Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

BAT MITIGATION · ROOST DESIGN · PRACTICAL DELIVERY

Bat Mitigation & Roost Design

Good bat mitigation starts with the building, the bats and the proposed change. We help turn survey findings into a workable design that protects roost function and gives your project team clear requirements.

ACP reviews opportunities to retain roosts, reduce impacts and specify appropriate replacement provision where necessary. Our advice connects ecology with architectural drawings, materials, lighting, construction sequencing and long-term care. We explain the options before you commit to work.

Discuss your mitigation design Explore the design options

Request a scoped quote

Discuss your mitigation design

Share your reports, drawings and proposed works. We will help define the next step.

Get Your Free Quote Today
Great! What’s the property address for your quote?

Start with the design, not a shopping list of bat boxes

A report identifying bats does not automatically mean the whole proposal must stop. However, it does mean the design needs to respond to the roost and the activities that could affect it. The first useful question is what can remain functional throughout the project.

For example, moving a rooflight, retaining a section of roof or changing a service route might avoid an important feature. Yet keeping the entrance alone may achieve little if insulation, lighting or internal alterations make the roost unsuitable.

We review the existing evidence alongside your drawings. Then we explain which options deserve investigation, what further information would change the decision and how the preferred approach could be documented. Our guide to design options after a bat assessment explains this early conversation.

Translate the survey findings into a design brief

The brief should identify the ecological function that the scheme must protect. A species name and a box symbol on a drawing are rarely enough.

Describe the existing roost

Record the species, roost type, seasonal use, numbers observed, access points and known internal features. Distinguish a day roost from a maternity, mating or winter roost. Also record uncertainty: an observed emergence point does not necessarily reveal every occupied crevice.

Locate the evidence on drawings that the architect and contractor can use. Show which features were inspected, which remained inaccessible and where a design assumption depends on further investigation.

Describe the proposed effects

Compare demolition, roof work, repointing, insulation, services, lighting and landscaping with that baseline. Consider temporary effects during construction as well as the completed building. Scaffolding, sheeting and temporary lamps can affect access before the permanent works begin.

Our preliminary roost assessment and emergence survey pages explain how the underlying evidence is gathered.

Apply the mitigation hierarchy in the right order

The hierarchy helps the project team compare options before the design becomes difficult or expensive to change.

1. Avoid the effect

Retain the relevant roost and its supporting conditions. Review the location, extent and timing of the proposal. Document why an option avoids the predicted effect, including access, microclimate and lighting.

2. Reduce remaining effects

Where impacts remain, refine the method, working area and programme. Agree ecological supervision and protection measures around the particular risk. A smaller intervention can still require a licence.

3. Compensate for unavoidable loss

Where loss cannot be avoided, design suitable replacement provision. Its location, function and availability matter. Adding a nominal number of boxes does not establish that the lost roost has been adequately replaced.

Choose the roost provision that fits its purpose

External bat boxes, integrated wall units and retained roof spaces offer different conditions. A design must explain why the selected provision is suitable for the affected bats and the role of the original roost.

Crevice-roosting bats may use narrow spaces within building fabric. Other species and roost types need substantial enclosed space, including room to fly internally. Consequently, a wall unit and a bat loft are not interchangeable simply because both provide somewhere to shelter.

CIEEM section 6.3 brings together building-roost design principles. It strongly favours retaining existing provision where feasible and considers access, location, internal space and surrounding habitat together.

Conceptual comparison of an external crevice bat box, integrated wall unit and retained bat loft
Illustrative design types, not equivalent replacements. Cutaways explain the spaces; dimensions, materials and construction interfaces require project-specific design.

Retaining a roost means retaining how it works

A retained roost can be affected even when nobody touches the precise place where a bat was recorded. A roof conversion may remove internal flight space. New insulation can change temperature patterns. A replacement soffit may close the route between an entrance and the roosting area.

Use a coordinated plan and section to show the retained space, access route and interface with the occupied building. Review windows, rooflights, ventilation, partitions and services against that arrangement. Consider construction access and later repairs at the same time.

