Biodiversity Net Gain in London

Find the planning authority for your site.

To plan for biodiversity net gain in London, first identify the borough from your site boundary. Then check the London Plan and gather habitat evidence before fixing the layout.

London Plan33 local guidesSite evidence

London planning

Which authority and policies apply?

Start with the national gain condition, then read the London Plan alongside the adopted plan for the site. Together, they explain how much gain you need and which local policies shape its delivery.

01 / England

Does the statutory biodiversity gain condition apply?

Schedule 7A to the Town and Country Planning Act 1990 sets the biodiversity gain objective. For a planning permission within scope, the development must achieve at least 10% gain against the pre-development baseline. Before claiming an exemption, check the date and type of application, the site area, priority habitat and any earlier permission.

First, submit the baseline information with the application and explain how you calculated it. Where the condition applies, the planning authority must approve the Biodiversity Gain Plan before development starts. In addition, phased permissions have specific plan requirements. National planning practice guidance.

For your submission First, mark the red line and record the survey date. Then attach the metric or explain which exemption applies. See our BNG legislation guide.

02 / Greater London

How does the London Plan protect biodiversity?

The adopted 2021 Plan addresses green infrastructure (G1), urban greening (G5), biodiversity and access to nature (G6), and trees and woodlands (G7). For instance, G5 asks major developments to incorporate greening into their design. Where a borough has no locally tailored factor, the Mayor recommends interim Urban Greening Factor targets of 0.4 for predominantly residential development and 0.3 for predominantly commercial development, excluding B2 and B8 uses.

Because G6 protects Sites of Importance for Nature Conservation (SINCs), check the borough’s designations before selecting gains. Also check how the site connects to nearby ecological corridors. A green roof can contribute to the greening calculation, but its BNG value also depends on habitat type, condition and whether the design can deliver it. London Plan 2021, chapter 8.

For your submission For major projects in London, use the same landscape drawing for urban greening and biodiversity net gain. For example, show retained trees, roof substrate, planting areas and management access. Then record the two results separately.

03 / Borough or City

Which London borough or planning authority decides?

Start with the borough containing the site, or the City of London Corporation for the Square Mile. However, in Old Oak and Park Royal, OPDC has planning powers and delegates certain applications to boroughs. If the site lies near that boundary, check the OPDC map first and then its planning register. Referable strategic applications also go to the Mayor. Even so, the borough may still determine the application after referral. OPDC planning applications · Mayor’s referral powers.

Check the adopted borough plan, policies map and current validation list for your application type. For example, Westminster publishes its BNG supporting-document requirements. In Islington, meanwhile, supplementary guidance explains how its local plan applies to proposals near a SINC, including sites within 50 metres. In other words, the 50-metre trigger belongs to Islington’s guidance. Westminster’s application requirements · Islington Climate Action SPD, chapter 4.

For your submission Name the authority, local policy and mapped designation in your brief. Next, identify the document the authority needs. Use the planning validation checklist to check the submission.

04 / Nature recovery

Where would habitat improvements help?

London’s Local Nature Recovery Strategy maps places where particular actions can benefit nature. Therefore, check which action the map recommends for that location. For example, a proposal for a wetland connection needs a credible water supply, space and long-term management. By contrast, a borough-wide greening score tells you little about water supply or management access.

For the statutory metric, record the location, mapped measure and the habitat intervention that delivers it before assigning strategic significance. Also survey the habitat on the ground to establish the baseline. London nature recovery strategy and habitat map.

For your submission Overlay the red line and proposed habitat parcels on the strategy map. Next, keep the map extract and explain the match in the statutory biodiversity metric.

Policy watch · 4 November 2026

What has changed for biodiversity net gain in London?

To find the right rules for BNG in London, start with the application date and consent route. For examples of how authorities have applied them, see London project records. For example, the application date can change both the exemption test and the delivery options.

In force · 6 August 2026

Check small and temporary schemes

For applications made from this date, sites of 0.2 hectares or less can qualify for exemption where development does not impact on-site priority habitat. In addition, a separate exemption covers wholly temporary development permitted for five years or less, subject to the priority-habitat test. However, section 73 variations have transitional rules.

Non-exempt minor schemes can now consider both delivery routes together. In other words, you can assess an off-site option while testing your layout. Check the exemptions guide before choosing a Small Sites Metric. Defra exemptions and transitional rules.

In force · 2–3 November 2026

Use the correct consent route

Nationally significant infrastructure projects with applications submitted from 2 November fall under a separate BNG regime. For a London infrastructure scheme, first identify the consent route. Then use the relevant biodiversity gain statement to scope the evidence.

On 3 November Defra updated the metric tool to version 1.1.0 and clarified spatial risk for watercourses spanning several catchments. NSIP biodiversity gain statements · Defra metric tools and November 2026 user guide.

