Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Richmond upon Thames / Local planning guide

Biodiversity Net Gain in Richmond upon Thames

Biodiversity net gain in Richmond upon Thames connects statutory habitat calculations with Policy 39, river corridors and the adopted Biodiversity SPD.

From Twickenham and Whitton to Richmond, Kew, Barnes and Hampton, the site’s ecology shapes the evidence needed. ACP brings habitat surveys, metric assessments and Gain Plans together with practical planning and landscape decisions.

Reviewed 6 November 2026 · Local Plan adopted October 2025 · Biodiversity SPD adopted June 2026 · Published London LNRS

Current law / adopted policy / site evidence

Does your Richmond proposal need statutory BNG?

Qualifying planning permissions normally require at least 10% biodiversity gain. However, determine the legal scope before choosing a metric route or assuming the project needs off-site units.

Check the current exemption tests

For relevant applications from 6 August 2026, sites of 0.2 hectares or less can qualify for exemption. However, this does not cover development affecting on-site priority habitat. Assess the whole red-line site and the actual habitat effects.

Householder, de minimis and temporary-development exemptions have separate tests. Meanwhile, the general self-build exemption ended for relevant new applications. Earlier permissions and section 73 cases need transitional checks.

Keep ecology and statutory gain distinct

An exemption from the statutory gain condition does not remove every ecological planning requirement. For example, Policy 39, protected-species law, trees and river-corridor policies may still affect an exempt scheme.

Conversely, an in-scope proposal needs suitable habitat calculations even without an identified protected-species issue. Therefore, explain the legal route and the ecological assessment separately in the site brief.

Check the current government exemptions and our BNG exemptions guide. The statutory biodiversity metric tools were updated on 3 November 2026. Also check Small Sites Metric eligibility separately; site size alone does not establish it.

Local Plan 2024–2039 / adopted 7 October 2025

Which Richmond policies shape the application?

The adopted Local Plan and policies map provide the borough framework alongside the London Plan. In particular, Policy 39 addresses biodiversity and geodiversity, while connected policies protect rivers, trees and ecological networks.

Read the policies together, then apply them to the site
Policy or evidencePractical meaning
Policy 39 — Biodiversity and Geodiversity

Protect and enhance biodiversity, designated habitats and ecological connectivity. For statutory BNG, the adopted framework follows the national minimum 10% requirement where applicable. It does not impose the earlier draft blanket 20% target.

Policy 34 — Green and Blue Infrastructure

Consider how the proposal affects connected habitats, open spaces and river networks. For example, retain a useful link between gardens, trees and a nearby corridor rather than treating each planting area in isolation.

Policy 35 — Green Belt, Metropolitan Open Land and Local Green Space

Check the adopted designation and its land-use protections. However, a positive metric result does not overcome otherwise unacceptable harm to protected open land.

Policy 38 — Urban Greening

Integrate vegetation and suitable green surfaces into the design. Also calculate relevant Urban Greening Factor requirements separately from biodiversity units.

Policy 40 — Rivers and River Corridors

Assess ecological functions, riparian habitat and suitable buffers for an affected watercourse. Consequently, confirm the actual channel, bank and development impacts before fixing the layout.

Policy 42 — Trees, Woodland and Landscape

Coordinate tree retention, rooting space and landscape proposals with the habitat baseline. Moreover, metric units do not authorise protected-tree removal or irreplaceable-habitat damage.

Policy 43 — Floodlighting and Other External Artificial Lighting

Design lighting around relevant wildlife and dark corridors. For example, assess bat commuting and foraging where evidence identifies a potential impact, rather than inventing one borough-wide lighting limit.

Use the adopted Local Plan and policies map and full October 2025 plan. The Inspector’s report and MM66 explain the change from the proposed 20% target. Also check the relevant place strategy and allocation for the development land.

Biodiversity SPD / Trees and Development SPD / June 2026

What does the adopted SPD add?

Richmond adopted both SPDs on 9 June 2026. The Biodiversity SPD explains how ecological evidence informs site selection, design, submission, construction and later management. It supplements policy rather than creating a separate universal statutory gain condition.

