Hillingdon / Local planning guide

Biodiversity Net Gain in Hillingdon

Biodiversity net gain in Hillingdon connects site habitats with local planning policy, river corridors and long-term delivery.

From Uxbridge and Hayes to Ruislip, Northwood and West Drayton, the right evidence depends on the actual site. ACP brings habitat surveys, statutory metric calculations and Biodiversity Gain Plans together with the borough’s adopted requirements.

Reviewed 5 November 2026 · Adopted 2012 and 2020 policies · February 2026 GiGL habitat evidence

Planning route / application date / priority habitat

Does statutory BNG apply to your Hillingdon site?

Where the statutory gain condition applies, a development normally needs at least 10% biodiversity gain. First, however, establish the permission route and relevant exemptions.

Check the current application rules

For relevant applications from 6 August 2026, sites of 0.2 hectares or less can qualify for exemption. The exemption does not cover development that reduces on-site priority habitat value. Measure the full red-line site and check permission variations.

The general self-build exemption also ended for new applications from that date. Therefore, use the current national exemption guidance and our BNG exemptions guide for the relevant route.

Separate the planning requirements

An exempt proposal may still need ecology surveys, tree protection and mitigation under local policy. Likewise, protected species and designated sites require their own assessment.

For an aviation or infrastructure scheme, establish the actual consenting route. Qualifying nationally significant infrastructure applications submitted from 2 November 2026 follow their separate BNG framework; proximity to Heathrow alone does not determine it.

Use the Statutory Biodiversity Metric tools and guides, updated 10 November 2026. Record the version used. The older Biodiversity Metric 4.0 is not the name of the current statutory tool; use the Small Sites Metric only where its eligibility rules permit.

National framework / London Plan / borough policies

Hillingdon biodiversity policy: EM7 and DMEI 7

Hillingdon Council determines borough planning applications, subject to relevant strategic referral arrangements. Its adopted development plan includes 2012 strategic policies, 2020 development-management policies and the London Plan 2021.

Adopted policy and practical design implications
Policy or evidenceWhat it means for your site
EM7 and EM3

Part 1 addresses biodiversity and geological conservation through EM7 and the Blue Ribbon Network through EM3. Check the site’s ecological links and waterside setting.

DMEI 7 A–B

Retain and enhance existing biodiversity. For proposals affecting ecological features, provide suitable surveys and assessments. Explain unavoidable loss and the proposed replacement or secured off-site response.

DMEI 7 C–D

Main-river and Grand Union Canal frontage brings an expectation of additional biodiversity improvements. Significant harm that cannot be avoided, mitigated or compensated can lead to refusal.

DMEI 8

Coordinate waterside character, access and environmental quality. Establish the actual river or canal boundary before fixing the layout.

DMEI 1 and DMHB 14

Bring living roofs, vegetation, trees and landscaping into the same design evidence. Maintenance access and realistic habitat condition also matter.

DMEI 9 and DMEI 10

Check flood risk and water management separately. Drainage features need suitable hydrology and management before they can support a biodiversity target.

Read the adopted Local Plan gateway and Part 2 development-management policies, including DMEI 7 on printed page 75. This 2020 policy predates mandatory statutory BNG. It does not establish a separate borough-wide percentage above the national minimum.

The replacement Local Plan is still emerging

The 2026 scoping consultation closed on 21 August. The revised timetable lists content-and-evidence consultation for 8 April–27 May 2027 and proposed-plan consultation from December 2027 to February 2028.

These planned stages do not replace adopted policies. Check the September 2026 Local Plan timetable for later changes before preparing a live submission.

G1 / G5 / G6 / G7

Coordinate urban greening and biodiversity evidence

London Plan policies add a strategic layer to Hillingdon’s requirements. G1 concerns green infrastructure, G6 biodiversity and G7 trees and woodland.

Urban Greening Factor

G5 asks major developments to integrate greening into their design. The Urban Greening Factor weights surfaces such as vegetation, roofs and trees; it is not a biodiversity percentage.

