Regional field guide · South East England
Biodiversity Net Gain in South East England
Find the authority, local policy and habitat evidence for your site.
A school near Horsham, a site in the South Downs and a housing scheme in Maidstone can follow different planning routes. Start with the red line, then check the gain target and who will manage the habitat.
Regional atlas
Find your council and nature recovery strategy
The map groups the South East by its nine published Local Nature Recovery Strategies (LNRS). Select a numbered area or use the text index. Each area gives the councils, local habitat map route and a question to take into the survey.
Simplified strategy boundaries © Natural England 2024. Contains OS data © Crown copyright and database right 2024. Boundary data · Open Government Licence v3.0.
Berkshire
Reading, Newbury, Slough and Bracknell
Six unitary councils decide ordinary applications. On the M4 corridor, trace water and habitat links beyond the borough boundary.
Published LNRS · 7 October 2025
Royal Borough of Windsor and Maidenhead
Compare the Kennet and Thames floodplains with the heathland and woodland mosaics to the south. Match a mapped measure to the actual parcel before assigning strategic significance.
Planning council directory (6)
Bracknell Forest · Reading · Slough · West Berkshire · Windsor and Maidenhead · Wokingham.
Berkshire BNG guide · Strategy and guidance · Open the habitat map
Buckinghamshire and Milton Keynes
Aylesbury, High Wycombe, Buckingham and Milton Keynes
Milton Keynes has its own planning authority and plan. At the Oxford–Cambridge corridor, separate a development parcel from adjoining infrastructure land.
Published LNRS · 13 November 2025
Buckinghamshire Council
Check connections between Bernwood woodland and farmland, Chiltern chalk habitats and the Great Ouse valley. A hedge link may be more useful than an isolated planting block.
Planning council directory (2)
Buckinghamshire · Milton Keynes.
Buckinghamshire BNG guide · Strategy and guidance · Strategy documents and map
East Sussex and Brighton & Hove
Brighton, Hove, Eastbourne, Hastings and Lewes
Brighton & Hove is unitary. Inland, check the district and the South Downs National Park boundary before using a city or district policy.
Published LNRS · June 2026
East Sussex County Council
At the Ouse floodplain and Pevensey Levels, examine water levels and drainage alongside grassland condition. On chalk slopes, test whether restoration can join existing species-rich turf.
Planning council directory (6)
Eastbourne · Hastings · Lewes · Rother · Wealden · Brighton & Hove.
East Sussex BNG guide · Strategy and guidance · Open the habitat map
Hampshire
Winchester, Basingstoke, Farnborough, Portsmouth and Southampton
Portsmouth and Southampton are unitary. The South Downs and New Forest national parks have planning powers within their boundaries.
Published LNRS · 8 December 2025
Hampshire County Council
The Test and Itchen chalk streams, north-east heathlands and Solent coast need different evidence. Check riparian access, grazing or water quality before choosing a habitat target.
Planning council directory (13)
Basingstoke and Deane · East Hampshire · Eastleigh · Fareham · Gosport · Hart · Havant · New Forest · Rushmoor · Test Valley · Winchester · Portsmouth · Southampton.
Hampshire BNG guide · Strategy and guidance · Open the habitat map
Isle of Wight
Newport, Ryde and Cowes
The island has its own unitary planning authority, adopted Island Planning Strategy and nature recovery strategy.
Published LNRS · Published by October 2025
Isle of Wight Council
Check chalk downland, coastal slopes and watercourses against the island map. For a coastal parcel, establish whether erosion, exposure and access allow the promised management.
Planning council directory (1)
Isle of Wight.
Kent and Medway
Maidstone, Canterbury, Ashford, Chatham and Ebbsfleet
Medway is unitary. Around Dartford and Gravesham, check whether the red line falls within the Ebbsfleet Development Corporation area.
Published LNRS · 2025
Kent County Council
Kent’s published priorities include chalk grassland, heathland mosaics and grazing marsh. Along the Thames and Medway estuaries, inspect ditch water levels and disturbance before promising wetland gains.
Planning council directory (13)
Ashford · Canterbury · Dartford · Dover · Folkestone and Hythe · Gravesham · Maidstone · Sevenoaks · Swale · Thanet · Tonbridge and Malling · Tunbridge Wells · Medway.
