This first year does not establish a PM₂.₅ trend.

2025 report: summary and Tables C, E, F and J. Units: µg/m³. National future PM₂.₅ targets and WHO guidelines have different purposes and dates; do not label a result against a future target as a present statutory breach.

Choose data for the assessment question

Use reference monitoring, diffusion tubes, indicative sensors, background maps and dispersion modelling for their respective strengths. Confirm coordinates, height, coverage, adjustment and receptor relevance. Keep provisional live data separate from ratified annual results.

The council’s older source-apportionment study uses LAEI 2010 and historical forecasts. Treat it as background, not a current emissions inventory. Use the current inventory edition and project inputs when quantifying sources.

Current reference-network reports · Council air-quality data and dashboards

Report/data year: 2025; council listing updated 30 July 2026. Detailed monitoring review: 19 October 2026. The council report library was rechecked on 23 October 2026 and still lists this as the latest report.

Local requirements / Adopted policy and submission evidence

Islington policy S7: start before the layout is fixed

Local Plan 2023 — S7

The Local Plan was adopted on 28 September 2023.

Part B requires a preliminary AQA to inform design, followed by a proportionate AQA within the Sustainable Design and Construction Statement (SDCS). It applies to major development, minor new build and larger minor extensions. These categories must achieve at least Air Quality Neutral through on-site measures.

Part D requires Air Quality Positive for proposals exceeding 150 net additional homes or 10,000 m² net additional gross external floorspace. Parts E–F establish the design and mitigation approach. Avoid significant harm and unacceptable exposure across the whole proposal.

Policy S7, page 209; paragraphs 6.95–6.105.

Climate Action SPD — adopted 25 September 2025

This adopted SPD replaces the 2012 Environmental Design SPD. Chapter 7 and Table 6 set out the assessment routes. Table 6 includes minor extensions of 100 m² or more within the larger-minor category.

A simplified London AQN route, where applicable, does not automatically remove the local preliminary/full AQA requirement. Keep those documents distinct. Use the council’s current SDCS templates for the relevant development size.

Chapter 7, pages 76–84 · Templates and adoption documents.

Validation list — 12 April 2024

The air-quality entry on page 25 asks for AQA information within the SDCS, with the preliminary findings and AQN evidence. It states a Positive threshold above 200 homes, while adopted S7 and the later SPD state above 150.

For a scheme between those thresholds, use S7 and the 2025 SPD to plan Positive evidence. Flag the discrepancy when confirming the application document schedule. Do not rely on the older checklist to omit an adopted policy requirement.

Validation list, page 25 · Current submission gateway.

London framework and connected policies

Read S7 with London Plan SI 1 and the adopted 2023 AQN/AQP guidance. Coordinate energy under S4–S5, transport under T1–T3 and relevant biodiversity and amenity requirements. Use site-specific policy and designations where they affect the proposal.

Our London policy guide separates the impact assessment, Neutral calculation and Positive design process.

What goes into the submission?

Prepare a linked schedule for the preliminary AQA, final AQA, SDCS, AQN calculations and any AQP statement. Add construction dust controls, a monitoring proposal and mitigation drawings where relevant. Keep traffic, energy and ventilation assumptions consistent across documents.

Practical design / Construction and operation

Connect the findings to a buildable response

Compare options early

Record the initial source review, occupied floors and ventilation strategy. Compare plant and access options while changes remain practical. The preliminary assessment should influence the scheme; the final report should explain how the design responded.

Dust and monitoring need their own brief

The council’s May 2018 Construction Code covers dust assessment, controls and monitoring in sections 9 and 11. It discusses real-time particles near sensitive premises, with methods, locations and action arrangements agreed for the site.

Its example PM₁₀ trigger of 150 µg/m³ over 15 minutes is a construction-management value, not an ambient annual objective. Check the current method and conditions before adopting any trigger.

Construction Code, pages 28–34

Illustrative local briefs

Turn the location into an assessment brief

These illustrative scenarios show how different Islington settings change the questions to resolve before design is fixed.

01

Holloway Road and Archway frontage

Illustrative brief: new homes facing a busy route, with bedrooms, a courtyard and mechanical ventilation.

Compare street-facing and quieter elevations using the actual intake and window heights. Keep Holloway Road reference monitoring distinct from a different junction or frontage, and assess servicing and proposed plant alongside road exposure.

Useful output A receptor and ventilation plan linking each design choice to the preliminary AQA and the later assessment.

02

Angel and Upper Street mixed uses

Illustrative brief: a small new building or extension beside homes, shops and food uses.

Confirm the development category before relying on a simplified Neutral statement. Bring kitchen extract, delivery activity, heating and neighbouring windows into one brief; coordinate the separate air, odour and noise assessments.

Useful output A proportionate AQA/SDCS document schedule, with plant and extract locations resolved on shared drawings.

03

Caledonian Road and King’s Cross edge

Illustrative brief: a larger housing-led scheme with servicing changes and phased occupation.

Record net additional homes and floorspace at the outset. If S7’s Positive threshold is crossed, retain a design-stage record of emission and exposure improvements. Assess occupied phases alongside later construction and servicing.

Useful output A Positive design statement and phased mitigation schedule that use the same traffic, energy and occupation assumptions.

