Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

London / Ealing BNG guide

Biodiversity Net Gain in Ealing

Biodiversity net gain in Ealing brings industrial renewal, garden development and urban greening into a landscape of river corridors, meadows and woodland.

Identify the deciding authority, understand adopted policy and check the changing Local Plan. Use verified local examples to plan habitat surveys, delivery and costs.

Evidence reviewed 5 November 2026 · Adopted borough policies distinguished from the emerging Local Plan and its revised BNG wording.

Authority, policy and current changes

Which planning rules apply in Ealing?

Ealing Council decides most borough applications. However, OPDC is the planning authority in its designated area around North Acton and Park Royal. Check the red-line boundary and any delegated arrangements before selecting the submission route.

Establish the national BNG route

In-scope development must achieve at least 10% gain using the statutory biodiversity metric. Obtain approval of the final Biodiversity Gain Plan before starting development. Significant on-site gains and registered off-site gains require at least 30 years of secured management.

Exemptions changed on 6 August 2026, including a conditional route for sites no larger than 0.2 hectares. Check priority habitats, application dates and the complete tests. Review the current exemptions.

Adopted Ealing policies: 5.3 and 5.4

The Development Strategy dates from 3 April 2012. Its “2026” title describes the plan horizon. Policy 5.3 protects green corridors, including the Grand Union Canal, railway land and River Brent.

Policy 5.4 protects and enhances nature-conservation networks. For adjoining development, address habitat continuity, access, lighting and construction effects. Read the adopted strategy · Check the development-plan documents.

Local variations 5.10 and 5.11: planting and roofs

The December 2013 Development Management DPD seeks no net loss of planting amenity through local variation 5.10. Policy 5.11 encourages suitable green roofs.

Major development within 100 metres of the listed green-space designations should provide green roofs. In this buffer, biodiversity takes precedence where it conflicts with roof amenity. Check the precise designations and design context. Read local variation 5.11.

Local variation 5.12: water and development

This policy addresses surface-water, sewer and groundwater flooding. It restricts development that reduces flood capacity or is vulnerable to flooding within specified watercourse buffers.

The distances are eight metres beside main rivers and five metres beside ordinary watercourses. These are specific policy tests, not a blanket statement that all development is prohibited. Coordinate drainage and habitat design. Read local variation 5.12.

London Plan: distinguish greening from habitat gain

G1 concerns connected green infrastructure, G5 urban greening, G6 biodiversity and G7 trees. These strategic policies sit alongside adopted borough requirements.

Calculate the Urban Greening Factor separately from BNG. For industrial proposals, check the B2 and B8 exclusions from the Mayor’s recommended commercial target. The Southall case below shows why this matters. Read the London Plan policies.

Inside OPDC: use the correct development plan

OPDC adopted its Local Plan on 22 June 2022. SP8 and EU2 address green infrastructure, public space and biodiversity in that planning area.

An Ealing postal address does not establish which Local Plan governs the application. Confirm the boundary and responsible case officer, especially around Park Royal and North Acton. Open the OPDC plan and policies map · Read SP8 and EU2.

Emerging policy is different: SMM143 in the revised suggested modifications deletes the draft 20% BNG wording. It substitutes the national standard and encourages gains above it. This is not an adopted 20% borough requirement. See page 123 of the 27 March 2026 schedule · Read the council’s September 2026 guidance on policy weight.

Application-stage evidence

Prepare a consistent planning submission

Start with the council’s current application gateway and the national information requirements. A dedicated current Ealing BNG validation checklist was not verified from the accessible sources. The table below is a preparation guide, not a substitute council checklist.

Ealing planning evidence: a practical preparation guide
IssueEvidence and action
Authority and scopeConfirm Ealing or OPDC jurisdiction. Explain whether statutory BNG applies and provide evidence for any exemption.
Baseline and designProvide the required habitat plan, statutory metric and supporting condition evidence. Align the survey boundary, landscape drawings and development description.
Other ecological constraintsCheck designated sites, protected species, trees and watercourses separately. BNG exemption does not remove these planning issues.
Gardens and greeningAssess garden quality and usable space under policy 7D and its SPD. Coordinate roof habitats, trees, drainage and maintenance access.
Final deliveryResolve the gain plan, registered off-site allocation where needed, legal security and management responsibilities before the relevant commencement trigger.

Check the council’s submission requirements and confirm any site-specific information with the deciding authority. The Biodiversity Action Plan’s future validation actions do not themselves establish a published requirement.