Paragraphs 6.3.1–6.3.4 of the UK Bat Mitigation Guidelines explain the preference for retaining existing building roosts and their functional context. ACP uses this as a design question: which attributes does the proposal preserve, and which would it change?

Bat boxes and integrated units: specify more than a model number

Boxes can provide useful mitigation or enhancement in suitable circumstances. However, evidence of their use varies with species, design, location and purpose.

External boxes

Assess the mounting position, exposure, fixing arrangement, durability and safe future access. A tree-mounted unit also needs a fixing and inspection arrangement that accommodates tree growth. Identify who will replace a failed or damaged box.

Keep the approach accessible to bats and consider nearby predators, light spill and disturbance. A general box-siting recommendation is a starting point, not proof that a specific position compensates for a particular roost loss.

Integrated units

Show the unit within the wall or façade detail early. Coordinate the dedicated roost cavity with insulation, moisture control, fire safety and the external finish. The bat entrance should not become an unintended route into the occupied building.

Record the product specification and proposed position on the drawings. Also define how alternatives will be reviewed: a visually similar product may have a different internal space, entrance or thermal performance.

A practical specification checklist for roost provision

These six items make a proposal easier to price, build and inspect. They are a briefing checklist, not a standard specification for every site.

Purpose and evidence

State the target species, roost function and relevant survey findings. Explain whether the feature is retained mitigation, replacement compensation or additional enhancement.

Location and access

Give each feature an identifier. Show its elevation, height, aspect, approach and connection to suitable habitat. Explain why that position fits the ecological evidence.

Internal arrangement

Define the usable space, surfaces, entry route and relevant dimensions. Coordinate obstructions, junctions and interfaces so the intended roost remains accessible.

Materials and environment

Identify the proposed materials and any certification needed. Address temperature, shading, moisture, airflow and exposure. Assess the complete arrangement rather than one component.

Delivery and protection

Show when the feature becomes available, who checks it and what prevents accidental damage or closure. Identify construction stages that need ecological attendance.

Aftercare and evidence

Name the responsible party, maintenance needs and agreed checks. Define the records needed to demonstrate installation and assess whether the intended function is being achieved.

Bat lofts, retained roof voids and dedicated buildings

Where bats need a substantial internal space, the layout should account for their movement as well as the place where they hang or shelter. A nominal roof volume can be misleading if trusses, partitions or equipment obstruct the usable space.

CIEEM section 6.3 discusses internal flight space and distinguishes crawling access from the larger openings needed by horseshoe bats. Published dimensional examples should not be copied as a universal minimum: species, roost function and the existing situation govern the design brief.

For a dedicated roost building, establish a suitable location and long-term management arrangement before progressing the architectural solution. Planning, structural design and building-control requirements still need to be resolved. A new structure is not successful simply because it has been built.

Microclimate: warmth, cooling opportunities and seasonal function

Roost temperature depends on much more than compass direction. Roof materials, solar gain, shade, insulation, thermal mass and ventilation interact. A design that becomes warm in spring can also need refuge from excessive summer heat.

The UK Bat Mitigation Guidelines, paragraphs 6.3.18–6.3.28, discuss thermal variation and opportunities for bats to select different conditions. For a significant roost, environmental measurements can help describe the baseline and check the completed design. Record the monitoring location and period so the results can be interpreted.

A winter roost raises different questions about temperature stability, humidity and seasonal use. It cannot be treated as a standard summer box installation. See our hibernation survey guidance where winter use is relevant.

Roofing membranes and materials: check the actual product

Membrane selection is a technical design decision. The descriptions “breathable” and “bat friendly” do not, by themselves, establish suitability.

Understand the current guidance

BCT explains that bats can become entangled in fibres from unsuitable non-woven roofing membranes. Its current guidance describes a snagging-propensity test as a gateway for considering non-bitumen coated roofing membranes in licensing.

Natural England’s current A13 guidance requires the relevant test certificate when such a membrane is proposed. It identifies an exception for bitumen 1F felt with a non-woven, short-fibre construction. Passing the test does not guarantee acceptance of the whole proposal.

Control the specification and substitutions

Identify the exact product, construction and supporting evidence. Coordinate its installation with condensation control, ventilation, insulation and the bats’ access to the roof assembly. Consult the ecologist, architect and relevant building specialist together.

