Start with the right area
Select a planning authority, then click your site on the map. Read the authority and LNRS result cards together: their boundaries serve different purposes.
Habitat evidence · Spatial accuracy
A clear map.
A traceable calculation.
Connect habitat surveys, mapped parcels and the statutory biodiversity metric through one controlled dataset.
Learn what QGIS and ArcGIS can do, where errors arise and how to check the numbers before handing them into the metric.
England BNG guidance · Sources checked 1 November 2026
A practical starting point · Free indicative GIS tool
Explore open environmental layers, draw habitat parcels and connect each feature to its evidence. Compare baseline and proposed plans, check parcel geometry and export a clear A3 or A4 map with its legend, schedule and sources.
The interactive map loads when you open it. Use the guide below to work through your first map.
Select a planning authority, then click your site on the map. Read the authority and LNRS result cards together: their boundaries serve different purposes.
Choose the relevant open layers, zoom to the site and inspect source records. Then draw or import habitat parcels and add survey dates, labels and supporting evidence.
Review baseline and proposed scenarios, run the parcel checks and inspect the automatic legend. Save an editable project, then export a map with its schedule, source credits and review notes.
Use the habitat workspace to organise mapped parcels, target notes and evidence. Export GeoJSON and the parcel schedule to continue in QGIS, ArcGIS or your project workflow. The current statutory metric provides the framework for biodiversity unit calculations.
For sites spanning authority or strategy boundaries, identify points in each part and review all relevant policies. The linked strategy websites provide the detailed local priorities and measures behind the national LNRS overview.
A Geographic Information System connects habitat locations to their survey records and measurements. For BNG, it helps an ecologist map the baseline, compare design scenarios and produce clear plans that can be reconciled with the statutory biodiversity metric.
GIS manages the spatial record; the statutory metric applies the biodiversity accounting rules. A reliable handover connects both to the habitat classification, condition evidence and proposed management for each parcel.
From habitat survey to metric handover
Both plans use the same example geometry. Here, the PEA view highlights habitats and target notes. The BNG view identifies measured parcels and hedgerows for the assessment record.
01 / Ecological context
Target notes. 01 Pond-edge vegetation; 02 woodland-edge transition; 03 hedgerow structure. Each reference links to field observations and follow-up actions.
02 / Measured parcel record
Separate records. H01 86.0 m; H02 128.6 m. Habitat areas and hedgerow lengths remain separate in the metric handover.
Follow the reference
For the complete assessment route, see our BNG assessment and UKHab baseline guide.
Both can support habitat mapping. The useful choice depends on the team’s skills, data arrangements and ability to maintain a repeatable checking process. Prioritise an evidence trail that the project team and planning authority can review.
| Decision | QGISOpen-source desktop GIS | ArcGISLicensed GIS platform |
|---|---|---|
| 01Access | Free, open-source desktop GIS for Windows, macOS and Linux. | Consider the licences and services already available to your organisation. |
| 02Core mapping work | Digitising, attributes, measurement, layouts and geometry checks. | Feature editing, attribute management, geometry calculations and map production. |
| 03Project setup | Record project settings, source layers, field definitions and any plugins used. | Record coordinate settings, geodatabase fields, processing steps and dependencies. |
| 04Handover priority | Keep the project and linked datasets together with clear revision notes. | Agree an editable exchange format and retain the originating data structure. |
Start with the official QGIS resources or the relevant Esri documentation. Check the installed software version when following a menu-based tutorial. Project display settings and the settings used to calculate attributes are not always the same.
Confirm the red line, relevant offsite land, survey coverage and baseline date. Record the source and revision of supplied boundaries. Resolve discrepancies between title, planning and design information before digitising habitats.
Use field observations and the appropriate habitat classification. Aerial imagery can guide preparation, but ambiguous habitat boundaries, condition and seasonal limitations need ecological review.
Give each parcel an ID and keep area habitats, hedgerows and watercourses identifiable. Record how parcels split or merge between revisions. Use a new reference when the identity of a parcel changes.
Check invalid shapes, accidental overlaps, gaps and duplicate features. Then check habitat names, condition evidence, dates and measurement units. Review habitat labels against the field evidence as a separate ecological check.