Use the GLA Urban Greening Factor guidance and the applicable planning requirements. Then reconcile the calculation with landscape, roof and drainage drawings.

Statutory habitat value

The biodiversity metric considers habitat type, extent, condition and relevant risk factors. Retention, enhancement and creation proposals therefore need evidence beyond a surface-area schedule.

A roof or planted courtyard may contribute to both systems, but each calculation needs its own justification. Read the London Plan green-infrastructure policies alongside the statutory metric.

GiGL February 2026 / woodland / wetlands / urban connections

Habitats that can shape a Hillingdon assessment

GiGL’s February 2026 factsheet records 80 SINCs covering 2,060.3 hectares and 510.8 hectares of priority habitat. These borough totals guide investigation; they do not establish the habitats on a particular site.

Ruislip and Northwood woodland

Ruislip Woods includes ancient semi-natural woodland, streams, ponds and grassland. Its reserve and SSSI designations require careful boundary checks; do not assume their mapped extents are identical.

Where ancient woodland or other irreplaceable habitat may be affected, use the relevant protection and bespoke assessment route. A standard 10% calculation cannot resolve every impact. Council Ruislip Woods evidence.

Colne Valley and Harefield

Wetlands, lakes and river corridors create different ecological questions from urban plots. Mid Colne Valley SSSI includes important waterbird interests, so disturbance and hydrological effects may matter beyond a development boundary.

Use Natural England MAGIC mapping and current ecological records to scope designated-site assessment. Then test the actual development’s pathways of effect.

Hayes, Yeading and canal-side sites

Yeading Brook and the Grand Union Canal connect habitats through developed areas. DMEI 7 C is particularly relevant to main-river and canal frontage, alongside DMEI 8 waterside design.

Check banks, access, lighting and proposed landscape works together. Where needed, obtain River Condition Assessment advice before deciding which metric accounts the scheme affects.

Uxbridge, Yiewsley and West Drayton

Urban redevelopment can involve trees, grassland, scrub and previously developed land. However, a brownfield label does not prove a low baseline or rule out priority open mosaic habitat.

Survey the site before clearance and retain dated evidence. Our BNG assessment and baseline survey service connects habitat condition with realistic layout options.

The GiGL factsheet also records 473 open spaces covering 5,222.1 hectares. These overlapping datasets are not interchangeable with protected-site designations or available habitat-bank land. Use licensed records and current surveys for a site assessment.

London LNRS / mapped measures / practical delivery

Use nature-recovery mapping at the right scale

London’s Local Nature Recovery Strategy was published in March 2026. Its public spatial dataset was updated in September 2026, providing a starting point for mapped priorities.

Match the measure to the actual land

Compare the red-line boundary with Areas of Particular Importance for Biodiversity, potential recovery areas and relevant measure locations. For a Hillingdon proposal, examine woodland connections, wetland recovery and river corridors where the mapping supports them.

Record the specific mapped measure and explain how the habitat proposal responds. Strategic significance follows the applicable metric guidance; a nearby mapped priority alone does not establish the score.

Understand the data limits

The public open-data extract may omit certain polygons or attributes. Consequently, a screenshot is not a complete constraints search. Obtain the appropriate full data and licence where the assessment needs them.

Read the London LNRS with its mapped habitat priorities. The strategy does not make every opportunity area a protected site or a registered source of units.

Local restoration: Park Wood and Pinn Meadows

In October 2026, the council reported five leaky dams and a new pond at Park Wood, alongside other natural flood-management works. It also described interventions at Pinn Meadows.

The practical lesson is to consider hydrology, habitat condition and maintenance together. These River Pinn flood-risk projects are public environmental works, not verified biodiversity units available for purchase.

Seven checks / application evidence / delivery decisions

Your Hillingdon site and watercourse checklist

Use this checklist to brief the ecology and design team. It identifies evidence to gather, rather than automatically deciding eligibility or calculating a biodiversity score.

  • Mark the red-line boundary, proposal, application date and permission history. Check any exemption and whether the consenting route is ordinary planning or nationally significant infrastructure.