Garden space has its own planning purpose

The Planning New Garden Space SPD, adopted on 9 June 2015, explains the quality and provision of residential outdoor space. It supports policy 7D and addresses changes to existing gardens as well as new provision.

A useful garden, a green roof and a positive biodiversity metric are different outcomes. Demonstrate each relevant requirement. Read the garden-space guidance.

Check guidance for the development area

The adopted SPD register includes Southall Gateway, adopted in June 2015, and The Green, Southall, adopted in October 2017. Identify which guidance covers the actual site.

In contrast, the replacement Local Plan remains in examination. Use the latest modifications and policy-weight guidance when explaining emerging proposals. Review the adopted SPD register · Check the emerging plan’s status.

Separate the application from the final gain plan

An application-stage strategy tests feasibility and explains the baseline. The final Biodiversity Gain Plan must match the approved proposal and any off-site allocation.

Where required, the Habitat Management and Monitoring Plan should specify establishment, inspections, responsibilities and corrective work. Secure realistic funding and access for the relevant term.

Avoid an incomplete submission

The council’s published process says unanswered invalid applications may be returned after 28 days, with a £45 administration charge. This is a general application charge, not a biodiversity monitoring fee.

Use a document schedule so the officer can locate the metric, habitat plan and supporting ecology evidence. Check the current invalid-application process.

London’s published nature recovery strategy

Explore mapped opportunities in Ealing’s planning area

London’s April 2026 Local Nature Recovery Strategy provides mapped priorities for recovery. This overview uses the Ealing Council planning-area boundary, which excludes OPDC. It is not the full administrative borough outline.

Ealing Council planning area and four London nature recovery priority locationsSelect a numbered location or use the matching text links. These published potential measures are not habitat boundaries or sites with units for sale.1234N ↑

Four examples / full text alternatives

Connect the map to a practical question

Select a numbered marker or its text link: Woodland — PM3869, Lowland meadow — PM3525, Rivers and streams — PM2130, Woodland — PM3872.

Markers represent points within published potential-measure polygons. They do not show habitat boundaries, development allocations or units available for purchase.

1. Woodland — PM3869

This north-western opportunity highlights woodland recovery. Check the full mapped polygon and existing habitats before selecting management, buffering or planting. Protect valuable grassland from inappropriate tree planting, and use evidence to set achievable woodland condition targets.

Inspect the published measure and its extent

2. Lowland meadow — PM3525

This south-western measure illustrates a grassland opportunity. Survey species, soil nutrients and management history before specifying seed or mowing. Restoration needs sustained cutting or grazing, removal of arisings where appropriate, and a realistic establishment period.

Inspect the published measure and its extent

3. Rivers and streams — PM2130

This southern mapped opportunity concerns freshwater recovery. Investigate the actual channel, banks, drainage connections and catchment pressures. Assess watercourse units separately from terrestrial habitat units, and coordinate any intervention with flood-risk and watercourse permissions.

Inspect the published measure and its extent

4. Woodland — PM3872

This eastern opportunity gives a different urban context. Inspect habitat edges, existing trees and connections to nearby green spaces. Assess lighting and access pressures alongside habitat area. A point on this overview does not establish woodland within an application boundary.

Inspect the published measure and its extent

Boundary: ONS January 2026 LPA data, E60000208, OGL v3.0, Crown copyright and database right 2026. Measures: GLA/GiGL April 2026 open data. Inspect the full polygons and the actual site before using them.

Apply strategic significance only where the proposed location and intervention meet the applicable metric criteria. Borough location alone does not justify an uplift. Read London’s strategy · Understand the statutory biodiversity metric.

Local ecological character

Design around real habitats and connections

Ealing’s Biodiversity Action Plan 2022–2027 describes a varied ecological network. It supports survey scoping and local interpretation, but it cannot establish the current condition of an individual development site.

Brent River and Grand Union Canal

The action plan identifies these waterways as important ecological connections. The adopted strategy also gives them specific green-corridor protection.

For Hanwell, Southall or canal-side schemes, consider bank vegetation, water quality, drainage and lighting. Establish which water features the statutory metric actually requires you to assess. Explore the borough habitat evidence.

Horsenden Hill and Perivale Wood

The action plan describes ancient woodland, grassland and ponds within this wider northern network. Islip Manor and Yeading Brook Meadows add important grassland connections.

Survey the relevant site and surroundings. Avoid assuming that every nearby plot contains these habitats. Ancient woodland and other irreplaceable habitats need their own protection and treatment. Check the irreplaceable-habitat rules.