Kent BNG guide · Strategy and guidance · Open the habitat map
Oxfordshire
Oxford, Bicester, Banbury, Didcot and Witney
Oxford City is one of five district-level authorities. Didcot and Bicester lie outside the city, so an Oxford address is an unreliable policy shortcut.
Published LNRS · 12 November 2025
Oxfordshire County Council
Use the local habitat map to compare Thames floodplain restoration with upland grassland and woodland connections. Check the water regime before modelling a floodplain meadow.
Planning council directory (5)
Cherwell · Oxford · South Oxfordshire · Vale of White Horse · West Oxfordshire.
Oxfordshire BNG guide · Strategy and guidance · Open the habitat map
Surrey
Guildford, Woking, Redhill and Staines-upon-Thames
Use the current district or borough for ordinary applications. The two new Surrey councils take on functions in April 2027.
Published LNRS · 31 March 2026
Surrey County Council
Use the statement of priorities to interpret the mapped measure. On the North Downs or near the Thames Basin Heaths, check habitat connectivity and protected-site effects separately.
Planning council directory (11)
Elmbridge · Epsom and Ewell · Guildford · Mole Valley · Reigate and Banstead · Runnymede · Spelthorne · Surrey Heath · Tandridge · Waverley · Woking.
Surrey BNG guide · Strategy and guidance · Open the habitat map
West Sussex
Crawley, Horsham, Chichester, Worthing and Bognor Regis
The Gatwick and coastal growth areas cross different planning contexts. Check the district, any park boundary and whether a county function applies.
Published LNRS · June 2026
West Sussex County Council
Compare floodplain and riparian opportunities along the Arun and Adur with coastal grazing marsh and downland. Check whether a target survives the proposed drainage and cutting regime.
Planning council directory (7)
Adur · Arun · Chichester · Crawley · Horsham · Mid Sussex · Worthing.
West Sussex BNG guide · Strategy and guidance · Open the habitat map
Check the red line against the deciding authority’s map. A strategy area can contain several planning authorities. Find your council by postcode · Check the national LNRS register.
Who decides?
Choose the South East planning authority before the survey
For most housing and commercial applications, start with the district, borough or unitary council. County councils have separate functions, including minerals, waste and certain county developments. A national park or development corporation can change the route.
Ebbsfleet and the Kent banks
In the Ebbsfleet development area, send the application to the Development Corporation. Elsewhere in Dartford or Gravesham, check the borough route. On a former industrial parcel, survey the vegetation mosaic before treating all previously developed land as sealed surface.
Check the corporation boundary→Growth corridors cross council lines
The Oxford–Cambridge growth corridor includes Oxford and Milton Keynes, while Cambridge lies in the East of England. On a multi-parcel proposal, identify each authority, strategy area and watercourse catchment before choosing an off-site location.
Read the corridor prospectus→South Downs and New Forest
A postal town can sit outside the park while part of its hinterland falls inside. Check the park boundary and delegated arrangements. Around Southampton, Portsmouth and the Solent, screen protected-site and nutrient effects alongside the habitat assessment.
Check the affected catchments→Council reorganisation. On 29 October 2026 the government confirmed decisions for East Sussex and Brighton & Hove, and Oxfordshire including adjoining West Berkshire. Their future arrangements still require implementation. Surrey’s East and West unitary councils take over in April 2027. Decisions for Hampshire and Kent were withdrawn for reconsideration, and West Sussex was awaiting a decision. Use today’s councils for a current submission and recheck before discharge. Read the dated government update.
Application route
Which biodiversity net gain rules apply in South East England?
For ordinary planning permission within scope, Schedule 7A to the Town and Country Planning Act 1990 sets a minimum 10% gain against the pre-development baseline. Then check whether the adopted local plan adds a higher or more specific requirement.
Application date and exemptions
For applications made from 6 August 2026, a site of 0.2 hectares or less may qualify for exemption if the development does not impact on-site priority habitat. Measure the whole red-line site. A separate exemption covers wholly temporary development permitted for five years or less, subject to the priority-habitat test.
Check the original consent for a section 73 variation. The former self-build category is no longer a general exemption for new applications. Current exemption tests · ACP exemptions guide.