Keep an agreed substitution procedure. A contractor should not replace the specified membrane with an apparently equivalent roll without review. Likewise, covering an unsuitable membrane creates further interfaces and should not be presented as a routine remedy.

Roof tiles and coverings: plan the work before opening the roof

Bats can use small spaces beneath tiles, ridge details, flashing and cladding. Removing these features can expose or injure concealed animals even where the main roof void appears empty.

CIEEM paragraph 6.9.12 describes careful hand dismantling of relevant external features under the direct supervision of the named bat ecologist or accredited agent in the licensed context. It also addresses close, safe access and checks of the exposed materials and spaces.

For your project, agree the method, permissions, timing, supervision and response to unexpected findings before work starts. The contractor provides the appropriate construction skills and safe system of work; ecological attendance does not replace those responsibilities.

Illustration of a roofer lifting a tile while an ecologist observes from a scaffold platform
Conceptual illustration of close ecological supervision and planned access. This is not an ACP project photograph or an instruction to start removing roof coverings.

Build a sequence with clear ecological hold points

A hold point is a stage that needs an agreed check before the next operation proceeds. These examples show how to make the programme explicit; the actual sequence must follow the project’s evidence and permissions.

01

Before mobilisation

Confirm the approved drawings, permissions, working window, team responsibilities and contingency contacts. Brief the contractor and check safe access.

02

Before affecting a roost

Check that required alternative provision and protective measures are ready. Resolve any specified ecological checks and licence conditions.

03

Before closing the detail

Inspect hidden junctions, access routes and specified materials while they remain visible. Record photographs and agree any correction.

04

Before handover

Confirm the completed provision, lighting settings and management responsibilities. Issue the as-built record and agreed follow-up programme.

Lighting and dark connections are part of roost design

A suitable roost can become difficult to use if its entrance or approach is illuminated. Review permanent lighting, construction lamps and light escaping from new glazing. Also consider the connection to hedges, trees and feeding habitat.

The ILP/BCT guidance note GN08/23 provides a framework for ecological and lighting specialists to work together. Establish the sensitive features first. Then assess the need for lighting, its location, direction, output and operating period, and verify the agreed scheme after installation.

Show the receptors and relevant assessment planes on the lighting drawings. A plot at ground level alone may not explain conditions at an elevated roost entrance. Equally, warm-coloured lamps or a low headline lux value do not prove that a scheme is acceptable everywhere.

Coordinate bat provision with retrofit and building requirements

The ecology proposal must work within the completed building. Resolve conflicts in the design team before procurement or site work.

Insulation, ventilation and solar panels

Check whether insulation closes an access route or alters the roost’s temperature. Consider the effects of roof-mounted equipment on access, shading and future maintenance. Keep the ecological assumptions visible on the relevant architectural detail.

The aim is a coordinated solution for the building and roost. It is not a general exemption from energy, ventilation or moisture-control requirements.

Fire, structure and heritage

Discuss cavities, fire barriers, partitions and structural members with the appropriate designers. Never create a bat passage by informally bypassing an essential fire or structural detail.

For a listed building, discuss consent and material restrictions early. Record the approved arrangement and responsibilities so later maintenance does not unintentionally remove it.

Different settings need different mitigation solutions

Trees and woodland

Retaining a tree’s roost function can require more than retaining its trunk. Assess arboricultural work, surrounding cover, access and lighting. Replacement tree-roost measures need their own ecological justification.

Bridges and other structures

Repairs, joint sealing, coatings and changes to drainage or lighting can affect concealed roosts. Coordinate the investigation and works design with the structure’s engineering and access requirements.

Winter and high-value roosts

Hibernation, maternity and other important roosts can require a more specialist assessment and design response. Confirm the team’s competence and the applicable licensing route before promising a method.

Worked design example: a roof conversion with an established roost

Illustrative scenario, not an ACP project record. Surveys identify a roost in one part of a roof. The initial proposal places a rooflight and new insulation across that area. The example shows questions to resolve, not a pre-approved solution.