  • Check MAGIC, GiGL records and the council policies map. Identify SSSI, SINC, ancient woodland, priority habitat and protected-species survey needs without inferring them from the postcode.

  • Establish whether DMEI 7 C applies. Record the affected river or canal, bank, ecological connections, access and lighting proposals, then scope the necessary watercourse evidence.

  • Provide habitat type, extent and condition evidence, a justified baseline date and a scaled habitat plan. Record the statutory metric version and assess its separate habitat accounts.

  • Reconcile trees, roof habitats, drainage and UGF with the same drawings. Explain target condition, delivery times, management access and the effects of construction.

  • Check habitat trading, location factors, registration and existing allocations. Obtain a dated operator offer and suitable legal security rather than assuming local supply.

  • Match the Gain Plan to the permission and final metric. Agree responsibility, funding, monitoring and corrective action for the required long-term habitats before commencement where applicable.

For a live application, use the council’s application guidance and current national/local validation lists. The research did not establish a separately dated 2026 borough BNG checklist, so confirm the required local documents with the council.

Public council records / separate metric accounts

What the Hayes data-centre proposal demonstrates

Application 78343/APP/2025/719 concerns Hayes Bridge Retail Park and Heathrow Interchange on Uxbridge Road. The planning register showed Approval when checked on 5 November 2026.

Reported proposed gains — October 2025 committee evidence
Metric accountReported design-stage result
Area habitat

0.44 units of proposed gain; 10.65% uplift. This is the area-habitat account.

Hedgerows

0.57 units of proposed gain; 98.57% uplift. Keep these linear-habitat units separate.

Watercourses

0.09 units of proposed gain; 11.66% uplift. A strong hedgerow result cannot replace the watercourse calculation.

The 2 October 2025 committee report also identifies part of the site within the Yeading Brook, Minet Country Park and Hitherbroom Park SINC. The example shows why metric accounts and habitat protection need separate consideration.

These are proposed assessment results, not proof of established habitats or approved discharge of the Gain Plan. Check the current application and conditions for the latest scheme. No ACP involvement is claimed.

Northwood: distinguish permission from condition approval

Copse Wood Way application 8933/APP/2026/1220 covers several conditions, including a Biodiversity Gain Plan. The council portal records Approval, with a decision on 22 July 2026.

Use the application record and decision documents to follow the sequence. Because the submission combines conditions, inspect the notice before treating a particular biodiversity requirement as discharged.

Before submission / after permission / before works

Prepare the evidence at the correct planning stage

A Biodiversity Gain Plan normally follows planning permission. Nevertheless, the original application needs enough ecological and baseline evidence for the authority to assess the proposal.

At application

For an in-scope application, state whether the gain condition applies. Provide the pre-development biodiversity value, completed metric and scaled habitat plan. Also explain relevant baseline dates, degradation and irreplaceable habitat.

Use the national minimum information requirements alongside Hillingdon’s current list. Separate protected-species or ecological-impact reports may also be necessary under DMEI 7.

Before development starts

Where required, obtain approval of the Gain Plan before commencement. Reconcile the permitted layout, final metric, registered off-site allocation and habitat commitments.

Significant on-site and registered off-site gains need the applicable long-term security and management, generally for at least 30 years. Our Biodiversity Gain Plan and HMMP guidance explain the supporting work.

Habitat match / registration / allocation / security

Off-site biodiversity units for Hillingdon development

The research did not substantiate a Hillingdon gain site with a current, suitable allocation and dated seller offer. This does not establish that no local supply exists.

Verify the actual offer

Begin with the official gain-sites register. Check the registered boundary, habitat type, legal agreement, delivery programme and existing allocations. Then obtain written confirmation of remaining stock and price.

An advert, nearby reserve or LNRS opportunity does not establish available units. Also consider the statutory metric’s location and trading rules before comparing quotations.

Apply the relevant delivery hierarchy

Read DMEI 7 alongside the current statutory gain hierarchy. The August 2026 changes affect qualifying non-major schemes, so avoid relying solely on the older local-plan wording.