Baseline now, gain plan after permission
At application, state whether the gain condition applies and why. Where required, submit the baseline value and metric, a scaled habitat plan, the relevant date and any irreplaceable habitat information. Explain earlier clearance and supply evidence for any earlier baseline.
Normally the authority must approve the Biodiversity Gain Plan before work begins. Phased permissions have additional overall and phase-plan requirements. Planning practice guidance.
Major, non-major and infrastructure routes
For major schemes, address harm to higher-distinctiveness habitat first. Then assess on-site enhancement and creation before registered off-site gains. Qualifying non-major applications made from 6 August 2026 can consider on-site and off-site routes together. Statutory credits remain a last resort.
Nationally significant infrastructure applications submitted from 2 November 2026 follow the development consent regime and relevant gain statement. Use the current metric guidance for cross-boundary and multi-catchment projects. Infrastructure gain statements · Statutory metric tools.
Adopted and emerging policy
How South East BNG policies change the design brief
The South East has no single Local Plan. Compare the statutory test with the current development plan for the red line. These examples show which drawing, calculation or management commitment an applicant may need to change.
Maidstone · residential development
The March 2024 Local Plan Review, LPRSP14(A), sets a minimum 20% gain for new residential development. The borough’s guidance describes on-site delivery and distinguishes the statutory requirement from the additional local requirement. It also explains the August 2026 changes.
For housing, test the layout against the local target early. If there is a shortfall, set out the scope of each requirement and discuss the evidence with the borough. Maidstone policy and application evidence.
Guildford · qualifying proposals
Policy P7 of the Development Management Policies adopted in March 2023 requires 20% for qualifying development, or the advised national minimum if greater. Guildford’s 2026 biodiversity report applies that expectation across relevant habitat categories.
Keep area, hedgerow and watercourse results separate. For new homes near the Thames Basin Heaths, check whether the scheme must fund alternative greenspace and visitor management. Budget these separately from biodiversity units. Thames Basin Heaths Avoidance Strategy and Tariffs SPDs. Guildford’s implementation report.
Two national parks · habitat networks
In the South Downs, SD9 addresses biodiversity and geodiversity, SD10 international sites, and SD11 trees, woodland and hedgerows. The park adopted the plan in July 2019. Its replacement completed Regulation 19 consultation in June 2026 and remains emerging at this review.
Map retained woody boundaries and their construction buffers. In the New Forest National Park, SP5 addresses impacts on international sites and SP6 covers important habitats, species and water features. Map both before fixing the layout. New Forest Local Plan, SP5 and SP6. Read SD9–SD11 · Check the replacement plan stage.
Oxford, Reading and Milton Keynes · connected habitat
Oxford’s adopted 2036 Plan uses G1 and G2 for green and blue infrastructure and biodiversity, with G7 protecting trees, woodland and hedgerows. In Reading, check EN12 and EN14 in the 2019 plan alongside the emerging partial update. Milton Keynes uses Plan:MK NE3 for biodiversity and geological enhancement.
Along the Thames or Great Ouse, show how the parcel connects to the wider corridor. In Oxford, include enough baseline evidence to validate the application. Show retained habitats and how the layout accommodates proposed planting. Oxford Technical Advice Note 18 (PDF). Oxford policy context · Reading adopted plan and update · Milton Keynes policies map.
Brighton & Hove and the Isle of Wight · urban and coastal sites
Brighton & Hove’s City Plan Part Two (October 2022) uses DM37 for green infrastructure and nature conservation. Across the Solent, the Island Planning Strategy adopted on 16 September 2026 brings BNG and the LNRS into EV2. EV5 addresses ancient woodland buffers.
For an infill site, show retained habitat and realistic planting space. On the island, check the adopted IPS map and any woodland buffer before setting the developable area. Brighton & Hove DM37 · Adopted Island Planning Strategy.
Field evidence
What makes a South East habitat proposal deliverable?
A county name cannot establish habitat type or condition. Start with survey evidence, then use the local recovery map to test which measures fit the parcel and its surroundings.
Check the substrate and management
On the North and South Downs, species-rich chalk grassland needs the right soils, propagules and a viable grazing or cutting regime. On sandy heaths, check disturbance, scrub control and access. If those conditions are missing, revise the target before calculating the gain.