Emerging · London Plan

Draft GHR6 and London’s biodiversity priorities

The draft plan consultation closed on 15 October 2026. In particular, draft GHR6 connects tree protection, habitat creation and borough designations with the London nature recovery strategy. Next on the GLA timetable is examination in 2027, followed by anticipated adoption in early 2028.

For a long-running application, identify any relevant draft provision separately and recheck its status at determination. Meanwhile, the adopted 2021 Plan remains the starting point. Draft London Plan, chapter 5 · GLA consultation and timetable.

Units and statutory credits

Where can a London project secure off-site gains?

First, identify which type of unit is missing. For instance, a hedgerow deficit needs hedgerow evidence, even if the scheme has a surplus of area units. Next, apply the metric’s trading rules to identify suitable replacement habitat.

01 / Layout

Which biodiversity gains come first?

For major schemes, first address avoidable harm, then consider retention, mitigation, enhancement and creation on site before turning to registered off-site gains. Also check the specific rules for higher-distinctiveness and irreplaceable habitats. For qualifying non-exempt minor schemes, off-site units can be considered alongside on-site delivery. In either case, statutory credits remain the last resort.

For your submission Show the design options first. Then identify the remaining losses and the units needed for each habitat type. How the mitigation and gain hierarchies work.

02 / Market

Match the site to the shortfall

Search the register by authority, habitat or reference. For terrestrial area and hedgerow units, Defra’s November 2026 guide uses the planning authority or National Character Area to assess spatial risk. By contrast, watercourse units use catchments. Consequently, two London addresses can attract different multipliers.

Defra has announced plans to use nature recovery strategy areas for terrestrial spatial risk. In the meantime, use the published metric rules for your application. Defra metric tools and November 2026 user guide · Defra consultation response on spatial risk.

For your submission Ask for a written offer that identifies the habitat type and register reference. Also ask how the provider will record the allocation. Then confirm the spatial adjustment in your workbook before accepting the offer. How off-site units are bought and allocated.

03 / Last resort

Buy statutory credits from government

Habitat banks supply off-site units. If suitable on-site and off-site options cannot meet the requirement, discuss the outstanding deficit with the planning authority and retain evidence of the search. Statutory credits, by contrast, come from the government service, which sets prices by habitat tier.

For example, an eligible shortfall of one area unit requires two statutory credits in the applicable tier. Therefore, check the metric’s shortfall summary before applying. By contrast, providers negotiate private unit prices separately. Buying statutory credits · Defra credit prices by habitat tier.

For your submission Finally, keep proof of purchase for the Biodiversity Gain Plan. Compare biodiversity units and statutory credits.

Gain-site register · checked 4 November 2026

Three gain sites relevant to London

Follow each register reference to inspect the boundary, habitats and allocations. If you are considering a purchase, first check the delivery hierarchy. Because an allocation records units already assigned to a development, ask the provider what remains available. Also confirm the price and whether the habitat suits your project.

Bromley · Greater London

Charmwood Farm, Green Street Green

The 29.51-hectare record includes grassland and woodland improvements. For instance, the allocation panel records 2.82 area units for the Duke Youth Centre, Bromley, planning reference DC/24/03840/FULL1. It also records 0.32 area units for a Kenley development in Croydon.

Inspect BGS-021025002.

Kingston upon Thames · Greater London

Grassland and urban trees

The 0.8-hectare entry at grid reference TQ1689962461 records other neutral grassland in poor baseline condition. The plan aims instead for moderate grassland condition and also adds urban trees. Its allocation panel showed no development entry when checked. For prices or sale terms, however, you need to ask the provider.

Inspect BGS-280126001.

Nazeing · Essex

Harold’s Park Wildland

For an example of cross-boundary delivery, look at this Epping Forest district site. The register records 0.31 area units for Lausanne Road, Lewisham (DC/25/140660), and 0.24 for land at Elm Grove, Sutton (DM2025/00399). In both cases, the allocation relates to a particular development and habitat mix.

Inspect BGS-190325001 · Harold’s Park at Nazeing.

For land under consideration as a gain site, check registration and allocation and how a section 106 agreement or conservation covenant secures management. Compare quotes for the same habitat and quantity using the BNG cost guide.

Public planning evidence

What do London’s approved gain plans show?

Two authorities have published early results. They illustrate when on-site delivery has worked on paper and when a project has needed off-site habitat. However, the authorities cover different periods and project types, so their figures cannot establish a London-wide rate.

Park Royal Centre · approved plan

Read the units alongside the percentage

OPDC reported one approved Biodiversity Gain Plan between February 2024 and January 2026. The Park Royal Centre plan secured on-site gains of 0.6 units, reported as an 896.8% uplift. In particular, individual trees accounted for 0.345 units, while heathland and scrub accounted for 0.152.

Because the percentage depends on the starting value, a small baseline can produce a large percentage. For a constrained London plot, show baseline units, proposed gains and management commitments together. In other words, these are planned gains. Monitoring would be needed to confirm what the habitats deliver. OPDC biodiversity duty report.