04

Bunhill, Clerkenwell and Old Street

Illustrative brief: an office refurbishment with construction beside occupied buildings and revised roof plant.

Review intake positions, neighbouring uses, generator or boiler duties and the working sequence. Check the Bunhill and Clerkenwell Area Action Plan where applicable, alongside S7, and plan dust monitoring around the actual sensitive boundaries.

Useful output An air-quality scope linked to the area policy, roof-plant drawings and construction management plan.

Check the adopted Local Plan and Bunhill and Clerkenwell Area Action Plan for the site, with the Climate Action SPD and SDCS templates.

03 / Interactive project checklist

Islington evidence planner

Answer five questions to organise the assessment brief. Choose “Not sure yet” where information is missing; those points remain visible in your results.

Your proposal

Answers stay in this page. The planner organises evidence; it does not certify compliance or decide planning requirements.

04 / A clear assessment package

From the brief to the planning evidence

01 / Scope

Define the question

Bring together the local requirement, proposal, sources and receptors. Identify missing information before detailed work begins.

02 / Assess

Use consistent inputs

Align the baseline, traffic, plant and programme. Explain assumptions and compare relevant scenarios.

03 / Respond

Connect findings to design

Record mitigation and the drawings or specifications it relies on. Review material changes as the project develops.

Our London Neutral and Positive evidence planner helps organise the wider policy workstreams. For construction, use the London assessment and monitoring guidance alongside the site-specific brief.

Where extract, fan noise or sensitive neighbours are involved, coordinate the noise assessment and odour assessment with the same plans. The main air quality service page explains the broader assessment and monitoring services.

On the horizon / Status checked 23 October 2026

Track emerging requirements without confusing their status

Islington Air Quality Action Plan 2025–2030

The consultation closed on 30 November 2025. The council consultation page still describes the 2025–2030 plan as draft and anticipates an outcome update in October 2026. The September 2026 forward plan lists approval for an Executive decision due on 26 November 2026. That is a scheduled decision, not evidence of adoption; recheck the final decision and published plan before submission.

Consultation outcome and draft documents

Regional and national changes

Follow the London hub’s policy updates, Defra PM₂.₅ planning guidance and IAQM’s current guidance register. Defra’s interim PM₂.₅ planning guidance was published on 4 October 2024. IAQM still lists its 2017 v1.2 planning guidance with the EPIC update in progress; the estimated Q3 2026 consultation date does not confirm a completed consultation or final replacement.

The March 2026 Environmental Outcomes Reports roadmap anticipates introduction by the end of 2027. Verify commencement and transition provisions rather than assuming the current EIA route has changed. Recheck these sources when the proposal, evidence or applicable policy changes.

05 / Send what you have

Start your Islington air quality brief

Send the information available now. These details help us identify the next assessment steps and prepare an appropriate scope:

  • Site address, plans and planning reference.
  • Proposed use, scale and application stage.
  • Council comments, conditions and relevant deadlines.
  • Traffic, servicing, energy and extract information.
  • Occupied spaces, windows and ventilation proposals.
  • Construction activities and intended programme.
  • Existing reports, monitoring and material design changes.

For this project, pay particular attention to: climate design and positive evidence.

Local project questions

Islington air quality questions

When does Islington need a preliminary air quality assessment?

Policy S7 Part B requires one before design for major development, minor new build and larger minor extensions. It should inform the design and the later AQA in the SDCS.

Is the Air Quality Positive threshold 150 or 200 homes?

Adopted S7 and the 2025 Climate Action SPD use more than 150 net additional homes, or more than 10,000 m² net additional gross external floorspace. The April 2024 validation list says more than 200 homes. Plan to the adopted policy and identify that discrepancy in the submission schedule.

Does a small new building only need an AQN statement?

A simplified London AQN assessment may be available, but the local preliminary and full AQA requirements are separate. Check the category in S7 and Table 6 of the adopted SPD.

Why does Defra show compliance when some local monitors are higher?

The dashboard includes a selected reporting dataset. The council’s wider monitoring programme covers additional locations, including targeted sites. Compare site IDs, reporting coverage and any receptor correction before drawing conclusions.

Can council monitoring replace monitoring at my site?

It may provide useful baseline evidence if location, year, height and exposure are representative. Review those factors and the assessment method before deciding whether site monitoring or modelling is needed.

Does Islington’s AQMA include PM₂.₅?

The current Defra declaration lists NO₂ and PM₁₀. PM₂.₅ remains relevant to health, planning and national targets, but should not be described as a declared pollutant without a revised AQMA order.

Can dust, noise and odour be coordinated?

Yes. Use one set of plans, plant details, receptor locations and construction phases. Keep the assessment methods and conclusions clear for each topic, with a shared mitigation schedule where useful.

Where can I compare London-wide requirements?

Use the linked London air quality hub for SI 1, Neutral and Positive guidance and borough comparisons. Then apply Islington’s own policy, validation list and current supplementary guidance to the site.

Islington / Your next step

Discuss your air quality project

Send the site, proposal and planning stage. Include any council request and programme constraints so ACP can identify the assessment steps.

0330 236 7329
hello@acp-consultants.com

Explore our London air quality guide

Your details are handled under our privacy policy.