Air quality assessment in Lewisham

Clear air-quality evidence for development in Lewisham, Catford, Deptford, New Cross and the wider borough. ACP helps teams connect traffic, new occupants, construction and building design.

Define the baseline, the future scenario and the changes your project introduces.

Discuss your project
01

Current local policy

SD6 in the adopted 2025 Local Plan, with current application and construction guidance.

02

Monitoring in context

Roadside and background trends, 148 tube locations and a changing automatic network.

03

A coordinated brief

Use the evidence planner to connect transport assumptions, exposure and mitigation.

01 / A borough-specific brief

Main-road exposure and future development

Lewisham town centre and Loampit Vale

Review busy junctions, the road network and the position of occupied façades. The council identifies Lewis Grove’s street setting and traffic as relevant to its monitored NO₂ concentrations. Distinguish a monitor inlet from the proposed window or intake.

New Cross and Deptford

Coordinate road traffic, servicing, energy plant and nearby development. Where a site is near the river, industrial activity or major works, include those sources when the actual emissions and receptor pathways justify assessment.

Catford, the South Circular and southern corridors

Check local source conditions rather than transferring a town-centre result across the borough. A proposal can introduce new sensitive occupants even when its own traffic contribution is small.

Map the AQMA boundary

Lewisham has more than one designated AQMA. Defra lists the 2001 Lewisham designation covering large areas and ribbon roads, plus the 2013 Crofton Park and Honor Oak Park designation. Check the exact site on the current map. Defra’s Lewisham AQMA records.

Keep the future scenarios compatible

Align opening years, committed schemes, traffic forecasts, fleet assumptions and energy plant across the transport and air-quality work. State which changes are already included, so cumulative effects are neither omitted nor counted twice.

02 / Local monitoring

Read the 2025 results alongside the longer trend

The report published in May 2026 covers calendar year 2025. Its full-year automatic NO₂ results were below the annual objective, with a marked fall at Loampit Vale after the higher 2024 result.

148

NO₂ tube locations

The council network reported in the 2025 monitoring review.

33

Loampit Vale NO₂

2025 annual mean, µg/m³, at the monitor.

36.1

Highest tube result

Lewis Grove L95, µg/m³, before the report’s exposure adjustment.

Measured annual NO₂ / 2019–2025

Two roadside records, different histories

Annual mean concentrations at the monitoring inlet, in µg/m³. The dashed line marks the national annual objective.

New Cross

LW2 · roadside

18.7 µg/m³ in 2025

New Cross annual nitrogen dioxide, 2019 to 2025: 37.9, 29.1, 32.4, 29.6, 26.3, 25.1, 18.7 micrograms per cubic metre.0204060Annual objective 40 µg/m³19202122232425

Loampit Vale

LW4 · roadside

33 µg/m³ in 2025

Loampit Vale annual nitrogen dioxide, 2019 to 2025: 42.8, 35.6, 35.4, 38.4, 42.6, 46.1, 33.0 micrograms per cubic metre.0204060Annual objective 40 µg/m³19202122232425
View the annual values
Annual mean NO₂, µg/m³. ASR Table D. LW2: New Cross; LW4: Loampit Vale.
YearLW2LW4
201937.942.8
202029.135.6
202132.435.4
202229.638.4
202326.342.6
202425.146.1
202518.733.0

Source: 2026-published ASR, Table D and section 1.2. NO₂ data capture in 2025: LW2 83.3%; LW4 97.8%. These station values do not determine exposure at every site.

03 / Methods and qualifications

Tubes, particles and the changing network

2025 annual means, µg/m³
StationNO₂PM₁₀PM₂.₅
LW2
New Cross
18.718.110.8
LW4
Loampit Vale
3317.8—
HP1
Honor Oak Park
14.712.88.0
LW6
Laurence House, Catford
18.0——

Source: ASR Tables D, G and I. — means no result presented here. LW5 Deptford closed in April 2025; its incomplete-year value is excluded from this annual comparison.

Diffusion tubes add street detail

The report covering 2025 identifies 148 NO₂ monitoring locations. Its highest tube result was L95 Lewis Grove, 36.1 µg/m³ at the monitor and 34.6 µg/m³ after distance correction for relevant exposure. Retain bias adjustment, capture and annualisation information.

Particulate matter needs its own review

PM₁₀ and PM₂.₅ can respond differently to NO₂. New Cross and Honor Oak Park provide PM₂.₅ records, while Loampit Vale adds PM₁₀. Select pollutants using the actual traffic, combustion, construction and neighbouring sources.