Review landscape and habitat policy→Follow water across the red line
An Upper Thames floodplain meadow needs a suitable water regime. A Test or Itchen chalk stream needs an assessment of channel and riparian condition. Estuarine saltmarsh raises different questions about tides and space for landward movement. Screen designated sites and nutrient effects separately.
When river condition assessment matters→Protect the links that already work
Ancient woodland and veteran trees need separate treatment. Check historic evidence, root zones, hedgerows and bat commuting routes. In a town, a rail margin or open mosaic habitat can connect otherwise isolated patches. Survey before clearance and show how construction will protect retained habitat.
Review habitat condition evidence→Using the LNRS in the metric. Locate each baseline and proposed parcel on the published local habitat map. Record the mapped measure, target habitat and why the intervention meets it. Then apply the current strategic-significance guidance to the relevant row. Being inside a strategy area alone earns no uplift. Spatial risk for off-site delivery is a separate calculation. Read the current metric guide.
Your South East BNG evidence brief
Use these checks before fixing a survey scope or paying for units.
Discuss your site with ACP →01Fix the planning boundarySite address, red-line plan, permission history and authority map.
Why it mattersWhere the red line crosses a park or council boundary, agree who will receive the application and later gain plan. Record any delegation.
02Document the baselineDated habitat map, condition sheets, photographs and any clearance history.
Why it mattersSeparate area habitats, hedgerows and watercourses. Test Small Sites Metric eligibility independently of planning application size. Protected species and irreplaceable habitats need their own evidence.
03Compare two layoutsShow retained, enhanced and lost habitat on the same scale.
Why it mattersFor example, move an access road away from an established hedge and recalculate the losses. Record any remaining shortfall by habitat type, rather than one headline percentage.
04Check the local submission listIdentify the adopted policy, the authority’s validation list and any pre-application response.
Why it mattersMaidstone publishes application-stage guidance. Mid Sussex distinguishes the later gain plan and its supporting plans, allocations and credit receipts. Use the version for the deciding authority.
05Secure delivery and monitoringNamed land parcels, management tasks, access, funding and a programme.
Why it mattersFor significant on-site enhancements and registered off-site gains, establish the legal mechanism and minimum 30-year management period. Identify who receives monitoring reports and who pays for corrective work.
Registered off-site delivery
Where can a South East project find biodiversity units?
Start with the metric’s shortfall and trading rules. Seek a written offer for the correct habitat, quantity and delivery location. The public register lets you check a boundary and existing allocations. The operator confirms price, terms and uncommitted capacity.
Duxford Old River
BBOWT describes restoring former pasture in the Thames floodplain. The register covers 32.23 hectares and records an enhancement start of 1 April 2023. Its allocation tab assigns 0.49 area units of modified grassland to St Hugh’s School, Vale of White Horse, P25/V2678/FUL.
Inspect the Duxford allocation→Iford Biodiversity Project
The 18.77-hectare entry falls under the South Downs National Park Authority. Its allocation tab records 0.09 area units for Slinfold Primary School in West Sussex. Use the reference for the individual registered parcel when comparing an offer with the development’s metric.
Inspect the Iford allocation→Burpham Court Farm and Tyting Farm
Guildford’s 2026 report projects around 30.5 area units and 2.6 hedgerow units at Burpham, and around 140 area units and 29 hedgerow units at Tyting. These are council project estimates. Check current registration, allocation and availability directly before relying on either scheme.
Read the council’s delivery evidence→Does crossing a county boundary matter? The November 2026 terrestrial metric uses the relationship between the impact site and the gain site’s local planning authority or National Character Area. Watercourses use catchments. Therefore a nearby site can give a different result from a more distant one in the same character area. Check the workbook before agreeing a quantity. Compare off-site unit offers · Section 106 agreements and conservation covenants.
Budgeting for delivery
What does a South East BNG budget pay for?
Ask for separate figures for survey and design, land or units, legal work, council oversight and habitat management. They have different payees, dates and scopes. A charge published by one council applies only on its own terms.
Council monitoring · Mid Sussex
For 2026/27 Mid Sussex publishes monitoring fees of £10,000 (minor), £12,000 (major), £13,000 (major plus), £14,000 (super major) and £15,000 (super major plus). It also lists £1,000 for a year-zero inspection. Legal fees are additional.