Redbridge · seven major applications

Allow for off-site delivery early

Redbridge identified seven non-exempt major applications with satisfactory BNG information between February 2024 and November 2025. Of these, three needed off-site provision. The borough also reported that it was exploring a council habitat bank.

For an applicant, the practical question is whether the layout can deliver each habitat type for the required period. For that reason, test the metric before fixing the layout or assuming there are suitable local units. Redbridge biodiversity duty report.

How quickly has the market grown? In its February 2026 review of the English register, Savills counted 197 registered sites, up from 46 a year earlier. Those figures therefore describe national registrations. For a biodiversity net gain shortfall on a London site, match the habitat type, location and quantity before requesting a price. Savills’ February 2026 register analysis.

Application to commencement

Prepare evidence at the right stage

Planning stage 01 / 03

At application

First, establish whether statutory BNG applies. If it does, submit the dated baseline habitat plan together with the pre-development value and metric calculation. Also identify irreplaceable habitat and explain any earlier baseline date or clearance. Check the authority’s current validation list. Westminster, for example, sets out supporting documents for its applications.

Prepare your evidence
Planning stage 02 / 03

During design

Next, compare retention, enhancement and creation options. For a non-major proposal, check the current rules on the gain hierarchy before assuming all units must be delivered on site. At the same time, check protected habitats, species and local policy through their own assessment routes.

Review local policy
Planning stage 03 / 03

After permission

Where the statutory gain condition applies, obtain approval of the Biodiversity Gain Plan before starting development. Before submitting the plan, reconcile the final metric, habitat plans, registered off-site allocations and management commitments with the approved layout.

Discuss the gain plan
Site preparation / 05 checks

Your London site evidence

Gather these items early because the findings can affect the layout.

Discuss your London site →
  1. 01Identify the deciding authorityBring the address, red-line plan and any previous permission.

    Because a postcode can cover several sites, check the actual boundary. Then confirm the application date and any earlier consent.

  2. 02Record habitats before clearanceBring dated photographs, surveys and recent site history.

    For example, a vacant plot can contain open mosaic habitat. Therefore, record grassland, trees, scrub, watercourses and previously cleared areas before assuming a low baseline.

  3. 03Compare layout optionsMark retained and lost habitat on the same drawing.

    Show how each option affects the habitat. For instance, where will contractors reach the site without damaging tree roots or compacting retained grassland?

  4. 04Check mapped prioritiesCompare the LNRS map, local wildlife sites and borough designations.

    Record the mapped measure and why the proposed habitat fits it. However, a mapped priority alone cannot establish habitat condition or the metric score.

  5. 05Show who will manage the gainsIdentify the land, proposed works, responsible party and duration.

    Because significant on-site gains and registered off-site units need long-term management, agree early who will secure and maintain them. By contrast, retained habitat and temporary planting need separate treatment.

Project support

What BNG evidence does your London application need?

Bring the red-line plan, the borough’s advice and any existing ecology reports. For biodiversity net gain in London, the next step depends on whether you are choosing a layout, preparing the application or discharging the gain condition.

Before the layout is fixed

A BNG assessment records the baseline and compares layout options. For example, on a constrained plot, test how access and servicing affect the habitats you can retain.

The Biodiversity Gain Plan after permission

Use the Biodiversity Gain Plan to reconcile the approved design, final metric and any off-site allocation before development starts.

Managing habitat over time

A Habitat Management and Monitoring Plan sets out who will manage the gains. For example, a roof or courtyard needs arrangements for safe access, maintenance and monitoring.

If you are unsure whether the gain condition applies, first check the BNG exemptions guide or follow the BNG process guide for the full sequence.

Common London questions

BNG in London: frequently asked questions

For site-specific advice on biodiversity net gain in London, read these answers alongside the borough guide and your site’s planning history.

Ask about your site

Which borough should I select for a site near a boundary?

Use the site boundary and council mapping to identify every authority involved. For example, in Old Oak or Park Royal, check OPDC’s register and delegation arrangements before commissioning a borough-specific submission.

Can a green roof count towards both greening and BNG?

A roof can contribute to both calculations where it meets their separate criteria. For instance, the greening calculation needs the roof area and surface type. For BNG, however, justify the habitat type, target condition, management and access in the statutory metric.

Does a small London site qualify for an exemption?

For applications made from 6 August 2026, development on a site of 0.2 hectares or less can qualify where it does not affect on-site priority habitat. Therefore, measure the entire red-line site. Also check the original permission if the application varies a condition.

When do I submit the Biodiversity Gain Plan?

For a typical permission subject to the biodiversity gain condition, the authority approves the plan after permission and before development starts. However, the authority still needs enough baseline information at application stage to assess the proposal. Finally, check whether the permission requires a separate plan for each phase.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us the London borough, the site address and what you plan to build. Include the planning stage and any advice from the deciding authority. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.