Four full-year locations, plus the former Deptford site

The 2025 report includes five automatic sites used during the year, but Deptford was decommissioned in April. Its 24.3% full-year capture was insufficient for annualisation. Do not compare its indicative particle result with a complete annual mean.

Current readings are a different evidence layer

Use the council monitoring portal for current conditions and Defra’s local-authority dashboard for local-authority monitoring and action information. Confirm the reporting year, data status, siting and method. Sensors, annual ratified results and background estimates serve different purposes.

04 / Policy and submission

Use the adopted SD6 policy and the correct submission route

Local Plan 2025: SD6

The Local Plan was adopted on 16 July 2025. SD6 (printed pages 374–375, with supporting text on pages 376–379) requires a design-led approach, at least Air Quality Neutral development and consideration of individual and cumulative impacts. Older references to Core Strategy policy 9 or DM23 need updating. Adoption decision · Adopted plan, SD6.

Assessment beyond major development

SD6 covers major proposals, relevant minor schemes in AQMAs or AQFAs, and community infrastructure or uses attracting particularly vulnerable groups. Scope the actual use, sources and future occupants. Council assessment-scoping guidance.

Dust, machinery and construction guidance

Use SD6 with the council’s Good Practice Guide and current London dust/NRMM guidance. The plan’s supporting text calls for real-time dust monitoring at medium- and high-risk sites. Council Good Practice Guide.

Current validation lists and the 2026 consultation

The gateway still links application-specific October 2022 requirements. A separate update was consulted on from 1–29 September 2026. The consultation page describes review before finalisation and adoption; its closing date alone does not establish replacement. Submission gateway · Draft update and status.

Keep the evidence packages identifiable

Item 9 of the linked major checklist covers AQA and Air Quality Neutral/Positive evidence. It asks for existing conditions, future exposure and pollutant sources during construction and operation. The wider checklist also covers transport inputs, energy, ventilation and construction management. Read its application-specific requirements with SD6 and current London guidance. Linked major-development checklist.

Coordinate energy and the waterway setting

SD6’s supporting text addresses biomass/CHP modelling and directs waterside proposals to the Port of London Authority’s air-quality strategy. Select source-specific evidence where applicable; retain realistic plant and operational assumptions.

05 / Assessment to design

Four Lewisham settings. Four evidence briefs.

These illustrative briefs translate local setting into useful assessment decisions. Select the work needed for the actual proposal, its neighbours and its occupation programme.

Lewisham town centre: a road-facing home

For an illustrative residential scheme around Loampit Vale or Lewis Grove, distinguish the traffic-facing rooms, rear courtyard and proposed intakes. The monitoring results above describe their inlet locations; retain receptor height, setback and any exposure adjustment in the brief.

Useful outputA receptor plan and a justified baseline, coordinated with the ventilation and acoustic design.

Deptford and New Cross: overlapping development

For an illustrative mixed-use redevelopment, align opening years, servicing, traffic forecasts and nearby committed schemes with the transport team. Where a site adjoins the Thames or relevant commercial activity, establish whether those emissions affect the proposed receptors.

Useful outputA scenario schedule showing what is already in the traffic forecasts and how cumulative effects are treated.

Catford and the South Circular: phased construction

For an illustrative phased project near occupied homes or community uses, show where early residents and neighbours will be during demolition and earthworks. Assess dust risk and agree controls, machinery requirements and any monitoring before fixing the occupation programme.

Useful outputA phase-specific construction plan with receptors, controls, monitoring triggers and review points.

Crofton Park and Honor Oak Park: a sensitive use

For an illustrative nursery, care setting or community facility, check the exact AQMA boundary and the people who will use the space. Consider outdoor play or amenity areas as well as indoor exposure, and select monitoring that represents the road and building setting.

Useful outputAn application-specific SD6 scope linking exposure, layout, ventilation and proportionate evidence.

Record the baseline and opening years, traffic and background inputs, plant assumptions and relevant development in each scenario. Connect the findings to drawings, specifications and construction controls so mitigation is ready at the stage it is needed.

Local practice / Evidence before claims

What local projects show about monitoring

Baring Primary School Roadvent pilot

The council’s project update reviewed on 20 October 2026 identifies Baring Primary School, with baseline diffusion-tube and air-node monitoring underway and planning permission granted in 2026. It describes preparation for installation. The useful assessment lesson is to establish the baseline and a method for checking change before claiming an exposure benefit. Council project update.