Plan surveys before fixing the design

Use the SPD’s survey calendar and report guidance to identify suitable ecological work. For example, buildings, mature trees and rivers may require different survey methods and seasonal visits.

Bats, swifts, hedgehogs, badgers and stag beetles feature in the guidance. However, their inclusion does not require every site to undergo every species survey. Habitat features and likely effects determine a proportionate scope.

Connect enhancements with habitat outcomes

Green roofs, suitable planting, SuDS and nest or roost features can support ecological design. However, a swift brick or bat box is not automatically an area-habitat biodiversity unit.

Likewise, an attractive planting scheme needs realistic habitat classification, condition targets and maintenance. Coordinate the Trees and Development SPD where roots, canopies or replacement planting affect those outcomes.

Read the adopted SPD gateway and June 2026 Biodiversity SPD. Earlier consultation drafts and pre-adoption references do not establish the final requirements. Therefore, use the adopted documents when scoping the submission.

A practical briefing asset

Seven checks before commissioning the final documents

Use this checklist with the planning, ecology and landscape team. It brings Richmond’s policy and river context into one brief without assuming that every requirement applies to every site.

  • Record the red-line area, permission route, application date and priority-habitat effects. Then substantiate any exemption or transitional position.

  • Check the current Local Plan, site allocation and relevant open-land designations. Also assess biodiversity protections that remain on an exempt site.

  • Use records and site evidence to plan competent surveys. In addition, allow for survey seasons and coordinate tree and landscape information.

  • Identify the bank, reach and habitat effects. Then agree suitable buffer, condition-assessment and separate consent requirements where relevant.

  • Calculate the relevant habitat modules and Urban Greening Factor separately. Also explain protected-species mitigation and enhancements outside the unit calculation.

  • Match LNRS priorities to the proposed habitat. For off-site delivery, verify spatial risk, trading rules, legal security and actual available stock.

  • Programme the formal Gain Plan and qualifying management commitments. Finally, separate council monitoring, administration, consultancy, legal and unit costs.

Start with the boundary and proposal, even if other reports are not yet available. This checklist supports scoping; it does not determine an exemption or replace field evidence.

Thames / Crane / Beverley Brook / linked channels

How should a riverside scheme approach BNG?

Richmond’s river network includes the Thames, Crane, Beverley Brook and Duke of Northumberland’s River. However, proximity to a named river does not alone determine the metric scope, survey method or required setback.

Resolve these questions before fixing the waterside layout
Policy or evidencePractical meaning
Channel, bank and boundary

Locate the red line against the actual channel and bank. Also distinguish tidal reaches, non-tidal river habitats, canals and smaller channels; they do not necessarily use identical assessment methods.

Riparian habitat and buffers

Apply Policy 40 and the adopted SPD to the affected reach. Where constraints arise, discuss a suitable buffer and design response with the authority. Do not apply a draft-document distance as a universal statutory rule.

Watercourse metric and condition

Check whether the proposal engages the statutory watercourse module and the appropriate condition method. For example, an affected qualifying river or stream may need River Condition Assessment; a postcode does not establish that need.

Lighting, trees and water quality

Assess construction access, shading, vegetation, lighting and pollution pathways together. Consequently, an area-habitat gain elsewhere cannot substitute for avoiding unacceptable harm to the river corridor.

Consents and long-term access

Check separate environmental permits, landowner rights and maintenance access where relevant. In addition, ensure the habitat proposal remains deliverable after construction and through the secured management period.

Richmond’s 2026 biodiversity report records five river-restoration projects along the Crane, Duke of Northumberland’s River and Beverley Brook. It also reports water vole reintroduction to the Crane. These are nature-recovery examples, not evidence of units available for purchase.

Parkland / river corridors / urban habitats

Understand the ecological setting before calculating gain

GiGL’s February 2026 factsheet records 100 SINCs covering 2,891.5 hectares, or 49.2% of the borough. It also records 810.5 hectares of priority habitat. These are dated borough totals, not findings about an individual development plot.