Keep the surveyed baseline distinct from the proposed layout. Explain which parcels are retained, lost, enhanced or created. A revised landscape drawing should trigger a review of the mapped change and metric entries.
Reconcile the maps, attribute export, metric and report before issue. Check that an independent reviewer can follow a parcel from its evidence to the relevant calculation and proposed management.
See our BNG survey guidance for evidence collection and habitat condition assessment guide for the condition record behind the map.
Use a suitable coordinate reference system and an explicit measurement method. British National Grid is a familiar projected system for Great Britain, but choosing a project CRS alone does not settle every measurement setting.
QGIS measurements can depend on the project’s ellipsoid and measurement configuration. ArcGIS geometry calculations expose coordinate-system and unit choices, with separate geodesic options. Check the method used to populate your stored attributes, then retain that setting in the handover.
Keep sufficient precision during calculations. Round presentation values only after checking totals and the target workbook’s input requirements. A neat rounded total can conceal a meaningful discrepancy between source records.
The QGIS attribute-table guide explains the calculator, selections and virtual fields. Record the software version with your project.
A polygon may pass a geometry check while tracing an outdated fence or including land outside the intended parcel. Review the drawing against the survey and agreed boundary, not just the software’s error count.
Unexpected slivers or overlaps between adjacent area parcels can distort totals. However, separate habitat layers may legitimately occupy the same location. Apply the metric’s specific treatment of individual trees and linear habitats rather than deleting every spatial overlap.
A missing patch and an overlapping patch can cancel numerically. A matching area total therefore does not prove complete coverage. Compare the actual geometry and investigate the reason for every adjustment.
The QGIS geometry checker documents available validity and topology checks. Configure tolerances deliberately and review repairs on a copy before replacing the issued dataset.
Paste a CSV register to check parcel IDs, required fields, units and measurement totals. Use one scenario at a time. Review the resulting data checks alongside the mapped geometry, ecological evidence and statutory metric.
Required columns: id, type, quantity, unit, condition, evidence
Use type area, hedgerow or watercourse. Use m2 or ha for area; m or km for length. Include a condition record, or an explained “not required” entry where appropriate. Maximum 200 records. Values need a decimal point and no thousands separators.
Compare like-for-like area coverage only. Exclude separate tree-equivalent areas from this simple boundary check. Tolerance is a review setting, not a statutory allowance.
The checker processes your pasted data in this browser. It does not upload it to ACP or save a project.
Remote sensing can help identify broad habitat patterns, plan fieldwork and monitor visible change. Its suitability depends on the habitat, image resolution, survey timing and the ecological question.
For a repeat survey, retain imagery dates, processing methods and classification assumptions. A change in season, resolution or model can produce an apparent habitat change even where the ecological situation has not changed in the same way.
Include the agreed GIS exchange files and a clearly labelled PDF plan. Show scale, north direction, boundary, habitat legend, parcel IDs, survey date and drawing revision. Retain basemap attribution and check redistribution rights.
Define field names, units and permitted values. Explain the coordinate reference system, measurement method, evidence references and any fields derived through processing.
Identify how each parcel relates to the relevant metric entry. Where records are combined or split, preserve the relationship and follow the current metric guidance rather than losing the underlying detail.
Record checks completed, unresolved limitations and the person responsible for each action. Preserve the previous issued version so that later reviewers can distinguish habitat change from a data correction.
Agree the project fields below before survey data and design revisions start to accumulate. Then map them to Natural England’s data standard and the receiving authority’s required structure.
| Record group | Example fields | Review question |
|---|---|---|
| Identity and revision | Parcel ID, scenario, revision, previous parcel reference. | Can a split or merged parcel be traced back to the issued baseline? |
| Ecological evidence | Survey habitat code, metric category, condition evidence reference, survey date, assessor. | Do the selected habitat and condition follow the field record? |
| Measurement | Source area or length, unit, calculated value, CRS, measurement method. | Was the stored value recalculated after the latest geometry change? |
| Proposed outcome | Retain, lose, enhance or create; target habitat and condition; delivery reference. | Does the proposal agree with the design, metric and management plan? |
| Strategy and sources | Relevant strategy evidence, source dataset, release date, licence and attribution. | Can the reviewer trace the strategic-significance decision and reuse the supplied data? |
| Quality control | Geometry check, evidence gaps, reviewer, action owner, issue date. | Are unresolved matters visible in the handover record? |
For watercourses, agree the mapped reach and bank-side evidence with the river condition assessment specialist. A drainage engineer can supply the relevant channel and outfall design information. Keep those inputs connected to the ecological record.
