Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Biodiversity accounting · Evidence and interpretation

The statutory BNG metric, explained clearly

Understand the inputs.
Read beyond the headline result.

The statutory biodiversity metric measures habitat value in biodiversity units. It compares a development’s baseline with recognised post-development value.

Learn how the three unit types, habitat evidence, risk adjustments and trading rules fit together—and check the arithmetic behind your results.

England guidance · Sources checked 11 November 2026

What does the biodiversity net gain metric measure?

The statutory biodiversity metric is a habitat-based accounting method. Specifically, it uses habitat information to calculate biodiversity units before development and under the proposed outcome. For mandatory BNG, the official statutory calculation tool—or the Small Sites Metric where eligible—must be used.

The metric helps compare design options and identify the type of habitat gains needed. However, it does not measure every species, ecological interaction or planning constraint. A valid calculation therefore sits within a wider BNG assessment, supported by appropriate survey evidence.

BNG Metric 4.0 and the statutory metric

Metric 4.0 is a superseded pre-statutory version. Defra requires the statutory tool for mandatory BNG calculations. By contrast, an older edition of the statutory tool is a separate issue: check its version and the official change history.

Find the current downloads and version guidance in our statutory metric user-guide navigator.

Download the current statutory biodiversity metric

Start with Defra’s files. The links below were checked on 11 November 2026: full metric version 1.1.1 and detailed guidance updated November 2026. The November guide clarifies watercourse spatial risk where an impact site crosses several waterbody catchments. Check that guidance before applying a multiplier.

The official tools collection also provides the macro-enabled file, condition sheets and Small Sites Metric. Check that collection for later releases. Record the version used alongside your assessment date and drawing revision.

The statutory metric was laid before Parliament in November 2023; the final statutory tools followed in February 2024. The current spreadsheet version and guidance publication date are separate records. Defra confirms that its statutory-tool updates do not change unit outputs and that all statutory versions can be used.

For the formal technical basis, see the published metric data values and formulae. For practical data entry, follow our statutory metric workbook user guide.

Three unit types, assessed separately

Area habitat, hedgerow and watercourse units are different types of biodiversity unit. The statutory metric rules prohibit adding, trading or converting them between types. Therefore, the required gain applies to each relevant unit type.

One assessment · Separate accounts

Three accounts. Three results to review.

Area habitats

12 → 13.8

Illustrative baseline and recognised post-development area units.

+15% · Above a 10% arithmetic target
Hedgerows

2 → 2.1

Illustrative baseline and recognised post-development hedgerow units.

+5% · Below a 10% arithmetic target
Watercourses

1 → 1.1

Illustrative baseline and recognised post-development watercourse units.

+10% · At the arithmetic target
Keep the results separateThe hedgerow account still needs attention. Trading rules and all supporting evidence also require review.
Illustrative values after relevant metric adjustments. Review the arithmetic alongside the trading summaries, habitat evidence and delivery arrangements.
ACP ConsultantsOriginal illustration / decision aid · © 2026 ACP Consultants

Area habitats are measured by area, while hedgerows and watercourses use length with their relevant metric inputs. A ditch can also require assessment of the surrounding area habitats and riparian effects. Consequently, review each affected module and record the relevant features consistently.

The evidence behind the baseline inputs

Core inputs and the evidence that supports them
InputWhat it representsWhat to check
Habitat typeThe habitat selected in the metric, informed by appropriate classification.Survey records, definitions and habitat-specific notes. Select the habitat category supported by the evidence.
SizeThe mapped area or length assigned to the parcel or feature.Boundary, parcel IDs, measurement units and consistency between maps and workbook.
DistinctivenessA category associated with the selected habitat type.Correct habitat identification. Distinctiveness is not the same as the condition observed on site.
ConditionQuality against the appropriate habitat-specific criteria, where assessed condition is required.The relevant method and observations. Some inputs are fixed or not applicable.
Strategic significanceThe habitat’s location and relationship to relevant local biodiversity priorities.Whether an LNRS is published, the relevant map and measure, and the correct baseline or intervention rule.

Use our BNG GIS mapping guide to check parcel handover and our habitat condition guide for scoring evidence. In particular, a parcel reference should follow the same feature through both records and the workbook.

