The statutory biodiversity metric user guide explains how to apply the metric. The Small Sites Metric has its own guide and eligibility rules.

Use this guide to find the official downloads, follow the workbook steps and practise entering a complete habitat example.

England guidance · Sources checked 11 November 2026

Download the current official BNG user guides

Start at the Defra tools and guides collection. It holds the authoritative calculation tools, both user guides, condition sheets and version information. For reference, the links below identify the editions available when this page was checked.

Detailed statutory metric

User guide · November 2026

For the detailed metric’s rules, habitat inputs, risk adjustments, watercourses and results. Includes an appendix on workbook use and troubleshooting.

Open the detailed user guide (PDF)
Simplified statutory method

Small Sites guide · July 2025

For projects that meet the Small Sites Metric’s eligibility conditions. Also read its assessment method alongside the SSM workbook.

Open the Small Sites user guide (PDF)
Calculation and field evidence

Workbooks and condition sheets

The collection provides macro-enabled and macro-disabled calculation options, the SSM and the condition-assessment workbook.

Choose the official tools and sheets
Changes and compatibility

Version history

Check which document changed and why. A guide update is not automatically a new calculation method or a new statutory requirement.

Read the official change record

Defra identifies accessibility limitations for some downloads and provides instructions for requesting an accessible format. Therefore, use the collection page for those details and for any later replacement links.

START THE PRACTICE EXERCISE

Open the official calculation workbook

The illustrated exercise was checked against full statutory metric version 1.0.4. The download provides Defra’s current version 1.1.1 workbook. Keep the November 2026 user guide alongside it and record the version used for your project.

Download current workbook · XLSX, 5.38 MB →

Which document does what?

The BNG user guide explains the assessment method. Field evidence supports the inputs, the workbook calculates the result, and the planning documents explain how the project will deliver it.

From observation to decision

One calculation. Three connected records.

01 · Evidence

What is there?

Habitat map, parcel IDs, survey information and the condition evidence required by the chosen method.

Supports the inputs
02 · Method

How is it assessed?

The appropriate user guide explains classifications, project actions, trading rules and assumptions.

Explains the decisions
03 · Workbook

What is the result?

The statutory calculation tool records inputs and produces outputs for review alongside the plans.

Calculates the units
Then: the planning recordUse the relevant report, Biodiversity Gain Plan and delivery documents for the project stage.
All records should describe the same site, design revision and habitat parcels. Use this information flow to organise the evidence supporting the official method.
ACP ConsultantsOriginal illustration / decision aid · © 2026 ACP Consultants

JP039 and JP058 are different resources

Natural England’s JP039 supporting-documents page hosts additional resources, including GIS tools and case studies. Also use these resources alongside the statutory metric.

JP058 contains habitat management and monitoring plan templates and related support. In practice, use this collection to develop the management and monitoring record. Defra’s separate user guide supports the calculation method.

A reading map for the detailed user guide

For a specific question, begin with a focused reading route. Start with the relevant section, then follow its definitions and cross-references. Page numbers below refer to the printed page numbers in the November 2026 detailed guide.

Where to look — detailed statutory metric user guide, November 2026
Your questionStart hereCheck alongside it
Which rules must the calculation satisfy?Section 3, page 15: rules, trading and principles.Irreplaceable habitat and bespoke compensation provisions where relevant.
How should baseline inputs be justified?Section 4, page 26: habitat quality inputs.Habitat classification, condition sheets and strategic-significance evidence.
Is habitat retained, enhanced or created?Section 5, page 33: project actions.Baseline and proposed plans using matching parcel references.
Why are predicted units discounted?Section 6, page 36: risk multipliers.Target condition, establishment time, delivery difficulty and off-site location.
What changes for a watercourse?Section 7, page 41: watercourse habitats.Classification, condition method, riparian zone and encroachment.
What about gardens, trees or degraded land?Section 8, page 56: specific assessment notes.The relevant habitat-specific subsection and the evidence for site history.
Is the workbook ready to submit?Section 9, page 70: results and submission.Trading summaries, warnings, detailed results and planning-stage requirements.
How do the workbook controls work?Appendix A, page 75; troubleshooting begins on page 87.The workbook edition and official version history.

For the underlying calculation concepts, use our BNG metric explainer. For worked arithmetic, see how to calculate biodiversity units. The walkthrough below connects that guidance with the workbook inputs.