For example, 20 dwellings fall within its 10–49 dwelling major band. Where the monitoring obligation applies, budget £13,000 for monitoring and the initial inspection together, before legal fees. Confirm the band and current terms for the actual application. Mid Sussex fee schedule.
Unit price and legal costs
A habitat bank quotes for a specific habitat and allocation. Confirm whether the offer includes legal work, allocation registration, long-term management, monitoring and tax. Hart’s Cabinet set an initial sale price subject to annual review in 2025. Obtain the current offer before using it in an appraisal.
For on-site delivery, price establishment, replacement planting, survey visits, reporting and remedial work across the management term. Ask the authority or responsible body for a separate legal and administration estimate. Hart pricing decision and review terms · Prepare a management and monitoring plan.
Statutory credits · last resort
Government credit prices are national and depend on the habitat tier. For example, at £42,000 per A1 credit, a one-unit eligible A1 shortfall requires two credits and costs £84,000. This illustration uses the government’s two-to-one rule; it is not a habitat-bank quotation.
Retain evidence of the on-site and off-site options explored, then use the metric’s shortfall summary and the government purchase route. Survey fees and council charges remain separate. Check current credit tiers and prices · Units and statutory credits explained.
Public records and field research
What can an applicant learn from the evidence?
Read the decision, metric and gain-site allocation together. They record different stages. To find out whether a target habitat has developed as planned, look for dated condition surveys and monitoring reports.
One school, two public records
West Sussex County Council granted permission with conditions on 2 May 2025 for a replacement classroom extension and landscaping at Slinfold CofE School. The published gain plan explains the on-site shortfall. The Iford register entry identifies the off-site allocation. Keep the development reference consistent across all three documents.
Read the decision and supporting evidence→Compare habitat area as well as units
A University of Kent-led study of six early-adopter councils found a proposed 20.5% increase in units alongside a 34% reduction in open green-space area in its sample. These were design forecasts before the statutory regime. For a layout review, report the area lost, target condition and delivery assumptions beside the percentage.
Read the original research→Check whether a meadow can persist
The Open University’s Floodplain Meadows Partnership studies the effects of flooding, soil water and nutrients on vegetation. At feasibility stage, check levels, inundation duration and access for cutting. If drainage or management changes after construction, the original grassland target may need a different design.
Explore floodplain meadow research→Trace Slinfold’s published gain plan to the Natural England allocation. For Duxford, compare the operator’s restoration account with the registered boundary.
Related guidance
Choose your next step
For biodiversity net gain in South East England, the useful next document depends on what the authority needs to decide.
Before submission
Use a BNG assessment and baseline survey to test layout options. Then check the planning validation evidence against the council list.
After permission
Use the Biodiversity Gain Plan to reconcile the approved layout, final metric and allocations. Set management tasks and monitoring triggers against the secured plan.
Near a regional boundary
For a site crossing into the capital, check the London borough guide. For other locations, start with the England regional guide or BNG locations directory.
Regional questions
South East BNG questions
Use the area directory for the deciding council and nature recovery map. If you already have a council request, include it when you discuss your site.
Which council handles biodiversity net gain in South East England?
For most planning applications, use the district or unitary where the site lies. Check the national park boundary, Ebbsfleet area and county council functions first. A county-wide nature recovery strategy does not decide the application.
Is the gain target always 10%?
The national objective for a qualifying planning permission is at least 10%. Maidstone has a local residential requirement, while Guildford’s P7 applies to qualifying development. Read the adopted policy and any exemption together before setting the design target.
Can I use an off-site gain across the Sussex boundary?
Yes, if the habitat meets the trading rules, the spatial adjustment works and the gain is secured and allocated. Slinfold School’s register entry at Iford shows an actual cross-boundary allocation. Use your own metric to establish the quantity required.
Does an LNRS map remove the need for a habitat survey?
No. It shows mapped priorities and potential measures. The baseline still needs site-specific habitat and condition evidence. Record the map version, the measure and the proposed intervention alongside the survey.
When should we commission a BNG assessment?
Start while access, drainage and the layout can still change. Bring the red line, any planning history and survey dates. Then agree the baseline work, design comparisons and documents needed at application and after permission.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Field guide / source notes
Regional evidence
Reviewed by ACP Consultants