Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Ealing / Planning & development

Air quality assessment in Ealing

From the A40 and Hanger Lane to Southall, Acton and quieter neighbourhood streets, the assessment should start with the source, the proposal and the people who may be affected.

ACP connects air quality assessment, monitoring and mitigation with transport, building services and planning evidence. We help applicants and design teams develop a clear, coordinated brief.

Discuss your project
01

Local planning context

Policy 7A, London SI1 and the correct planning authority.

02

Evidence that fits

Separate roadside nitrogen dioxide, industrial particles and background conditions.

03

Your assessment brief

Connect traffic, plant, ventilation and construction inputs.

01 / Source and setting

Different parts of Ealing raise different questions

01

A40, A406 and Hanger Lane

Map road-facing windows, intakes and outdoor space against the junction and main-road network. Traffic changes need to identify affected links, vehicle types and the opening year, rather than relying on a single borough average.

02

Acton, Horn Lane and Park Royal

Review industrial sources, deliveries, dust and combustion plant alongside traffic. A nitrogen-dioxide assessment alone may not answer the particulate question. Check the OPDC boundary before selecting the development plan and submission route.

03

Southall, Hanwell and town-centre sites

Bring housing, schools, mixed uses, servicing and energy proposals into one receptor plan. Consider neighbours affected by new emissions as well as future occupants exposed to existing sources.

The AQMA remains borough-wide

Defra records Ealing’s declaration on 14 December 2000 for annual NO₂ and daily PM₁₀. An active designation does not mean every location currently exceeds an objective.

Defra AQMA record · Council Park Royal context · OPDC planning authority

02 / Measured evidence

Roadside nitrogen dioxide has fallen over the longer term

The latest council report covers 2025 and was published in May 2026. Keep its annual results separate from provisional current readings.

3

Continuing automatic locations

Acton Vale closed in February 2025; its capture was too low for a reported annual value.

60

Diffusion-tube locations

66 individual tubes, including triplicate co-location sets.

34.2

Hanger Lane NO₂

µg/m³ in 2025; annualised with 66.2% capture.

Annual NO₂ / 2019–2025

Two road environments

µg/m³. Dashed line: annual objective of 40.

Hanger Lane Gyratory

EA6 · roadside

34.2 µg/m³ in 2025

Hanger Lane Gyratory annual NO₂, 2019–2025: 64.5, 51.0, 49.4, 51.5, 40.5, 36.4, 34.2 µg/m³.0204060802019202020212022202320242025

2025 NO₂ capture: 66.2%; annualised.

Western Avenue

EI1 · roadside

28.3 µg/m³ in 2025

Western Avenue annual NO₂, 2019–2025: 48.6, 35.2, 35.9, 35.2, 30.1, 28.3, 28.3 µg/m³.0204060802019202020212022202320242025

2025 NO₂ capture: 99.1%.

View annual values
ASR Table D, page 24 · µg/m³
YearHanger LaneWestern Avenue
201964.548.6
202051.035.2
202149.435.9
202251.535.2
202340.530.1
202436.428.3
202534.228.3

Monitor positions and data-quality adjustments matter when selecting a modelling baseline.

Read the report and quality notes · Current monitoring readings

03 / Particles and interpretation

Check the pollutant as well as the place

2025 annual means · µg/m³ · ASR Tables D and G
StationNO₂PM₁₀
EA6Hanger Lane34.222.9
EI1Western Avenue28.324.8
EA8Horn Lane BAM23.929.5
EI8Horn Lane TEOM—25.7

Horn Lane has two PM₁₀ instruments at one physical location. PM₁₀ capture was 88.5–97.5%; keep the instrument series separate.

PM₂.₅ evidence

The report’s PM₂.₅ figures are indicative estimates from PM₁₀, rather than direct measurements. Select suitable measured or modelled evidence for the assessment question.

Diffusion-tube interpretation

Use the reported bias-adjusted annual means and retain any annualisation. Compare co-located instruments separately from tubes at different road distances.

Background selection

A roadside value is not a universal background input. Match the year, setting and pollutant, then account for local sources without counting the same road contribution twice.

Defra local-authority dashboard · Council report library

04 / Planning and submission

Connect Policy 7A with the right planning route

Adopted development plan

The council’s adopted-plan register includes the 2012 Core Strategy and December 2013 Development Management DPD. Policy 7A addresses emissions, sensitive uses, mitigation and cumulative effects. Part C rejects sensitive uses that achieve acceptable amenity only by substantially sealing users off from their surroundings. Test the layout and exposure before relying on closed windows or filtration.

Adopted-plan register · Policy 7A, pages 14–15

Older air-quality SPG

The published SPG covers traffic, industrial sources, exposure and modelling inputs. Its references and monitoring inventory are historic. Read it alongside current London policy and technical methods, rather than carrying its old thresholds into a new assessment unchanged.

Air Quality and Pollution SPG

Application documents

Use the council’s current application gateway for the chosen application type. Include any requested assessment, construction plan and mitigation drawings. A generic validation page does not establish a universal air-quality trigger for every minor proposal.

Supporting documents and validation

Old Oak and Park Royal

OPDC determines planning applications within its area and has its own development plan. Locate the site against that boundary before choosing policy references or submission documents.

OPDC role and planning authority

London Plan SI1 and the local action plan

Keep the impact assessment, Air Quality Neutral calculation and any applicable Air Quality Positive statement identifiable. Their purposes and tests differ. Ealing’s action plan also addresses construction generators, combustion plant and suitable AQN evidence.

