Hounslow / Local planning guide
Biodiversity Net Gain in Hounslow
Biodiversity net gain in Hounslow starts with the site’s habitats, planning history and connections to the borough’s green and blue network.
From Brentford and Chiswick to Hounslow, Feltham and Bedfont, development sites face different ecological questions. ACP connects habitat surveys, statutory metric assessments and Gain Plans with the evidence your proposal needs.
Reviewed 5 November 2026 · Adopted GB7 and emerging-plan status distinguished · Published council monitoring charges
Application date / site area / priority habitat
Does statutory BNG apply to your development?
An in-scope development normally needs at least 10% biodiversity gain. However, establish the applicable planning route and exemptions before choosing the survey and metric work.
Check the August 2026 rules
For relevant applications from 6 August 2026, sites of 0.2 hectares or less can qualify for exemption. Development that reduces on-site priority habitat value does not qualify under that exemption. Check the full red-line area, application date and permission variations.
The general self-build exemption also ended for new applications from that date. Therefore, read the current national exemptions and our BNG exemptions guide before relying on site size or development type.
Keep separate ecology duties in view
An exempt scheme may still need habitat, species or tree evidence. Hounslow GB7 and London Plan nature policies continue to matter where relevant. Likewise, a positive metric result cannot replace protected-site assessment.
For a Heathrow-related infrastructure proposal, identify the actual consenting regime. Qualifying nationally significant infrastructure applications from 2 November 2026 follow their separate framework; an airport-adjacent location alone does not determine the route.
Use the current Statutory Biodiversity Metric tools, updated on 10 November 2026. Record the version and check Small Sites Metric eligibility separately. The older Biodiversity Metric 4.0 is not the current statutory tool name.
National legislation → London Plan → Borough policy
What Hounslow’s adopted policies mean for applicants
Hounslow adopted its Local Plan 2015–2030 on 15 September 2015. Policy GB7 is central to biodiversity decisions, with green infrastructure and water policies shaping the wider design.
| Policy or evidence | What it means for your site |
|---|---|
| GB7 — Biodiversity | Avoid significant biodiversity harm first. Explain mitigation and, only as a last resort, compensation. Identify designated sites, ecological connections, trees and opportunities for habitat improvement. Major proposals should coordinate ecological plans with landscape design. The policy predates statutory BNG and does not establish a separate universal borough gain percentage. |
| GB4 — Green Infrastructure Network | Show how retained and proposed habitats relate to open spaces and wider connections. For example, avoid isolating a useful boundary corridor behind impermeable development or poorly placed lighting. |
| GB5 — Blue Ribbon Network | Consider the Thames, Brent, Crane, canals and connected waterways where the site actually affects them. Coordinate bank habitats, waterside access, drainage and appropriate river evidence. |
| GB1 and GB2 — Protected land and open space | Check Green Belt, Metropolitan Open Land and open-space policy separately from habitat units. A park or protected open-space allocation does not establish an available habitat-bank offer. |
| EQ3 and EQ8 — Flood risk and contamination | Test habitat proposals against drainage and ground conditions. On previously developed land, suitable soil, hydrology and maintenance arrangements influence whether the intended habitat condition is realistic. |
Use the adopted plan and policies-map gateway and Local Plan Volume One for the actual wording and mapped boundaries. The council’s supplementary guidance includes planning obligations, site briefs and the 2025 climate SPD; check which documents apply to the proposal.
The replacement plan remains under examination
The Local Plan 2020–2041 is emerging, not adopted. Its hearings ended on 2 July 2026; the additional written consultation closed on 29 October. The council’s response was due on 12 November when this page was reviewed.
Draft GB7 contains more detailed BNG proposals, including an early draft Gain Plan and nearby off-site delivery. Distinguish these proposals from adopted policy and the formal statutory Gain Plan stage. Check the current examination news and submission draft for changes.
London Plan G1 / G5 / G6 / G7
Coordinate urban greening with habitat value
The adopted London Plan 2021 remains the strategic planning layer. G1 addresses green infrastructure, G6 biodiversity and G7 trees and woodland. G5 adds Urban Greening Factor evidence for major development.
Urban Greening Factor
UGF weights greening surfaces such as planting, roofs and trees. The London Plan’s interim targets generally distinguish residential-led development at 0.4 and predominantly commercial development at 0.3; check the applicable policy and proposal.