Review a retention option

The team considers relocating the rooflight and retaining a dedicated roof compartment. They test whether the original entrance, internal movement and suitable conditions can remain. They also review where new services and partitions would pass.

This option needs evidence and technical coordination. A retained outline on a plan does not establish that the roost will continue to function.

Compare the remaining implications

If retention is feasible, the revised drawings describe the protected space and construction sequence. If it is not, the team evaluates a justified replacement design and the necessary permissions.

For either option, the roof materials, lighting, installation checks and aftercare are specified. The client receives a comparison of implications, uncertainties and next decisions before choosing a route.

What should a bat mitigation design package contain?

The agreed scope depends on the project. A coordinated package should make the following information easy to find.

Evidence and impact assessment

Survey findings, limitations, roost function and the effects of the proposal. State the alternatives considered and the reason for the preferred response.

Plans, elevations and sections

Locations and identifiers for retained and new provision. Show access routes, usable spaces, materials and important building interfaces at an appropriate scale.

Specification and schedule

Products or performance requirements, supporting certificates where relevant, sequence of works and ecological attendance. Explain the approval route for substitutions.

Working method and contingency

Protection zones, briefings, hold points and the response to unexpected bats or evidence. Align these with the applicable licence and construction arrangements.

Lighting and landscape coordination

Identify the dark routes and supporting habitat to retain or establish. Show how the lighting and landscape drawings satisfy the ecological requirements.

Verification and aftercare

Inspection records, as-built information, maintenance responsibility and follow-up checks. Identify how a problem will trigger review and corrective action.

Design advice, planning permission and licensing are separate steps

A mitigation design supports decisions; it does not grant permission to affect bats. In England, a mitigation licence may be needed where the proposed activities would otherwise be unlawful. Planning approval does not replace that licence.

Natural England’s A13 process requires a method statement, relevant maps and figures, and a work schedule. The design must therefore explain both the eventual outcome and how the team will get there. Conditions and supporting documents need to be consistent.

Our bat mitigation licence page explains the licensing routes and application process. This page focuses on the physical design, coordination and delivery of the measures.

Construction checks turn a proposal into functioning mitigation

Installation quality can determine whether the design works. An entrance may be mortared closed, a cavity filled, or a specified material substituted. These defects can become difficult to correct after the roof or wall is finished.

Agree inspection stages while important details remain visible. Keep dated photographs against feature identifiers and drawing revisions. Record deviations, decisions and any corrective work. A delivery record should explain what was actually installed.

Brief the contractor on the ecological purpose of each requirement. This helps the team recognise a change that needs review. It also makes the instruction more useful than a drawing note that simply says “ecologist to advise”.

Measure delivery and ecological performance separately

Was the design delivered correctly?

Check the specified locations, dimensions, materials, access routes and lighting controls. Record whether protection and maintenance arrangements are in place. These checks establish implementation; they do not by themselves establish successful use by bats.

Is it serving the intended function?

Agree relevant follow-up methods and success criteria for the particular roost. Consider species, seasonal use and the objective of the provision. A single absence observation may be inconclusive, while a single bat record does not necessarily demonstrate replacement of a maternity roost.

How ACP can support your design team

Share the survey reports and current proposal together. We can review the ecological constraints, discuss avoidance options and develop a scope for mitigation design and coordination with your project team.

Agree which deliverables are needed: ecological design requirements, drawing review, material advice, working-method input, site attendance or follow-up. Specialist methods, competence and any necessary licence coverage should be confirmed before those activities are commissioned.

Costs depend on the roost, evidence gaps, design complexity, coordination and delivery stages. Our bat survey costs guide explains why a clear scope matters. We will distinguish the design advice from separate survey, application, construction and monitoring costs.

Bat mitigation and roost design FAQs

Can we avoid mitigation by changing the design?

A supported design change may avoid the predicted impact. The ecologist must assess the revised proposal, including indirect effects. Do not assume that retaining a roof or moving a window automatically removes survey or licensing requirements.

Are bat boxes enough to replace a lost roost?

Sometimes boxes form part of a suitable response, but they are not a universal replacement. Species, roost function, location and the scale of loss determine what is appropriate. Significant building roosts may need substantially different provision.