Richmond Park, Ham and East Sheen

Parkland, mature trees and connected habitats make designation and impact-pathway checks important. For example, a nearby proposal may need to address lighting or habitat connectivity even where the site is largely developed.

However, a location name does not prove protected-habitat overlap or species presence. Use the adopted map, current records and competent site surveys before drawing conclusions.

Richmond, Kew, Barnes and Mortlake

The Thames corridor, gardens, urban trees and wetland settings create varied ecological relationships. Therefore, assess the actual links between a proposal and surrounding habitats, including relevant protected sites.

Kew Gardens and the London Wetland Centre are important local landscape assets. Nevertheless, their presence does not establish that every nearby scheme affects them or can obtain units from them.

Twickenham, Whitton and the Crane network

Check gardens, trees, watercourses and connections through developed neighbourhoods. In addition, examine how new lighting, access and boundary treatments affect retained habitat links.

Small or previously developed plots can still contain valuable habitat features. Therefore, test the baseline through evidence rather than assuming a cleared-looking site has zero biodiversity value.

Teddington, Hampton and Hampton Wick

Riverside and parkland contexts can place water, trees and designated open space at the centre of design decisions. Also check where the site boundary falls within borough and land-management arrangements.

Retained habitat, suitable planting and long-term care should work with the actual hydrology and use of the land. A generic meadow or wetland proposal may not suit the site.

The February 2026 GiGL factsheet also reports 302.7 hectares deficient in access to nature. Meanwhile, the council reports 40 new SINCs and nine upgrades through the new plan. Different dates and counting methods mean these figures should not be combined as a simple running total.

London Plan G1 / G5 / G6 / G7 / published LNRS

Use London’s framework alongside borough evidence

London Plan policies address green infrastructure, urban greening, biodiversity and trees. Richmond’s local policies add borough detail. Therefore, use both levels while keeping their different measures and purposes clear.

Urban Greening Factor is a separate measure

London Plan G5 applies to relevant major development. Its interim targets are 0.4 for predominantly residential schemes and 0.3 for predominantly commercial schemes, excluding B2 and B8 uses.

UGF measures weighted green surfaces; it is not a biodiversity percentage. However, the same design may support both systems if its habitat quality and long-term management are credible.

Use the published London LNRS

London published its Local Nature Recovery Strategy on 9 March 2026. Public spatial data followed, including the September release. Therefore, older council references to a pending strategy need updating.

Check mapped priorities against the actual habitat proposal when considering strategic significance. However, LNRS opportunity areas do not automatically create protected-site designations, registered units or permission to restore another owner’s land.

Use the London Plan, GLA urban greening guidance, published LNRS and London LNRS spatial data. Some ecological records require licensed access. Also check current habitat type, location and measure compatibility before applying metric strategic-significance inputs.

Official reporting / 12 February 2024–5 November 2025

What do Richmond’s first approved Gain Plans show?

The council’s reporting workbook records 15 permissions requiring statutory BNG and four approved Biodiversity Gain Plans for this period. All four approved plans proposed on-site delivery. However, that does not mean all borough development must deliver entirely on site.

Approved planned gains in the council reporting workbook
Reported measureWhat the evidence establishes
Four approved Gain Plans

All four proposed on-site units only. No off-site units or statutory credits were recorded for those approved plans during the stated period.

Area habitats: 2.4728 → 3.203297 units

The planned increase was 0.730497 area-habitat units, approximately 0.73. This represents a 29.54% aggregate uplift. It is not an independently calculated average of four individual project percentages.

Hedgerows: 0.032 → 0.21921 units

The separate planned increase was 0.18721 hedgerow units, approximately 0.19. However, hedgerow and area-habitat units are different accounts and should not be added as interchangeable units.

Monitoring had not yet been required

The council said it had not yet needed to conduct monitoring and intended to use Mycelia software. Consequently, these figures do not demonstrate established habitats or successful 30-year outcomes.

See the official biodiversity statistics workbook and statutory biodiversity report. The reporting period ends on 5 November 2025; it is not a live inventory of November 2026 decisions. No ACP involvement is claimed. The practical lesson is to distinguish approved targets, absolute units and later monitoring evidence.