Use the GLA UGF guidance and consistent roof, landscape and drainage plans. A 0.4 score is not 40% biodiversity net gain.
Statutory biodiversity units
The statutory metric considers habitat type, extent, condition and relevant risk factors. Area habitat, hedgerow and watercourse accounts remain separate. Consequently, a strong result in one account does not automatically settle another.
A green roof or rain garden may contribute to both systems. Nevertheless, demonstrate each calculation separately and justify its habitat condition and management. Read the adopted London green-infrastructure policies alongside the metric.
GiGL February 2026 / designated sites / connected landscapes
Habitats and development settings across Hounslow
GiGL’s February 2026 factsheet records 47 SINCs covering 1,365.8 hectares, and 121.8 hectares of priority habitat. These borough figures guide investigation; they do not establish the habitats or condition within a development boundary.
Crane Valley, Hounslow Heath and Feltham
The River Crane, Hounslow Heath, Cranebank Meadows and Duke of Northumberland’s River form an important connected landscape. Assess banks, grassland, scrub and wetland opportunities according to actual site evidence.
For a riverside proposal, coordinate ecology with flood risk, drainage and lighting. River-condition work depends on the affected habitat and metric rules, not simply a nearby blue line on a map.
Brentford, the Brent and Grand Union Canal
The Great West Corridor brings redevelopment alongside waterways, parks and established trees. Boston Manor Park and the Brent corridor provide a useful wider context for ecological connectivity.
Check the red-line interface, bank ownership and intended public realm before fixing landscape commitments. Where appropriate, scope River Condition Assessment evidence with the habitat survey.
Syon, Isleworth and the Thames
Syon Park SSSI and Thames-side habitats bring designated-site and water-environment questions. Potential effects can extend beyond the site boundary through disturbance, drainage or changes to habitat connections.
Use Natural England MAGIC mapping and current ecological records to identify receptors and pathways. BNG calculations do not replace protected-site or protected-species assessments.
Bedfont, Hanworth, Heston and Cranford
West Hounslow combines employment land, transport infrastructure, open spaces and varied habitats. The wider South West London Waterbodies SPA/Ramsar network also requires location-specific screening where relevant.
Neither an urban postcode nor a brownfield label proves a low biodiversity baseline. Survey before clearance and preserve dated evidence. Our BNG assessment and habitat survey service connects that baseline with feasible design options.
The February 2026 GiGL factsheet also records 897.4 hectares deficient in access to nature. Access, open-space coverage and habitat value are different measures. Use licensed records and current fieldwork for a particular site.
Borough action plan / London LNRS / mapped opportunities
Turn nature-recovery priorities into feasible proposals
Hounslow’s Nature Recovery Action Plan 2023–2028, published in March 2024, is a borough programme. London’s statutory LNRS, published in March 2026, supplies a separate regional spatial framework.
Read the project status as well as its name
The Hounslow Nature Recovery Action Plan identifies protection, connections, habitat creation and community involvement. It describes Clarke Way Wildlife Corridor in Heston as planned, while Crane Park re-naturalisation and Cranebank Meadows restoration are aspirational.
These proposals suggest practical questions about hydrology, access and long-term management. They do not establish completed restoration, a registered gain site or units available to buy.
Match LNRS measures to the actual habitat
Use the London LNRS and September 2026 spatial dataset alongside the statutory metric’s strategic-significance guidance. Check the relevant mapped measure, habitat and parcel; a general borough priority is not sufficient evidence for every uplift.
Potential measure locations and opportunity areas are not new protective designations. The public extract omits some data, so obtain fuller GiGL information where needed. Then test land control, suitability and a deliverable management plan.
The Green and Blue Infrastructure Strategy provides wider context for corridors and open spaces. Hounslow also publishes a 2026 biodiversity-duty report; its existence alone does not verify a specific gain allocation or habitat outcome.
A practical briefing tool
Seven checks before you commission the next stage
Use this checklist to brief the project team. It organises evidence and decisions; it does not automatically decide whether an exemption applies or calculate biodiversity units.
Record the site address, red-line area, application date and any earlier permission or section 73 variation. Check the relevant exemption and priority-habitat evidence.
Identify GB7 biodiversity matters, GB4 connections, GB5 waterways and any Green Belt, Metropolitan Open Land or open-space constraints.