FROM GUIDANCE TO INPUTS

How to fill in the statutory biodiversity metric workbook

First, prepare the habitat survey, condition records, baseline plan and proposed layout before entering data. Then give each parcel a stable reference. A clear input record makes the calculation easier to review and revise.

01

Complete Start and identify the assessment

Enter the planning authority, project name, applicant and application type. Also add the planning reference when available, the assessor’s name and completion date. Finally, check the project details again when a design scenario becomes a submission.

Use a clear file name, such as M01_metric_R1_2026-11-01.xlsx. Alongside it, record the workbook edition and matching drawing revision in your project register.

02

Use the correct module and measurement units

Area habitats use hectares in the detailed metric. Hedgerows and watercourses use kilometres. For example, 2,500 m² becomes 0.25 ha, while 180 m becomes 0.18 km. Also keep the original measurements in the parcel schedule.

However, the Small Sites Metric uses different input units and its own method. Therefore, read the label beside each field before transferring survey or GIS data.

03

Build the baseline before the proposal

In A-1, select the broad habitat and habitat type, then enter area, condition and strategic significance. Then complete the applicable irreplaceable-habitat field. Also add a habitat reference and use the comments to point to the survey, condition sheet and plan.

For each baseline parcel, allocate the retained and enhanced area. As a result, the remaining area is treated as lost. Use B-1 for hedgerows and C-1 for watercourses, with the relevant linear-habitat evidence.

04

Describe creation and enhancement separately

A-2 records created area habitats. A-3 receives the baseline habitat selected for enhancement, then records its proposed outcome. Next, enter the target habitat and condition, supported by the design and management specification.

Check advance or delay assumptions against the programme. In turn, the workbook applies the prescribed time and difficulty values. After inserting or changing baseline rows, check that each enhancement still matches the intended parcel.

05

Add each off-site gain site consistently

Use D, E and F for off-site area, hedgerow and watercourse records respectively. Next, record the gain site’s baseline and interventions, its reference and the applicable spatial-risk category. For clarity, keep separate references where the required spatial treatment differs.

Reconcile the proposed allocation with the gain-site documents and the development’s remaining requirement. Then check the recognised contribution in the results.

06

Read all the relevant result sheets

Headline Results gives the overall changes by unit type. Meanwhile, Detailed Results helps reconcile habitat changes. The trading summaries test replacement requirements; the off-site summary explains gain-site contributions.

Also review the irreplaceable-habitat and credit summaries where relevant. Finally, clear unexplained warnings and record how the final workbook matches the submitted plans.

Workbook layout checked against the official macro-disabled version 1.0.4. In practice, use the editable input cells and dropdowns; retain its formulae and lookup sheets. Appendix A of the detailed user guide explains the controls and troubleshooting.

Workbook sheet families: choose the habitat account and intervention
Habitat accountOn-site sheetsOff-site sheets
Area habitatsA-1 baseline · A-2 creation · A-3 enhancementD-1 baseline · D-2 creation · D-3 enhancement
HedgerowsB-1 baseline · B-2 creation · B-3 enhancementE-1 baseline · E-2 creation · E-3 enhancement
WatercoursesC-1 baseline · C-2 creation · C-3 enhancementF-1 baseline · F-2 creation · F-3 enhancement

GUIDED PRACTICE · EXAMPLE M01

Try a complete area-habitat input exercise

Use an invented one-hectare site, initially modified grassland in poor condition. First, split it into four parcels on the baseline plan. Assume strategic significance of 1, no advance or delay, and no other habitat modules or special features. The companion metric example explains the formulae behind the results.

A-1
BASELINE INPUTS

Enter the existing habitat and its proposed fate

For every row, choose Grassland → Modified grassland and poor condition. Then confirm the applicable non-irreplaceable category. Use the low strategic-significance option supported by the example’s assumptions.

All areas are hectares; all four rows describe the existing grassland
Habitat referenceBaseline areaArea retainedArea enhanced
R01 · retained parcel0.200.200.00
E01 · enhancement parcel0.500.000.50
C01 · cleared and recreated0.100.000.00
D01 · developed parcel0.200.000.00
Checkpoint

Total baseline area: 1.00 ha. Baseline units: 2.0000. Retained area: 0.20 ha. Enhanced area: 0.50 ha. Lost area: 0.30 ha.