Strategic significance after an LNRS is published

The current detailed guide says baseline strategic significance is low (1) once an LNRS has been published for the area. For post-development interventions, high significance (1.15) requires the parcel’s location and proposed intervention to meet the relevant mapped-potential-measure criteria.

Medium significance (1.10) cannot be used under that published-LNRS route. Therefore, being somewhere inside an LNRS area does not automatically earn a higher score. Where an LNRS is not yet published, the guide sets out a different approach using specified alternative documents and defined criteria.

A baseline formula is only the starting point

For a straightforward area-habitat baseline, the familiar relationship is area × distinctiveness × condition × strategic significance. However, watercourses have additional considerations, and creation or enhancement introduces further adjustments. Use the official tool rather than treating this simplified expression as a complete calculator.

See worked biodiversity-unit calculations for arithmetic examples and their limits.

How risk adjustments affect proposed habitat value

Creating a habitat on a plan is different from delivering it in the field. The metric adjusts relevant creation and enhancement outcomes to reflect delivery difficulty, establishment time and, for off-site interventions, spatial risk.

Difficulty of creation or enhancement

Some habitat interventions are harder to deliver reliably than others. Therefore, use the metric’s prescribed values and permitted options, supported by the correct habitat and intervention choice.

Time to target condition

Future value is adjusted for the time needed to reach the target. For example, delayed implementation can matter. Any claim for habitat delivered in advance needs the appropriate evidence and method.

Spatial risk for off-site delivery

The gain site’s relationship to the development affects the value recognised for the project. Apply the appropriate location rules; raw units offered by a provider are not always the same as effective units received.

Realistic ecological targets

Target habitat and condition must fit the soils, hydrology, land use and management commitment. Accordingly, support the target with a practical delivery specification and realistic management resources.

Retained habitat still contributes to post-development value. However, retaining existing value is not the same as creating an uplift. Equally, enhancement should not be recorded as if the whole resulting habitat value were new gain.

FOLLOW THE UNITS

Worked example: retention, enhancement and creation

This invented one-hectare site shows how the area-habitat account works. It starts as modified grassland in poor condition. Assume a distinctiveness score of 2 and strategic significance of 1 throughout. Habitat works start without delay. There are no hedgerows, watercourses, individual trees or irreplaceable habitats in this teaching case.

Baseline: 1.00 ha × 2 × 1 × 1 = 2.0000 area habitat units. At a 10% target, the required post-development value is 2.2000 units. The proposal keeps 0.20 ha, enhances 0.50 ha, creates 0.10 ha of grassland and seals 0.20 ha.

EXAMPLE M01 · ONE CONSISTENT PARCEL RECORD

One hectare. Four interventions.

Read the area, calculation and result together. The baseline and proposed plans must reconcile to the same site extent.

Area-habitat account: worked values rounded to four decimal places
Parcel and actionCalculation to followPost-development units
R01 · Retain
0.20 ha · poor condition
0.20 × 2 × 1 × 1. The existing habitat and condition continue.0.4000
Existing value carried forward
E01 · Enhance
0.50 ha · poor → moderate
Baseline portion: 0.50 × 2 × 1 = 1.0000.
Target before risk: 0.50 × 2 × 2 = 2.0000.
Add the adjusted improvement: 1.0000 + [(2.0000 − 1.0000) × 1 × 0.7002822742].
1.7003
Includes 0.7003 uplift
C01 · Create
0.10 ha · moderate condition
0.10 × 2 × 2 × 1 × 1 × 0.8671800006. A new grassland parcel follows clearance and suitable establishment works.0.3469
Value after delivery risk
D01 · Developed land
0.20 ha · sealed surface
Record the developed land; its zero distinctiveness produces zero area habitat units.0.0000
Area remains accounted for
BASELINE2.0000
PROPOSED TOTAL2.4472
AREA-HABITAT CHANGE+22.36%

Why are the two time factors different?

For this habitat, the workbook assigns four years to create moderate-condition modified grassland, but ten years to enhance poor to moderate condition. Both difficulty factors are 1. These are the prescribed lookup values for the stated interventions. The target also needs a credible management specification.