How many bat boxes should a project provide?

There is no universal number for every development. The proposal needs to explain the purpose, type, location and expected function of each feature. A quantity alone does not demonstrate an adequate response to roost loss.

Do integrated bat units open into the house?

They should provide the intended dedicated bat space within a coordinated building detail. The design should resolve insulation, moisture and fire interfaces and prevent unintended access to occupied rooms.

Can any breathable roofing membrane be used?

No. Check the exact product and current guidance. For a non-bitumen coated membrane proposed through the A13 route, Natural England requires a snagging-test certificate. That certificate does not automatically approve the full design or licence application.

Can a roofer start lifting tiles before the ecologist arrives?

Do not begin work that depends on ecological checks, supervision or permissions before those requirements are met. Agree the relevant work area, method and hold points in advance. Stop the affected operation if unexpected bats or evidence are encountered.

Is winter automatically the safest time for roof work?

No. Some buildings support hibernating bats, including concealed roosts. Timing must reflect the evidence, roost function, weather and permissions. The current mitigation guidance specifically cautions against assumptions about winter absence.

Does a bat loft have a standard minimum size?

Published dimensions describe particular circumstances and should not be treated as a universal design rule. The required usable space and access depend on species, roost function and the evidence for the site.

Does warm-white lighting make a scheme acceptable?

Colour temperature is only one consideration. Review the need for light, its distribution, intensity, timing and effects at roost entrances and habitat connections. The ecological and lighting design should be assessed together.

Can mitigation be installed after the original roost is removed?

The sequence needs explicit justification and approval where required. Replacement provision should be ready beforehand where feasible. Temporary alternatives are not automatically acceptable and must be evaluated against the project’s circumstances.

Will bats definitely use the new provision?

No design can guarantee uptake. Use appropriate evidence, reduce avoidable risks and agree meaningful follow-up. Monitoring should distinguish installation quality from use of the provision for its intended ecological function.

Does planning permission authorise the bat works?

Not by itself. A separate bat mitigation licence may be needed for otherwise unlawful activities. Confirm the applicable permissions and conditions before starting the affected work.

Guidance behind the design advice

Reviewed 14 November 2026. These sources inform the principles above. Project-specific evidence, professional judgement and the applicable permissions determine the final specification.

  1. Reason & Wray (2025): UK Bat Mitigation Guidelines, version 1.2

    Sections 5.2–5.5 cover principles and delivery; 6.3 covers building roosts, materials and boxes; 6.9.12 addresses supervised dismantling. The 2025 amendments include winter-working cautions. Detailed paragraph references appear beside the relevant advice above.

  2. Natural England: bats and planning decisions

    Evidence, assessment of effects, avoidance and replacement roost function. It also addresses coordination of planning and licence conditions.

  3. Natural England: applying for a bat mitigation licence (A13)

    Current application requirements, method statements, work schedules and roofing-membrane evidence. This is England-specific licensing guidance.

  4. BCT: non-bitumen coated roofing membranes

    Current snagging-test gateway and regulatory assessment. Read the current-work and FAQ sections alongside the historical research background.

  5. BCT: bat boxes

    Different artificial-roost types and species requirements. Product provision still needs a project-specific purpose.

  6. BCT: putting up a bat box

    General siting principles, habitat connections and disturbance considerations. These are not automatic compensation criteria.

  7. ILP/BCT: Bats and Artificial Lighting at Night, GN08/23

    Ecological and lighting assessment, design coordination and technical evaluation. Use the current document rather than treating colour temperature as the whole solution.

  8. BCT: avoidance, mitigation and compensation

    Definitions, retention, supporting habitats and the role of follow-up.

  9. BCT: Bat Surveys for Professional Ecologists, fourth edition

    The survey evidence that informs assessment and design. Survey methods should answer the site’s specific questions.

  10. BCT: maintaining a bat box

    Aftercare and the constraints on opening, moving or disturbing occupied provision. Plan lawful access and responsibility in advance.

Turn the survey findings into a practical design

Send ACP the reports and current drawings. We can discuss the constraints, identify design questions and agree the ecological input your project needs.