A-3
ENHANCEMENT INPUTS

Improve parcel E01

Check the carried-through baseline is E01, 0.50 ha of poor-condition modified grassland. Then keep the proposed habitat as modified grassland and choose moderate target condition.

Strategic significance
1 in this example
Advance / delay
None
Expected standard time
10 years
Expected difficulty factor
1

Expected parcel value: 1.7003 units. Specifically, this includes the original 1.0000 units and the adjusted enhancement uplift.

A-2
CREATION INPUTS

Record C01 and D01

Enter C01 as 0.10 ha of created modified grassland in moderate condition. Also use strategic significance 1 with no advance or delay.

Expected standard time
4 years
Expected difficulty factor
1
Expected C01 value
0.3469 units
D01 developed surface
0.20 ha · zero units

Choose the developed land; sealed surface category for D01 and its applicable condition option. Finally, keep both areas on the proposed plan.

RECONCILE THE RESULTS

2.4472 post-development units · 22.36% gain

The total combines retained R01, enhanced E01, created C01 and zero-value D01. Also review the area-habitat trading summary alongside the headline result.

The complete figures are 2.4471542744 units and 22.35771372% gain before display rounding. If your result differs, check habitat, condition, area, significance and timing in that order.

As a second exercise, enter a two-year delay for C01 and E01. As a result, the total should reduce to approximately 2.3751 units, or 18.76% gain. This makes the programme’s effect visible without changing the proposed habitat areas.

Original ACP learning exercise using verified statutory workbook values. It illustrates data entry for the stated assumptions. The published official workbook and a competent assessment establish the project-specific calculation.

Choose the right BNG metric user guide and version

Metric 4.0 is not the statutory metric

For mandatory BNG, use a statutory biodiversity metric tool. Defra states that calculations made in Metric 4.0 or earlier will not be accepted for mandatory BNG planning applications. Its guidance explains transferring earlier work into the statutory tool.

First, retain the earlier file and record its version. Next, transfer its inputs into the statutory workbook and check the calculation. However, historical calculations may still be relevant evidence for a project governed by different requirements.

An older statutory edition is a different question

Defra’s collection states that any version of the statutory metric tools can be used for BNG calculations. Therefore, an older statutory workbook is not automatically equivalent to the superseded pre-statutory Metric 4.0.

For new work, start from the current official collection. For existing work, identify the exact edition, read the change history and review any issue affecting your inputs or interpretation. Finally, record the decision and retain the submitted calculation.

What the November 2026 guide update covers

The November update clarifies watercourse spatial risk where an impact site spans multiple waterbody catchments. It follows the June changes covering NSIPs, rule 4 and larger projects. Review the changes relevant to your site, then record the guide and workbook versions used.

Keep legal commencement and exemption questions separate from the document date. The BNG legislation guide covers that wider context.

Detailed metric or Small Sites Metric?

The SSM is a simplified statutory method for eligible projects, with its own guide and workbook. However, small development size alone does not establish eligibility. Therefore, check the habitat, protected-site and species conditions in the current guidance.

Its baseline condition values are fixed, so a detailed-metric condition survey should not be inserted into those defaults. By comparison, the detailed metric uses habitat-specific assessment where condition is required. Our condition-assessment guide explains that distinction.

An eligible SSM project can use off-site units even though the SSM does not contain an off-site section. Follow the official handover and trading-rule guidance; do not assume that needing off-site units alone makes the SSM unavailable. Seek a Small Sites Metric review if eligibility or evidence is uncertain.

Find your reading route

Select your method, question and project stage. Then the navigator gives a short reading list and the evidence to check next. Detailed-guide page references are not applied to the separate Small Sites guide.

Your guidance question

Use the suggested reading alongside your project evidence and confirmed metric eligibility. Your choices stay in your browser.

Turn guidance into a traceable handover

A reviewer should be able to connect the calculation to its evidence without reconstructing the project. Therefore, use consistent document references and make changes visible.

01

Identify the method and edition

Record the workbook version, guide date, assessor and calculation date. Also explain eligibility if using the SSM and identify any specialist assessment inputs.

02

Match the maps and parcels

Use the same boundary, IDs and design revision in the baseline plan, proposed plan, supporting evidence and workbook. Then reconcile areas and linear measurements.

03

Explain assumptions and warnings

Support target conditions, timing and strategic significance. Also review warnings and habitat trading results alongside the headline percentage.

