BIODIVERSITY GAIN PLAN · ENGLAND
Biodiversity Gain Plans for planning approval
Bring your permission, biodiversity calculations and habitat commitments together in one coordinated submission.
ACP Consultants prepares and reviews Biodiversity Gain Plans for developers, architects and planning teams. We identify gaps in the evidence and help you address the biodiversity gain condition before work starts.
Discuss your Gain Plan →FROM PERMISSION TO DELIVERY
What is a Biodiversity Gain Plan?
A Biodiversity Gain Plan (BGP) explains how a development will meet its statutory Biodiversity Net Gain requirements. It records the final biodiversity position and the evidence the planning authority needs to assess it.
For development subject to mandatory BNG, the objective is normally at least a 10% increase in biodiversity value. The plan connects the approved development with the habitats, management and any off-site gains that will deliver that objective.
- 01
Application
Establish the habitat baseline and planning-stage BNG strategy.
- 02
Permission
Review the decision, approved plans and relevant conditions.
- 03
Gain Plan
Finalise and submit the coordinated plan and supporting evidence.
- 04
Approval
Obtain the authority’s approval of the Gain Plan.
- 05
Commencement
Start only when this and other relevant requirements are satisfied.
The earliest formal submission is normally the day after permission is granted. The authority usually has eight weeks to determine the plan, unless a longer period is agreed. Build the determination period into your programme.
Plan early; submit at the right stage
The final BGP is distinct from the biodiversity information required with the planning application. Early work should establish the baseline, test the proposed habitat strategy and identify deliverability issues. A draft Gain Plan can support those discussions. Formal approval then follows the post-permission route.
Allow time for survey gaps, design revisions, legal arrangements and off-site allocation. Our BNG process guide explains the wider sequence.
ONE CONSISTENT SUBMISSION
What your Gain Plan brings together
The completed form brings together the evidence package. Its statements should agree with the metric workbook, approved drawings, habitat proposals and delivery arrangements. The required evidence depends on your permission and the way the gain will be achieved.
The Biodiversity Gain Plan
A clear account of the development, biodiversity outcome and how that outcome is secured.
- Permission & baseline
- The permission reference, approved development, plan preparer and submitter, relevant baseline date, habitat survey and any required degradation assessment.
- Metric & maps
- The completed statutory metric, pre- and post-development habitat plans with scale and north point, and matching habitat identifiers.
- Habitat delivery
- Retained, enhanced and created habitats, realistic target conditions, responsibilities and long-term management where required.
- External gains
- Registered off-site allocation references and evidence, or statutory credit purchase evidence where the permitted route requires it.
Explain the biodiversity outcome
The plan should explain the relevant biodiversity gain hierarchy, the pre-development value and the proposed post-development value. It should identify how any shortfall is addressed and how the information can be checked.
Irreplaceable habitats have bespoke compensation arrangements. Identify these habitats explicitly and explain the applicable compensation and degradation evidence.
Use the right supporting documents
Use the current government Gain Plan template and check the authority’s submission requirements. Record the metric tool version and ensure all documents refer to the same scheme.
Our BNG templates guide explains the roles of the available templates. Use the template to organise the ecological evidence and its supporting references.
USING THE CURRENT GOVERNMENT FORM
How to complete a Biodiversity Gain Plan
Start with the government template updated on 6 August 2026. Use a document schedule to connect each answer with its evidence, then check the full package against the permission.
| Sections | Focus of your response | Cross-check |
|---|---|---|
| 1–3 · People and permission | Identify the development, applicant and responsible preparer. | Match the permission reference and complete the declarations. |
| 4 · Strategy | Explain the baseline date, habitat approach, strategic significance and delivery route. | Reference the workbook, condition records and habitat plans. |
| 5–6 · Onsite evidence | Address irreplaceable habitats and the onsite biodiversity results. | Keep area, hedgerow and watercourse values separate. |
| 7–8 · External provision | Identify allocated off-site gains or statutory credits where used. | Match registration, securing and purchase evidence to the claimed contribution. |
| 9–10 · Final checks | Record the trading position and the optional data-sharing decision. | Resolve outstanding evidence before signing the submission. |
The August 2026 update changes question 4.10 for non-exempt minor development using off-site units. Check the application-date and transitional rules explained above when selecting the applicable route.
For phased permissions, use the separate overall and phase templates. Keep a shared evidence register so each phase can be traced back to the whole-site strategy.
DOCUMENTS WITH DIFFERENT JOBS
Gain Plan, metric, report or HMMP?