Indoor air quality in sensitive settings

Lewisham’s indoor-air project launched in May 2026 and focuses on nurseries and care homes. For development work, coordinate outdoor concentrations with ventilation, filtration, indoor sources and maintenance. The right measurement question depends on who uses the space and how it operates. Local indoor-air and school initiatives.

The practical lesson is to define the monitoring question, baseline and review method before making a performance claim.

06 / Interactive project checklist

Lewisham evidence planner

Answer five questions to assemble a starting brief. Keep uncertain points visible by choosing “Not sure yet”. Answers are processed in this page.

Your proposal

This planner organises a project brief. It does not decide legal requirements or demonstrate compliance.

07 / What is changing

Track the next evidence and guidance updates

Validation review after September 2026

Check the council’s published adoption and replacement notice before relying on the consulted-on lists. The adopted 2025 plan and a draft validation document have different roles. Keep application scope proportionate to the scheme. Follow the validation update.

Action planning and monitoring

The 2022–2027 Air Quality Action Plan was the programme linked by the council portal when reviewed on 20 October 2026. Review later ASRs, monitoring-network changes and evaluated project results as they are published; separate intended outcomes from verified measurements.

The IAQM register lists planning guidance 2017 v1.2 while an update with EPIC is in progress, and construction-dust guidance 2024 v2.2 while its update is in progress. Use the latest published editions and check for issued replacements when scoping the work; an estimated consultation date is not a publication date.

08 / Start with the available information

Start your Lewisham air quality brief

Send the site address, planning reference and available plans. Include the proposed use, council comments, transport information, plant and ventilation details, and the construction programme.

For phased or revised schemes, add the expected occupation year, other relevant development and a schedule of changes from any earlier report.

Discuss your project

Questions / Local answers

Lewisham air-quality FAQs

Is all of Lewisham in one AQMA?

No. Defra lists the Lewisham designation covering large areas and ribbon roads, together with Crofton Park and Honor Oak Park. Check the exact site and pollutant designation on the current map.

Which local air-quality policy applies now?

SD6 in the Local Plan adopted in July 2025 is the current air-quality policy. It replaced older Core Strategy and Development Management policy references. Use the adopted plan and the applicable submission requirements.

Can a minor development need an assessment?

Yes. SD6 includes relevant minor development in AQMAs or AQFAs and proposals introducing sensitive receptors to existing poor air quality. Community uses attracting vulnerable groups also need particular consideration.

What do the 2025 monitoring results show?

The report published in May 2026 covers 2025. Full-year automatic NO₂ results were below the annual objective. Loampit Vale recorded 33 µg/m³, while the highest tube result was 36.1 µg/m³ at Lewis Grove before exposure correction.

Are diffusion tubes and particles monitored?

Yes. The report identifies 148 NO₂ tube locations and automatic PM₁₀ and PM₂.₅ results. These methods answer different questions; preserve capture, adjustment and siting information when selecting assessment evidence.

Why is Deptford excluded from the annual comparison?

LW5 closed in April 2025. Full-year data capture was 24.3%, too low for annualisation. Its indicative particle result is not presented as a comparable complete annual mean.

How should cumulative development be included?

Use compatible years and transport scenarios, identify relevant developments and explain whether they are already included in the forecasts. Review overlapping construction phases and avoid counting the same traffic change twice.

Are the September 2026 draft validation lists adopted?

The checked consultation page describes review and finalisation before adoption. The gateway still links October 2022 application lists. Confirm a published replacement notice when submitting, rather than treating consultation closure as adoption.

Lewisham / Your next step

Discuss your air quality project

Send the site, proposal and planning stage. Include any council request and programme constraints so ACP can identify the assessment steps.

0330 236 7329
hello@acp-consultants.com

Explore our London air quality guide

Your details are handled under our privacy policy.

Evidence / Sources and guidance

Lewisham guidance and sources

Detailed monitoring evidence was reviewed on 20 October 2026. Planning and validation sources were rechecked on 23 October 2026. Report publication dates and measurement years are identified separately. Source conditions and data-quality qualifications matter when applying borough evidence to a specific project.

Source availability checked 23 October 2026: the council’s air-quality portal and direct report links are temporarily offline for maintenance. The dated monitoring and programme evidence above is retained; check for restored reports and subsequent updates before using it for a new project.