04

Record the stage and decision

Distinguish an early design scenario from a planning submission, an approved gain plan or a monitoring update. In addition, keep a change log and preserve the submitted version.

In addition, local validation lists can specify supporting information and file formats. Therefore, read their dates and check current national guidance where wording appears inconsistent. The application evidence and the post-permission Biodiversity Gain Plan are separate stages; the user guide alone does not settle every submission requirement.

Why the delivery record matters

Thornhill and colleagues (2025) examined 44 residential developments under earlier planning policies. In particular, they found gaps between approved biodiversity measures and implementation. Therefore, interpret its findings in the context of those earlier policies.

It supports a practical lesson: carry the agreed habitat specification, responsibilities and monitoring requirements from assessment into delivery.

Use the Biodiversity Gain Plan guide to assemble the post-permission submission around the final calculation and delivery evidence.

Write a useful parcel comment

ILLUSTRATIVE COMMENT · E01

“E01: baseline and proposed plans M01-R1; condition record E01-R1; management specification section 4. Target moderate condition. No delivery delay assumed in programme R1. Confirm condition targets and delivery dates at detailed design.”

Use document names that exist in the project pack, with the relevant revision and section. In addition, record unresolved assumptions as actions with an owner. When a plan changes, revisit every affected parcel and its linked calculation.

Coordinate watercourse and other specialist evidence

For a watercourse, first establish its classification and assessment method. A qualified RCA assessor supplies river-condition evidence where required. Meanwhile, ditches use their applicable condition sheets. Also include hydrology, geomorphology, drainage or engineering advice when the proposed works raise those questions.

Our river condition assessment guide explains that specialist input. The metric reviewer then reconciles the findings with the mapped sections, proposed works and relevant workbook entries.

When to seek technical help

Seek advice where habitat classification is uncertain, evidence is incomplete, a warning cannot be explained, or a proposed intervention is outside your competence. For example, watercourses, irreplaceable habitats, complex mosaics and unusual enhancement proposals may need specialist input.

Prepare a focused query: identify the parcel, workbook edition, relevant guide section, observed issue and decision needed. Then remove unrelated information and retain an unchanged copy of the file before reviewing possible corrections.

Our statutory metric service can support project-specific review. For document starting points, visit BNG templates and resources.

BNG user-guide questions

Find the right guide, understand version changes and prepare the supporting evidence.

Where is the latest statutory biodiversity metric user guide?

Defra’s tools and guides collection is the primary source. At the review date, the detailed guide is November 2026 and the Small Sites guide is July 2025. Check the collection for later revisions before starting new work.

Can I still use the Biodiversity Metric 4.0 user guide?

It can help interpret historical work, but it is not the current guide for mandatory BNG. Use the statutory metric documents and the official transfer guidance where calculations began in Metric 4.0 or an earlier version.

Does a guide update invalidate an existing statutory workbook?

Not automatically. Defra permits any statutory metric tool version. Identify the edition and review the official change history for matters relevant to your project. Keep the calculation, evidence and submission record consistent.

Is JP058 the statutory metric user guide?

No. JP058 is Natural England’s habitat management and monitoring plan template collection. The statutory metric user guide is published through Defra’s GOV.UK tools and guides collection.

Is the Small Sites Metric guide only a shorter copy?

No. It supports a separate simplified statutory method, including eligibility restrictions and fixed baseline condition values. Use the SSM guide with the SSM workbook, rather than mixing its assumptions with the detailed metric.

Can the guide replace a habitat survey?

No. It explains how to use evidence; it does not establish what exists on your site. The survey and assessment work must be suitable for the habitats, metric method and wider planning requirements.

What should accompany a completed metric workbook?

Provide the matching baseline and proposed habitat plans, parcel references, survey and condition evidence, and a clear record of assumptions. Add the report, Biodiversity Gain Plan, management and monitoring information, and secured delivery evidence required for the project stage. Check the local validation list and current national requirements.

Discuss your metric workbook

Clear inputs.Traceable results.

Share the workbook, parcel records and question you need to resolve. We can scope the ecological input and review needed for a clear, coordinated submission.

  1. Your method and version

    Tell us which metric and workbook edition you are using, together with the site location and planning stage.

  2. Your parcels and evidence

    Outline the plans, survey records and condition evidence available, including any gaps or conflicting inputs.