Ealing Air Quality Action Plan 2022–27 · London policy and evidence tools

05 / A coordinated design response

Align the assessment with decisions the team can make

Transport and servicing

Identify where journeys change, including the delivery route and fleet. Keep transport assumptions, future baseline and opening year consistent across the application.

Building services and exposure

Map windows, outdoor uses, intakes and flues in three dimensions. Review energy plant and standby generators with operating modes and nearby receptors. Consider ventilation alongside noise, overheating and maintenance.

Construction and local sources

Bring demolition, earthworks, trackout and plant into the dust-management brief. Select inspection and monitoring arrangements that respond to the activities and neighbours rather than using a standard equipment list.

For commercial kitchens, align odour treatment, extract discharge and fan noise with the same drawings. Where emissions have a credible pathway to an ecological receptor, include that question in the scope.

06 / Local practice

Plan the evidence and the delivery controls together

Ealing’s published action plan asks major construction projects to consider alternatives to diesel and petrol generators. It also discusses quantitative evidence for combustion plant and AQN/AQP documentation.

For a site with standby power, separate routine testing, emergency use and construction plant. Use the actual equipment and operating assumptions, then link assessment findings to the submitted mitigation and monitoring commitments.

Read the action plan, measures 5b–7a

07 / Interactive project checklist

Ealing evidence planner

Answer five questions to organise the assessment brief. Choose “Not sure yet” where information is missing; those points remain visible in your results.

Your proposal

Answers stay in this page. The planner organises evidence; it does not certify compliance or decide planning requirements.

08 / Your assessment package

What should your Ealing air quality report cover?

The scope follows the proposal and the authority’s request. These are typical workstreams to agree at the start.

01 / Homes and mixed uses

Exposure and development emissions

For road-facing homes or a change of use, assess future occupants, nearby receptors and the scheme’s traffic or plant. Explain the baseline, opening year, modelling assumptions and mitigation. Identify any Air Quality Neutral evidence separately.

02 / Construction and industry

Dust, particles and monitoring

For demolition, earthworks or sites near working premises, identify activities, routes, occupied neighbours and relevant pollutants. Set out the justified controls and, where needed, monitoring locations, review criteria and responses.

03 / Conditions and changes

A traceable submission

For a condition response or revised scheme, use the exact condition and approved report. Explain changes to traffic, equipment, flues or layout. Link the assessment to the current drawings and the commitments being submitted.

Use the London Neutral and Positive evidence planner for regional requirements. Coordinate noise and odour where sources or neighbours overlap. Our air quality service guide explains the wider assessment and monitoring options.

09 / On the horizon

Track the replacement plan and monitoring changes

Ealing submitted its replacement Local Plan in November 2024. The examination news records further modifications correspondence in June 2026. The adopted-plan register still identifies the existing documents; the replacement plan is treated here as emerging.

Keep future policy requirements separate from the adopted planning basis. For each submission, check subsequent adoption notices and the guidance version requested by the authority.

Replacement-plan examination · Examination news

Review later monitoring releases as the network changes. Current sensor readings can help investigate patterns; annual assessment evidence needs suitable quality assurance, capture and a representative period.

10 / Your next step

Start your Ealing air quality assessment

Send the information you have so the assessment can be scoped around the proposal:

  • Site address, planning authority, application stage and council comments.
  • Layout, uses, floors, sensitive neighbours and outdoor spaces.
  • Traffic, deliveries, parking and the proposed opening year.
  • Energy plant, generators, flues, testing hours and ventilation intakes.
  • Construction programme, access, activities and proposed controls.
  • Previous assessments, monitoring and material design changes.

Use our main air quality service guide for assessment and monitoring options, and the London hub for the wider policy framework. Coordinate noise and odour advice where relevant.

11 / Common questions

Ealing air-quality FAQs

Is all of Ealing within an AQMA?

Yes. Defra records a borough-wide designation for annual nitrogen dioxide and daily PM₁₀. The designation and current monitoring results answer different questions.

Which local policy should the assessment address?

Start with the adopted development plan, including Policy 7A on amenity, alongside London Plan SI1. Within the OPDC area, check the corporation’s development plan and submission route.

Does the older air-quality SPG still provide the complete method?

The council continues to publish the SPG. Its local assessment topics are useful, but its historic policy references, monitoring inventory and technical thresholds require cross-reading with current guidance.

How should I choose a background concentration?

Match the pollutant, assessment year and setting. Review suitable monitoring, Defra background data and local sources together, explaining adjustments and avoiding double-counting road contributions.

Are the Horn Lane particle results one station series?

The report presents separate BAM and TEOM PM₁₀ instruments at Horn Lane. Retain the instrument identity when comparing annual values and selecting evidence.

Do smaller developments or changes of use need an assessment?

Scope depends on emissions, exposure and the proposed use, as well as size. Policy 7A addresses both sensitive uses and emissions-producing development. Check the application requirements and any council request; being a minor proposal or being within the AQMA does not settle the assessment scope by itself.

What should a generator or energy-plant proposal include?

Provide equipment, emissions, exhaust conditions, flue position, operating modes and testing hours. Include nearby receptors and other relevant plant so dispersion and cumulative effects can be reviewed.

Is the replacement Ealing Local Plan already adopted?

The sources checked on 20 October 2026 show the replacement plan in examination and the existing documents in the adopted-plan register. Confirm any later adoption notice before submission.

Ealing / Your next step

Discuss your air quality project

Send the site, proposal and planning stage. Include any council request and programme constraints so ACP can identify the assessment steps.