Secure and record off-site units through the official allocation procedure. Statutory biodiversity credits are a separate last-resort route under the applicable rules, not another name for private units.

Professional scope / council administration / habitat delivery

Hillingdon BNG costs and published fee information

Separate the ecology quotation, planning fees, legal work and habitat delivery budget. No current fixed Hillingdon-specific BNG monitoring tariff was independently verified in the research.

Different costs to establish before commissioning
Budget itemHow to establish the relevant cost
Surveys and statutory metric

Scope the site area, habitat complexity, survey season, existing evidence and design options. Obtain a project-specific consultancy quotation; no universal Hillingdon assessment price is stated.

Gain Plan condition approval

The April 2026 national fee schedule lists £309 for non-householder condition-approval applications, including the relevant Gain Plan route. This is an administration fee, not a borough ecological monitoring tariff.

Legal agreement and monitoring

Confirm the authority’s calculation and the actual planning obligation. Allow separately for legal drafting, monitoring visits, reporting and corrective work where required.

Private biodiversity units

Compare the same habitat category, quantity, location treatment and contractual terms. Registration does not establish available stock, and a unit quotation does not cover every project cost.

Long-term habitat management

Allow for establishment, maintenance, target-condition monitoring and remedial action. Identify the responsible manager, access arrangements and funding throughout the secured period.

Check the April 2026 planning-fee schedule and, only where relevant, Defra statutory credit prices. Our BNG costs and pricing guide explains the different budget categories.

Survey / metric / design / gain plan

Discuss biodiversity net gain in Hillingdon with ACP

Send the address, red-line boundary, proposal and planning stage. Existing ecology reports, tree information and landscape drawings help us scope the work.

Our BNG consultants can connect habitat surveys, metric options, Gain Plans and management evidence. For riverside or canal-side projects, identify the affected watercourse and any council advice at the outset.

For wider guidance, see BNG in London and the England BNG guide. Relevant adjoining borough pages cover Ealing, Harrow and Hounslow. Apply the correct authority’s policies to each site.

Send your Hillingdon project details →

Local policy / waterside sites / practical costs

Hillingdon BNG questions

These answers address local planning decisions. For a particular site, check the current source documents and the planning history before selecting the evidence route.

Which local policy governs biodiversity in Hillingdon?

DMEI 7 in the adopted 2020 Local Plan Part 2 is central. It addresses retention, survey evidence, waterside improvements and significant harm. Read it with Part 1 EM7, other relevant borough policies and the London Plan.

Does a canal-side proposal have an extra biodiversity requirement?

DMEI 7 C expects additional biodiversity improvements for development alongside or benefiting from frontage onto a main river or the Grand Union Canal. Establish whether that wording applies to the actual site and coordinate the response with waterside design and metric evidence.

Is a Hillingdon site below 0.2 hectares automatically exempt?

No. Check the application date, route, red-line site area and impacts on priority habitat. Permission variations also need the original consent checked. An exemption from statutory BNG does not remove separate ecological or local-policy requirements.

Can a green roof satisfy both UGF and BNG?

Potentially, but the calculations address different requirements. UGF uses weighted greening surfaces, while the statutory metric measures habitat value. Provide separate calculations with consistent roof plans, target condition, maintenance and access arrangements.

Does the London LNRS prove a site can sell units?

No. Nature-recovery mapping identifies priorities and opportunities. Saleable off-site units require the relevant legal security, registration, habitat evidence and available allocation. Check the operator’s current offer and the actual metric shortfall.

What does the Hayes Bridge example show?

The council report presents separate gains for area habitat, hedgerows and watercourses. Do not add the unit types together. The SINC context also needs its own assessment, and proposed metric gains are not proof of mature habitats.

Is there a fixed Hillingdon BNG monitoring fee?

No current universal borough tariff was verified. Confirm the charge within the project’s planning obligation or council advice. The national non-householder condition-approval fee, professional fees, legal costs and private biodiversity units are separate budget items.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.