The creation calculation discounts the created value. In this enhancement example, the existing 1.0000 units remain and the improvement is discounted. Therefore, adding the full 1.7003 as a new gain would count the baseline twice.

The proposal loses 0.30 ha of its original grassland, worth 0.6000 units. Enhancement adds 0.7003 and creation adds 0.3469. Together, those changes replace the lost units and add 0.4472 units. This same-habitat example provides enough replacement value for its low-distinctiveness loss. Confirm the actual trading-summary result in the completed workbook.

Trace the example into the workbook

In A-1, record the 1.00 ha baseline, with 0.20 ha retained and 0.50 ha enhanced. The remaining 0.30 ha is lost. A-3 then holds the 0.50 ha enhancement. In A-2, enter the 0.10 ha created grassland and 0.20 ha developed surface. Keep R01, E01, C01 and D01 on the proposed plan and evidence register.

Original ACP learning example, checked against statutory workbook 1.0.4: A-1, A-2, A-3 and lookup sheets G-1, G-3, G-4, G-5 and G-8. Values shown are rounded; calculations retain precision. The official workbook applies the complete rules to a real assessment. Source data: Defra, Crown copyright, Open Government Licence v3.0, subject to the source’s third-party rights.

What changes when habitat delivery starts later?

Keep example M01’s areas and target conditions fixed. Now delay both enhancement and creation. The existing retained value stays at 0.4000, while the forecast improvement receives a lower time multiplier.

Delivery timing sensitivity for example M01
Start of habitat worksPost-development unitsGain over 2.0000 baseline
No delay2.447222.36%
Two-year delay2.375118.76%
Five-year delay2.276313.81%

The same drawing can therefore produce a different result when the programme changes. Agree the habitat works programme with the delivery team, then update the delay inputs and management plan together.

For off-site supply, also distinguish the gain site’s unit uplift from the value recognised for the development. If an otherwise applicable gain of 4.0000 units receives a 0.75 spatial multiplier, it contributes 3.0000 units. Check location eligibility and habitat trading alongside that arithmetic.

Trading rules matter as much as the percentage

The trading rules govern which habitat gains can compensate for particular losses up to no net loss. They depend on the lost habitat’s type and distinctiveness, and differ between modules. A headline gain above 10% can therefore coexist with an unresolved trading problem.

For example, high-distinctiveness area-habitat losses normally require replacement area units of the same habitat type. Medium-distinctiveness area losses can be replaced within the same broad habitat type at medium distinctiveness, or with a higher-distinctiveness habitat. Do not apply those area rules indiscriminately to hedgerows or watercourses.

Once trading requirements are met, the additional gain can come from other habitats within the relevant module. However, this does not allow units to cross between area, hedgerow and watercourse accounts.

Irreplaceable habitats and rule 4 need separate attention

Irreplaceable habitat is subject to bespoke treatment and stringent protections; ordinary unit arithmetic should not be used to suggest it is routinely replaceable.

Rule 4 concerns exceptional ecological circumstances, such as qualifying large-scale restoration. However, it is not a general waiver for inconvenient results. Engage the relevant decision maker, document the ecological case and follow the guide’s conditions; the biodiversity gain objective still has to be met.

Metric results sense-checker

Compare baseline units with the recognised post-development value for each relevant unit type. Enter values from the official metric after its adjustments, including allocated off-site gains or statutory-credit contributions where applicable. Use the value recognised for the development after relevant spatial and other adjustments.

This tool checks the arithmetic in selected metric outputs and highlights unresolved trading information. Then confirm the applicable target, include each relevant unit type and review the result alongside the official workbook and supporting evidence.

Review each unit account

10% is the statutory minimum. Enter a higher target where supported by the applicable project requirement.

Area habitat units
Hedgerow units
Watercourse units

Values stay in your browser. Results are shown to four decimal places; very small differences need checking against the full-precision official workbook.

Review the workbook in a sensible order

01

Confirm the scope

First, check statutory applicability, the correct metric method, relevant date and site boundary. Account for habitat degradation and irreplaceable habitats where applicable.

02

Reconcile the baseline

Next, check each habitat parcel against the survey, condition record and map. Include retained as well as affected habitats within the assessment boundary.

