What do biodiversity net gain consultants in Kent check first?
We check the red-line boundary, application history, deciding authority and existing habitat evidence. This determines the assessment scope before a layout or off-site purchase is relied upon.
How do I compare biodiversity net gain Kent quotations?
Compare the included survey, condition assessment, metric, report and planning support. Check separately for legal fees, habitat units, management and monitoring. A low assessment fee does not establish the full cost of delivering the gain.
Does every Kent development need 20% BNG?
No. Do not apply a county-wide ambition as a universal requirement. Identify the permission’s statutory position, current local policy and any site-specific requirement. Maidstone’s recent checklist distinguishes particular garden-settlement allocations from other development.
Does Medway follow the same planning policy as Kent?
Medway shares the LNRS area but has its own planning authority and development plan. Its policy position must be checked separately.
Is the Kent and Medway LNRS still a draft?
No. It was published in November 2025. Use the current strategy and mapping advice, even where older council pages still refer to its preparation.
Can a small Kent site be exempt?
Possibly. From 6 August 2026, qualifying applications for sites of 0.2 hectares or below can benefit from the new exemption, subject to the priority-habitat exclusion and transitional rules. Other exemptions also exist. Record the evidence supporting the claim.
Can I assume a self-build house is exempt?
No. The standalone exemption was removed for new applications from 6 August 2026. An earlier application or another exemption can change the position, so check the planning history.
Does a Kent habitat-bank listing prove units are suitable?
No. Check the habitat type, legal security, national registration, available quantity and allocation. The development’s metric must also account for the relevant location and trading requirements.
Can BNG resolve Stodmarsh nutrient neutrality?
The requirements are separate. A site may need both a biodiversity calculation and nutrient mitigation evidence. Any combined delivery proposal needs its own assessment and supporting agreements.
When should I arrange a BNG survey in Kent?
Before fixing a layout that depends on an assumed habitat baseline. Survey timing depends on the habitats and any related species work. Early review helps identify seasonal constraints and avoid redesign.
Can ACP prepare a BNG assessment for a Kent planning application?
ACP can scope the habitat survey, metric and reporting around the authority’s requirements. Provide the red-line boundary, proposed layout and planning comments so the required outputs can be identified.
What happens after the biodiversity gain plan is approved?
The agreed habitat work and secured management commitments still need to be delivered. Keep the approved plans, responsibilities, monitoring evidence and reporting dates available to the land manager and project team.