Acton and the urban woodland network

Gunnersbury Triangle provides an example of secondary woodland, ponds and acid-grassland interest within an urban setting. Gardens, railway edges and retained trees can connect smaller habitat areas.

For intensification proposals, examine the effect of buildings, shading, lighting and maintenance routes on those connections. Use the current baseline, rather than treating previously developed land as empty of ecological value. Read the local habitat account.

Southall industrial renewal

Industrial sites must accommodate servicing, utilities and safe access alongside ecology. The Collet Way example below combines rain gardens and planting with operational yard space.

Test drainage, contamination constraints and planting conditions together. A habitat that cannot survive the proposed use will not deliver its forecast condition. Read the industrial redevelopment assessment.

Planning evidence and habitat management

Lessons from Ealing projects and allocations

These examples cover a planning resolution, a registered allocation and an ecological project. Each provides useful evidence, but none should be presented as proof of ACP involvement or a general guarantee of planning approval.

Collet Way: 21.34% forecast habitat gain

Application 260086FUL concerns Unit 2, Great Western Industrial Park, Southall. On 17 June 2026, the committee resolved to grant permission subject to conditions and a Section 106 agreement.

The report forecast 21.34% habitat-unit gain through rain gardens, shrubs, neutral grassland and mixed scrub. This is a design-stage calculation, not a measured outcome. Read paragraphs 13.20–13.24 · Read the resolution.

The same scheme: a separate UGF assessment

The report records an Urban Greening Factor of 0.165. It explains the industrial constraints and the London Plan exclusion of B2 and B8 uses from the recommended 0.3 commercial target.

The lesson is to explain the applicable land-use policy, rather than treating a BNG percentage as a substitute UGF score. Nor does this decision create a universal exception for other sites. Inspect the officer’s reasoning.

Charlbury Grove: trace the allocation

The official register links Ealing application 250928FUL at Charlbury Grove to 0.08 area units at BGS-161025001. The planned habitat is other broadleaved woodland.

Match the reference, habitat category and final metric to the allocation record. The gain site lies in Tendring, Essex; this is cross-boundary delivery evidence, not proof of current stock or final gain-plan approval. Inspect the allocation tab.

Paradise Fields: plan for continuing management

The Ealing Beaver Project involves Citizen Zoo, Ealing Wildlife Group, Friends of Horsenden and the council. Its December 2025 update describes a water-control pipe installed after rising pond levels threatened the Capital Ring path.

This illustrates the need to monitor habitats and adjust management around public access. May 2026 research also examines community participation and urban wildlife management. Neither source establishes tradeable BNG units or a measured metric uplift. Read the management example · Explore the research.

Supply evidence and realistic budgeting

Check the habitat parcel, available units and charges

Start with the habitat shortfall and trading rules. A provider’s wider project description, the registered gain-site boundary and units currently available are three separate pieces of information.

Brook Farm: a verified route outside London

Tendring Council identifies Brook Farm at Stones Green Road, Great Oakley, as BGS-161025001, reference 25/00165/HAB. The register records a 19.02-hectare gain site at TM185273.

Nature Based Farming describes a wider 50-hectare project and advertises several habitat categories. Do not substitute that wider area for the registered parcel. Ask for a dated stock confirmation and price; no current public unit price was verified. Check the council record · View the provider’s offer · Inspect the registered boundary.

Location affects the calculation

Check planning-authority and National Character Area relationships for area units, and the appropriate rules for hedgerow or watercourse units. An Essex location is not automatically suitable for every Ealing shortfall.

Confirm the spatial multiplier, habitat category, legal security and allocation before reserving units. Read the national off-site guidance · Explore off-site biodiversity units.

Apply the current gain hierarchy

Avoid and mitigate harm first. Under the August 2026 changes, qualifying non-major applications have equal preference for on-site enhancement, creation and registered off-site compensation at the compensation stage.

Check transitional cases and other development routes separately. Statutory credits remain last. Older local guidance may not reflect the revised hierarchy. Review the current national rules.

Distinguish a fee schedule from a case example

The June 2026 Collet Way report used £500 for one non-financial head of terms. However, the published 2026/27 corporate schedule lists £519 in its new-charge column.

Use the current schedule and obtain written confirmation for the actual agreement. General S106 administration does not establish the cost of 30 years of ecological monitoring. Read schedule pages 22–23.