03

Review proposed interventions

Then align habitat retention, creation and enhancement with the current design. Check target conditions, timing, management feasibility and off-site treatment.

04

Resolve the results

Finally, read warnings and trading summaries for each unit type. Explain changes between revisions and check that the final evidence supports the reported outcome.

For eligible small projects, the Small Sites Metric offers a simplified method with its own restrictions and fixed baseline condition values. Confirm eligibility before choosing that method.

For calculation or review support, see our statutory metric service. Legal applicability and transitional rules are covered separately in our BNG legislation guide.

Turn a warning into a specific correction

GEOMETRY

The areas do not reconcile

Compare the site boundary, parcel schedule and A-1 totals. Separate retained, enhanced and lost areas. Check overlapping polygons and square-metre-to-hectare conversion before changing a result.

INPUTS

A condition choice is unavailable

Check the selected habitat, its permitted condition choices and the survey sheet. If a habitat selection changed, revisit the dependent inputs and explain the correction in the comments.

RESULTS

The percentage passes but trading fails

Open the relevant trading summary. Identify the lost habitat and required replacement category. Then revise that part of the design or source a suitable off-site allocation.

DELIVERY

The target lacks supporting detail

Link the parcel to establishment works, condition criteria, monitoring dates, remedial actions and a responsible manager. Use our HMMP guidance to connect the forecast with delivery.

A useful review note records the issue, parcel, evidence checked, decision, reviewer and revision date. This gives the next reviewer a clear route from the map to the calculation and management commitment.

Connect predicted gains with ecological outcomes

The calculation predicts habitat value using recorded inputs and prescribed rules. In addition, delivery needs a practical management programme, monitoring and any species-focused assessment required for the site.

Marshall and colleagues (2024) compared baseline metric units with species measures across 24 sites. Units correlated with most plant measures, but not the bird or butterfly measures studied. The findings concern baseline relationships at those sites, with that specific study scope.

Therefore, the practical response is to retain appropriate species evidence, realistic habitat management and monitoring alongside the metric. Distinguish a projected gain from a measured outcome, and keep the evidence needed to review both.

BNG metric questions

Practical answers on biodiversity units, trading, retained habitat and interpreting the results.

What is the difference between a habitat unit and a hectare?

A hectare measures area. An area biodiversity unit combines habitat size with other metric inputs. Equal areas can therefore have different unit values. Hedgerow and watercourse units are separate accounts based on their respective methods.

Can I add area, hedgerow and watercourse units together?

No. Metric rule 2 prohibits adding, trading or converting units between those types. Check the required gain and trading outcome for each relevant account.

Does more than 10% on the headline result mean the assessment passes?

Not by itself. Trading requirements, all relevant unit types, input accuracy, warnings and delivery evidence still matter. Other planning and ecological requirements are outside that single percentage.

Does retaining habitat count towards BNG?

Retained habitat contributes to post-development habitat value. However, retaining the baseline value does not itself create an uplift. The workbook distinguishes retention from enhancement and creation.

Can the Small Sites Metric use off-site units?

Yes, if the project is eligible for the SSM. The SSM has no off-site section, so follow Defra’s requirements for the completed SSM, off-site evidence, trading and Biodiversity Gain Plan.

Is strategic significance always 1.15 in an LNRS area?

No. Under the current published-LNRS approach, baseline significance is low. A high post-development score requires both the mapped location and a consistent proposed intervention. Being within the wider LNRS area is not enough.

Can an online calculator replace the official workbook?

No. The statutory calculation tool or eligible SSM is required to apply the metric formula for mandatory BNG. Our checker helps interpret selected outputs; it does not generate a statutory calculation or validate the ecological inputs.

Can a zero baseline be expressed as a percentage gain?

A percentage change cannot be calculated by dividing by zero. Record the actual units, confirm the module’s scope and follow the official workbook’s treatment. The checker flags this case rather than inventing a percentage.

Understand your metric

Your habitat.A clear calculation.

Tell us about your site and where you need help with the biodiversity metric.

  1. Your site

    Share the location, boundary and habitats already identified.

  2. Your calculation

    Mention the workbook version, unit results or warnings you need to resolve.

  3. Your next step

    Tell us the planning stage and the advice or review you need.