These documents support one another. The formal Gain Plan connects the metric and ecological evidence with the approved development.
| Document | Its purpose |
|---|---|
| Biodiversity Gain Plan | Sets out how the permission will meet the biodiversity gain condition and brings the final evidence together for approval. |
| Statutory Biodiversity Metric | Calculates biodiversity units, gains and shortfalls using the habitat inputs and applicable rules. |
| BNG report | Explains the assessment, habitat evidence, assumptions and strategy. Its scope depends on the planning stage. |
| Habitat Management and Monitoring Plan | Describes how habitats will be established, managed, monitored and corrected over the agreed period. |
PREPARATION & TECHNICAL REVIEW
How ACP prepares your Biodiversity Gain Plan
We agree the work around your planning stage and the evidence already available. We can prepare a new plan or review an existing package, with surveys, calculations and supporting documents included where agreed.
- 01
Review the permission
Check the decision notice, approved drawings, conditions, planning history and existing BNG information.
- 02
Check the baseline
Review habitat mapping, survey evidence, condition data and the metric inputs. Identify missing or inconsistent information.
- 03
Test the habitat strategy
Check the proposed onsite measures, biodiversity result and any need for registered off-site gains.
- 04
Confirm delivery arrangements
Coordinate management, monitoring, responsibilities and the evidence needed to secure the relevant habitats.
- 05
Prepare the plan
Bring the final biodiversity position and agreed supporting documents into a clear submission package.
- 06
Check and support
Cross-check the documents before issue and support technical queries from the authority within the agreed scope.
What you receive
The agreed service can include the completed BGP, an evidence schedule, consistency checks, identified assumptions and outstanding actions. Metric updates, habitat plans and an HMMP can be coordinated where they form part of the commission.
What we agree at the outset
We confirm who will submit the plan, which revisions and authority queries are included, and any separate survey, legal or off-site unit requirements. The authority retains responsibility for approval.
Already have a permission and BNG documents? We can review what is ready and identify what is still needed for the Gain Plan.
Request a scope review →BEFORE SUBMISSION
Five checks that keep the evidence aligned
One approved scheme
Confirm the same red-line boundary, layout and drawing revisions appear throughout the submission.
Traceable habitat figures
Reconcile habitat areas and lengths between the survey, plans and metric. Explain the baseline date and assumptions.
Deliverable proposals
Check habitat types, target conditions and management against access, drainage, utilities and the landscape design.
Complete securing evidence
Check the required management arrangements, legal mechanisms, registered off-site allocation or credit evidence.
A coherent final package
Resolve conflicting versions, missing references and unanswered authority requirements before issue.
WORKED DOCUMENT-CONTROL EXAMPLE
Follow one design change through the Gain Plan
In this illustrative scenario, a revised access road reduces proposed grassland parcel GH01 from 1,500m² to 1,200m². The habitat area falls by 300m². The team now needs to update five connected records before issue.
- 01
Drawing revision
Show GH01 as 1,200m² on the post-development habitat plan. Record the new drawing revision and identify the revised access footprint.
- 02
Metric entry
Update the parcel’s proposed area from 0.150ha to 0.120ha in the full metric. Recheck the habitat classification, target condition, timing and retained/lost areas.
- 03
Results and trading
Recalculate the headline result and trading checks. A 20% reduction in this parcel’s area does not translate directly into a 20% change in the development’s overall gain.
- 04
Management commitment
Align the HMMP boundary, establishment specification and monitoring area with the revised parcel. Confirm that access, drainage and maintenance remain workable.
- 05
Plan and issue schedule
Transfer the revised results and file references into the Gain Plan. Resolve any changed off-site requirement, then record the final documents and reviewer.
Habitat plan HP02 Rev C · Metric Rev C · HMMP Rev B · Gain Plan Rev B
Different document revision letters are acceptable when the issue schedule identifies the matching approved package.
For the calculation itself, see our biodiversity metric explained guide. This example demonstrates evidence coordination using assumed parcel dimensions.
One coordinated issue
Bring the plan and its supporting evidence together
Use the same drawing references, habitat identifiers and revision schedule across the documents submitted for approval.

DELIVERY BEYOND THE DOCUMENT
Management, off-site gains and phasing
Secure the habitat commitments
Significant onsite habitat enhancements normally need to be secured for at least 30 years after completion of the development. The appropriate mechanism may be a planning condition, planning obligation or conservation covenant.
The management evidence should identify what will be done, who is responsible, when monitoring will occur and how failures will be addressed. A separate HMMP provides the practical detail; our monitoring framework guide explains the reporting role.
Evidence the off-site contribution
Where registered off-site gains are used, the plan needs evidence that the relevant gains are registered and allocated to the development. A quotation or an intention to buy units is not the same as an allocation.
Off-site gains need a section 106 planning obligation or conservation covenant lasting at least 30 years from completion of the habitat enhancement works. Check that the legal agreement, register allocation and metric refer to the same habitats and units.