Use current statutory designations, GiGL records and appropriate surveys. Consider impact pathways as well as direct overlap with a designated boundary.
Map UKHab habitats and assess condition at a suitable time. Record trees, hedgerows, watercourses, irreplaceable habitat and any relevant degradation history.
Compare the red line with London LNRS measures and borough action-plan evidence. Justify strategic significance using the applicable metric guidance.
Keep the statutory metric, separate UGF calculation, roof plans, drainage and landscape schedules consistent. Test realistic target condition and management access.
Identify any off-site shortfall, registration and allocation needs, Gain Plan timing, legal security, monitoring category and responsible habitat manager.
Start with the information already available. A clear boundary and planning history often reveal which surveys and design questions need attention first.
March 2026 committee evidence / proposed outcomes
What two Hounslow planning proposals show
Public committee reports offer useful design lessons. However, proposed metric results and committee recommendations do not prove that habitats have been established or that a Gain Plan has been discharged.
Former GSK campus, Great West Road
For 980 Great West Road, Brentford, application P/2025/2394, the 5 March 2026 report described proposed area-habitat gain of 75.34%. It separately reported 69.13% hedgerow gain and a UGF of 0.4.
The practical lesson is to keep those calculations distinct. The River Brent and Boston Manor Park context also requires a coherent ecological and landscape response. These are design-stage figures, not measured habitat delivery.
Central Park Estate, Staines Road
Application P/2024/4226 presented a different challenge. The same committee pack reported a proposed on-site loss of 21.97 area-habitat units, or 31.22%, and explored off-site provision.
The reported shortfall and proposed off-site totals require reconciliation in the final evidence. Therefore, do not treat the committee report as confirmation of purchased units or completed allocation. Check the final metric, conditions and legal arrangements.
Read the 5 March 2026 Planning Committee report pack for Items 4 and 5. Both examples concern independent public planning applications. No ACP involvement or completed biodiversity outcome is claimed.
Application evidence / permission / commencement
Submit the right documents at the right time
Hounslow’s published full-planning checklist includes older material. Its publication does not establish a new 2026 BNG validation rule. Confirm current local additions while meeting the applicable national requirements.
At the planning application stage
For an in-scope application, provide the applicability statement, pre-development biodiversity value, completed baseline metric and appropriate existing-habitat plan. Include relevant baseline dates, degradation and irreplaceable habitat information.
Coordinate separate ecology, species and tree evidence where required. Check the national minimum information, council validation gateway and application guidance for the actual proposal.
After permission, before starting works
The formal Biodiversity Gain Plan is a later statutory stage. It cannot be submitted before the day after permission and normally needs approval before commencement. An earlier design-stage draft does not discharge that condition.
Reconcile the permitted design, final metric, any registered allocation and management commitments. Our Biodiversity Gain Plan guidance explains that stage; use the official plan requirements for the submission.
Habitat match / location / registration / allocation
Finding suitable off-site biodiversity units
No buyer-ready Hounslow unit allocation was independently verified in the research. This does not mean no supply exists. Availability requires a current, habitat-specific offer and the relevant registered evidence.
Verify the site and the offer
Start with the official biodiversity gain-sites register. Check the boundary, habitat categories, legal security, management programme and recorded allocations. Then obtain dated confirmation of unsold units, price and reservation terms from the seller.
Compare the actual shortfall with trading and spatial-risk rules. A nearby reserve, council project or LNRS polygon is not evidence of saleable stock. Registration alone also does not establish today’s available quantity.
Follow the applicable delivery hierarchy
The August 2026 hierarchy changes affect qualifying non-major development. Read the current national guidance alongside adopted GB7; do not substitute emerging nearby-delivery wording for statutory rules.
Record any off-site allocation through the official allocation process. Significant on-site and off-site gains need appropriate long-term security and management, generally for at least 30 years. Our HMMP guidance explains the management evidence.
Statutory biodiversity credits are a separate last-resort route. Check the government credit schedule and applicable multipliers. Those prices are not private habitat-bank quotations.