Published Ealing charges and costs to confirm
Cost categoryEvidence and scope
General S106 administrationThe published 2026/27 schedule lists £519 for financial contributions totalling no more than £10,000, and £519 per non-financial head of terms.
Larger S106 financial contributionsAbove £10,000, the schedule lists 5%, capped at £20,000. For values above £500,000, it provides for a bespoke negotiated cap. Confirm the applicable calculation with the council.
BNG monitoring and legal workNo separate current Ealing-wide BNG ecological monitoring tariff was verified. Request the project-specific scope and charges, including legal work and long-term reporting.
Units, consultancy and habitat careObtain separate quotations for assessment, private units, registration or allocation, habitat establishment and continuing management. These are different cost categories.
Government biodiversity creditsStatutory credits are a last-resort route with official prices and rules. They are different from private units and council administration charges.

Check statutory credit prices if relevant, and use BNG cost guidance to structure a complete budget.

A practical project sequence

Your Ealing planning evidence checklist

Use these prompts alongside the deciding authority’s current requirements. The checkboxes are a reading aid; they send no information to ACP or the council.

Before submitting

  • Locate the red-line site, policies map and any neighbourhood-plan coverage. Record adopted and emerging policy separately.

  • Apply current exemption and transitional tests. Explain the evidence for the conclusion without treating BNG exemption as removal of ecology duties.

  • Scope species work, trees, gardens, railway edges and water features. Check seasonal constraints and the condition of habitats actually present.

From design to delivery

  • Align the metric, landscape plan, UGF where relevant, drainage and maintenance access. Explain achievable habitat condition and timing.

  • Confirm the registered parcel, habitat type, spatial rules and allocation. Obtain separate unit, legal, council and management cost information.

  • Where required, obtain gain-plan approval before starting. Implement the agreed habitat prescriptions, reporting, inspections and remedial actions.

Qualifying nationally significant infrastructure applications entered a separate BNG regime on 2 November 2026. Confirm the consenting route before applying ordinary borough procedures. Read the infrastructure guidance.

Assessment and geographic connections

Build a practical Ealing BNG strategy

ACP can help with habitat surveys, metric calculations and planning evidence. Share the site address, red-line plan, application stage and existing ecology reports through the approved enquiry form below.

Follow the relevant neighbouring authority

The London hub provides borough navigation, while the England guide explains national context. Consult Brent for adjoining Park Royal connections or Hounslow for southern cross-boundary issues.

Keep the policy status under review

Check the Ealing examination record for later modifications and adoption. The council’s September 2026 guidance explains that emerging-policy weight depends on preparation, unresolved objections and national-policy consistency. Follow the examination updates.

The replacement London Plan also remains emerging after consultation ending 15 October 2026. Check the London programme.

Practical local questions

Ealing BNG questions

These answers distinguish authority boundaries, adopted policy, emerging proposals and delivery evidence.

Does Ealing currently require 20% biodiversity net gain?

The adopted documents reviewed do not establish a blanket 20% statutory BNG requirement. SMM143 in the revised March 2026 suggested modifications deletes that draft wording and refers to the national standard. The replacement Local Plan remains emerging; check later examination and adoption updates.

Does Ealing Council decide every application in the borough?

No. OPDC is the planning authority within its designated area around North Acton and Park Royal. Check the red-line boundary and any delegated arrangements. An Ealing address does not by itself identify the deciding authority.

Do green roofs satisfy both BNG and urban greening requirements?

They may contribute, but the calculations and policy tests differ. Ealing local variation 5.11 also has specific provisions for major development near listed green-space designations. Check habitat quality, roof design, maintenance and the applicable Urban Greening Factor separately.

Where have off-site units been allocated to an Ealing proposal?

The official register links Charlbury Grove application 250928FUL to 0.08 area units at BGS-161025001 in Tendring, Essex. This confirms a recorded allocation, not available stock, a universal acceptable location or final gain-plan approval.

Is the council’s S106 charge the full BNG monitoring cost?

No. The published corporate schedule addresses general S106 administration. Obtain a separate project-specific scope for ecological monitoring, legal work and long-term management. Keep these costs separate from private habitat units and consultancy fees.

Does the nature-recovery map cover the whole borough?

The overview uses the Ealing Council local planning authority boundary and excludes OPDC. Its markers illustrate published potential measures. Check the full dataset, actual habitat survey and metric criteria before using any location in a site strategy.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.

Evidence and further reading

Sources behind this guide

Reviewed 5 November 2026. Policy status, forecast outcomes, registered allocations and provider descriptions are distinguished throughout. No ACP involvement in the cited projects is claimed.

Ealing policy and application evidence

Nature recovery, delivery and costs

National and London framework