Statutory biodiversity credits are distinct from private off-site units. If credits are required, the plan needs the appropriate purchase evidence. Check habitat trading rules and the applicable hierarchy before committing to a route.
Coordinate phased development
Phased permissions use an Overall Biodiversity Gain Plan and Phase Biodiversity Gain Plans. The authority must approve the overall plan before any development begins, and approve each phase plan before that phase starts. The gain objective applies to the development as a whole; each phase does not necessarily need to achieve 10% independently.
Keep the whole-site baseline, phase boundaries, habitat delivery and allocation of gains consistent. A new phase does not provide a fresh baseline that ignores earlier impacts. Check the specific permission and modified requirements before submission.
Review changes after approval
Changes to the layout, habitats, management or off-site arrangements may affect an approved BGP. Review the effect on the plan, permission, conditions and legal agreements before implementation. There is no general mechanism to amend an approved Gain Plan. Where the approach changes after approval but before commencement, a new plan can be submitted for approval. Section 73 permissions and transitional cases need project-specific advice.
A CLEAR STARTING POINT
Information, fees and programme
Send what you already have. You do not need a complete package before asking us to review the scope.
- Planning: site address, permission reference, decision notice, conditions and approved drawings.
- Biodiversity: habitat surveys, metric workbook, BNG report, habitat plans and previous authority comments.
- Delivery: management proposals, legal arrangements, off-site information, phasing and target dates.
We quote against the evidence
The fee depends on the complexity of the permission, the quality of existing information and the amount of preparation or revision required. We confirm the scope and quotation after reviewing your documents.
Surveys, metric changes, HMMP preparation, legal work, unit purchases and additional revisions can affect cost and programme. Our preparation period is separate from the authority’s determination period.
If a site start is approaching, tell us the date and any outstanding conditions at the outset. We can identify dependencies without promising an approval date.
COMMON QUESTIONS
Biodiversity Gain Plan questions
Do I need a Biodiversity Gain Plan for every development?
The statutory plan is required where the biodiversity gain condition applies. Exemptions, application dates and transitional arrangements matter. Other ecological or planning requirements can still apply to exempt schemes. Check the permission and current guidance for the individual project.
Can I submit the plan before planning permission?
You can develop a draft and discuss the strategy during the application. Formal submission for approval normally starts no earlier than the day after permission is granted. Prepare the evidence early so the final package reflects the approved scheme.
What approval is needed before development starts?
Where the biodiversity gain condition applies, the authority must approve the Gain Plan before commencement. The metric is supporting evidence. Other pre-commencement conditions and consents must also be addressed.
Can ACP review a plan prepared by someone else?
Yes. We can review an existing BGP and its supporting evidence within an agreed scope. Send the editable metric, relevant plans, survey information, permission and authority comments. We will identify what can be relied on and where further information or revision is needed.
Can all the biodiversity gain be delivered off site?
The answer depends on the permission, habitats, applicable hierarchy and metric rules. The revised hierarchy for qualifying non-major applications differs from the major-development route. Off-site gains need the appropriate registration and allocation evidence; they do not remove other ecological duties.
What helps a Biodiversity Gain Plan get approved?
Use the current template, provide accurate and consistent supporting evidence, and address the relevant approval criteria. Reconcile drawing revisions, metric results, habitat commitments and off-site allocation before submission. Our BNG user guide explains the documents and responsibilities in context.
What if the authority asks for more information?
Review the query against the submitted documents and agree the response scope. A correction to one habitat figure may affect the metric, plans and management evidence together. We can support technical responses, with any additional work agreed before it proceeds.
Discuss your Biodiversity Gain Plan
Align your evidence.Prepare your Gain Plan.
Tell us about your permission, planning stage and the evidence available so we can discuss the Gain Plan support you need.
- 01Your planning position
Share the decision notice, current planning stage and any authority request.
- 02Your evidence package
Tell us which metric calculations, habitat plans and management documents are ready.
- 03Your supporting evidence
Start with the information you have. If a review is appropriate, we can discuss how to share supporting documents securely.
Discuss your Gain Plan with ACP
Start with the information you have. Share your email, site location and the support you need.
We handle your enquiry details in accordance with our Privacy Policy. You can email supporting plans and workbooks when we discuss your project.
OFFICIAL SOURCES
Gain Plan guidance and templates
- GOV.UK: submitting a Biodiversity Gain Plan
- Defra: current Biodiversity Gain Plan template
- Planning practice guidance: BNG, approval and phasing
- GOV.UK: BNG exemptions and application dates
- GOV.UK: securing biodiversity gains
- Defra: overall and phase Gain Plan templates
Technical review: . Standard template checked against the 6 August 2026 release.
This page concerns the town and country planning BNG framework in England. Requirements depend on the application date, permission, development and habitats. Phased schemes, section 73 permissions and irreplaceable habitats need specific review.