Approved 11 November 2025 / effective 1 December 2025
Hounslow BNG monitoring charges and project costs
Hounslow publishes distinct monitoring categories for relevant Section 106 arrangements. Confirm the applicable category and any later changes with the council; these charges do not automatically apply to every development.
| Monitoring category | Scope and qualification |
|---|---|
| £8,157 per agreement | The listed category is a small, low-distinctiveness site with an upfront monitoring fee through a Section 106 agreement. Do not equate that wording automatically with Small Sites Metric eligibility or an exempt development. |
| £1,043 per agreement | The listed reduced-monitoring unilateral-undertaking category covers monitoring in Years 2 and 5. Confirm whether the council accepts that route for the actual site; it is not a universal optional discount. |
| Sites over 40 hectares | The schedule provides a bespoke fee based on expected officer time over 30 years. No flat price is stated for this category. Obtain a scheme-specific calculation. |
The 11 November 2025 Cabinet decision approved these fees from 1 December 2025. Read the original Appendix F schedule with the planning-obligations guidance. Other employment-skills charges in that appendix are not BNG fees.
Keep the other budget lines separate
Survey and metric work, Gain Plan preparation, legal drafting, habitat creation, long-term management and private units have separate scopes. Obtain quotations against the same habitat and delivery assumptions.
The April 2026 national schedule lists £309 for the relevant non-householder condition-approval route, distinct from borough monitoring. Check current national planning fees and our BNG costs guide. Do not treat a proposed future fee as an enacted charge.
Surveys / metric / Gain Plan / management
Discuss biodiversity net gain in Hounslow with ACP
Send the location, red-line boundary, proposal and planning stage. Existing ecology reports, landscape drawings and council advice help us identify a proportionate scope.
Our BNG consultants can bring baseline surveys, design options, metric calculations and delivery evidence together. For a live project, identify the next planning decision and the documents already available before commissioning further work.
For broader context, use the London BNG guide and England hub. Adjacent authority guides include Ealing, Hillingdon and Richmond upon Thames. A cross-boundary site needs each relevant authority and policy area checked.
Send your Hounslow project details →Local policy / evidence / monitoring
Hounslow BNG questions
These answers address recurring local decisions. Check the current documents and site history before applying them to a particular development.
Which Hounslow biodiversity policy is adopted?
GB7 in the Local Plan adopted in September 2015 is the main borough biodiversity policy. Read it with GB4, GB5 and the London Plan. The replacement 2020–2041 plan remains under examination as of 5 November 2026.
Is a small Hounslow site automatically exempt?
No. Check the application date, red-line area, planning route and priority-habitat effects against current national rules. Permission variations need their original consent checked. Separate species, tree and local ecology requirements can still apply.
Does UGF 0.4 mean 40% biodiversity gain?
No. Urban Greening Factor weights greening surfaces. The statutory biodiversity metric measures habitat value through separate accounts. A scheme can need both calculations, supported by consistent landscape and roof plans.
When does the council need the formal Gain Plan?
Where the statutory condition applies, the formal plan follows planning permission and normally needs approval before commencement. Application-stage baseline information remains necessary. An early draft discussed during design is not statutory condition approval.
Will every project pay the £8,157 monitoring fee?
No. The published category concerns qualifying small, low-distinctiveness sites with an upfront Section 106 monitoring arrangement. A separate £1,043 category covers certain reduced-monitoring unilateral undertakings. Ask the council which category and terms apply.
Can a Crane Valley restoration project supply BNG units?
Only if the proposed offer meets the relevant legal, registration, habitat and allocation requirements. A named nature-recovery project does not establish saleable stock. Verify the registered boundary, current available units, seller terms and compatibility with the development’s metric.
What does the Great West Road example demonstrate?
The March 2026 committee report gives separate proposed habitat and hedgerow gains alongside an Urban Greening Factor. It illustrates why the measures need independent evidence. Those planning figures do not prove established habitats or completed long-term monitoring.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Evidence register
Sources and review dates
Primary research reviewed 5 November 2026. Adopted policies, emerging proposals and projected planning outcomes are distinguished above. Public projects are independent examples, with no ACP involvement claimed.
Borough policy, nature and local evidence
Adopted Local Plan and policies maps
Local Plan Volume One — GB7, GB4 and GB5
Replacement Local Plan examination — current news
Emerging submission plan — draft policy only
Supplementary guidance and planning obligations
Published validation checklist gateway
GiGL factsheet — February 2026
Nature Recovery Action Plan — March 2024