Local submission requirements can specify the editable GIS package as well as the PDF plans. For example, Stockport Council’s data guidance requests a package following Natural England’s structure, including the project, associated folders and GeoPackage.
Confirm your receiving authority’s current format, naming and submission route before issuing the final files. Local requirements determine the appropriate package.
For the statutory calculation, see our statutory biodiversity metric service. Our biodiversity-unit calculation guide explains why mapped extent is only one input to the result.
Practical answers on habitat mapping, measurement settings and a reliable GIS handover.
The full statutory metric uses hectares for area habitats and kilometres for linear habitats. The Small Sites Metric uses square metres and metres. Keep the source measurement, conversion and target input unit recorded together, and check the workbook headings before transferring data.
QGIS can produce supporting habitat plans and measurements. Acceptance depends on the quality and suitability of the evidence, not a particular software brand. The statutory metric and relevant planning requirements still apply.
Only rely on a documented workflow that supports the specific workbook and fields being used. Verify the exported records, units and final calculations. Do not assume an older import template remains compatible.
Check the geometry, coordinate reference system, planar or geodesic method, ellipsoid settings, selected features and rounding. Also check whether stored area attributes were recalculated after the latest edit.
Imagery can inform some observations, but many condition criteria require field evidence and ecological expertise. Use the relevant condition sheet and record the basis for each assessment.
Retain the surveyed habitat classification, then confirm the appropriate metric habitat category. Keep an explicit cross-reference where labels differ. Confirm that the ecological characteristics support the selected category.
No. Compensating errors can produce the same total. Review parcel geometry, boundaries, habitat evidence and the relationships between layers as well as the arithmetic.
It checks the stated CSV structure, duplicate IDs, supported measurement units, positive quantities and populated condition/evidence fields. It totals measurements by category and optionally compares area coverage. Complete the review by checking geometry and the underlying ecological evidence in the source files.
ACP can scope a review of the supplied files and supporting ecology evidence. Send the editable data where available, the current plan and metric, survey records and the specific council or project-team question.
Yes. Open the map workspace, choose the view and layers, and add your boundary, title and revision. Select the paper size and prepare the sheet. Download the PDF directly or use the browser’s Print menu. The sheet includes a scale bar, north arrow, legend and source credits. Use the surveyed habitat plan and agreed GIS measurements for the final BNG submission.
The national overview shows the 48 strategy areas and identifies the responsible authority at your selected point. Open the linked strategy website for its detailed habitat priorities, mapped measures and supporting information. Review those documents alongside the planning authority’s current BNG policy and validation requirements.
Yes. Add named points using the map or WGS84 coordinates, then enter up to five buffer radii in metres. You can create rings around one point or up to 20 points together. The workspace calculates each radius on the WGS84 ellipsoid. Select distances that suit the relevant ecological question and guidance.
Import CSV point tables or WGS84 GeoJSON containing points, lines and polygons. Each file can contain up to 500 features within a 2 MB limit. Save an ACP project file to reopen your named layers and styles. You can also export the project geometry as GeoJSON for your GIS. Uploads are processed by ACP and returned to the session without retaining the file.
The QR code opens ACP’s public BNG mapping page. It contains the tool’s website address. Project geometry, point coordinates, author details and uploaded files stay outside the QR code. PDF exports include a clickable website link and separate Prepared by details.
Map your habitat evidence
Share the site boundary, survey records and latest design. We can scope the habitat mapping and evidence checks needed for a coordinated metric handover.
Tell us the location, planning stage and which boundary or design revision your mapping needs to follow.
Outline the habitat surveys, GIS files and metric records already available, including any gaps or conflicting measurements.
Explain the review, submission or design question so we can identify the relevant mapping and ecological inputs.
For other enquiries, visit our contact page.
Sources checked 1 November 2026. England scope unless stated otherwise.