Application evidence / formal approval / management

Which documents belong at each planning stage?

Richmond’s applicant guidance asks for evidence supporting an exemption and recommends early design information for in-scope proposals. However, distinguish national application requirements, local recommendations and the later formal Gain Plan.

Before and with the application

Establish the legal route, competent habitat baseline and relevant ecological constraints. For an in-scope proposal, provide the national minimum information, current metric evidence and an accurate pre-development habitat plan.

The council strongly recommends pre- and post-development calculations and a scaled proposed-habitat plan. In addition, coordinate species, trees, rivers and lighting evidence where the actual scheme requires it. An exempt application should explain and substantiate its exemption.

After permission and before commencement

The formal Biodiversity Gain Plan normally follows planning permission and needs approval before development starts. Therefore, align the final habitat design, metric, management and any off-site allocation with the consent.

Secure qualifying significant on-site and off-site gains for at least 30 years through suitable mechanisms. Also identify management, monitoring and remedial responsibilities. Phased schemes and historic permissions need their own checks.

Read the council BNG application guidance with current national law: its 3 June 2026 update predates the August changes. The adopted Biodiversity SPD adds ecological detail. Our BNG process guide and habitat management and monitoring guidance explain the wider sequence.

Metric shortfall / registered land / actual supply

Can you buy off-site units for a Richmond proposal?

Off-site delivery can help address a genuine habitat shortfall where the applicable framework allows it. First establish the deficit, development category and trading rules. Non-major hierarchy treatment changed in August 2026, so avoid assuming every scheme follows an identical route.

A habitat-bank study is not available stock

Richmond’s biodiversity report says the council commissioned a viability study into habitat banking on its land. However, that does not establish a registered site, unsold units, a confirmed seller or a current price.

No buyer-ready Richmond offer was independently verified for this guide. This is an evidence limit, not proof that supply does not exist. Likewise, a park, restoration project or LNRS opportunity is not automatically a unit bank.

Check habitat, location and legal allocation

Use the official gain-sites register to examine registered land and recorded allocations. Then obtain dated operator confirmation of remaining units, delivery assumptions, legal security and price inclusions.

Apply the actual spatial-risk and habitat-trading rules to the shortfall. Area habitats, hedgerows and watercourses remain separate accounts. Consequently, the nearest offer is not necessarily suitable or sufficient.

Complete the required allocation to the development and ensure the Gain Plan reflects it. Government statutory credits are a separate last-resort option. Neither council monitoring fees nor an unregistered conservation donation purchases compliant off-site units.

Council charges / professional scope / habitat delivery

What do Richmond’s published BNG fees cover?

The council publishes specific major and minor BNG monitoring charges. They are separate from ecological consultancy, the Gain Plan administration fee and habitat-unit purchases. Therefore, confirm the scheme’s category and legal monitoring arrangements before building the budget.

Published charges and other cost categories
Cost categoryScope and qualification
Council BNG monitoring — major: £13,611

Published on the council fees page updated 3 June 2026. The figure includes VAT and is subject to indexation. Confirm the applicable charge and obligation for the actual scheme.

Council BNG monitoring — minor: £7,055

Also VAT-inclusive and subject to indexation. However, this is not an automatic fee for every minor or exempt householder proposal, nor the price of an ecology report.

Separate Section 106 monitoring: £155/hour

The council lists this as a different hourly charge. Do not automatically add it to the flat BNG monitoring fee; establish the agreement and charging basis first.

National condition-approval administration

The April 2026 schedule lists £309 for the relevant non-householder route. Nevertheless, confirm the prescribed fee at submission. This is different from consultant preparation and council long-term monitoring.

Surveys, metric, Gain Plan and management documents

Scope the work around habitat complexity, access, survey seasons and design information. Also identify tree, species and watercourse inputs where relevant. No fixed ACP project price is assumed.

Habitat creation, legal security and off-site supply

Allow for establishment, management, monitoring and remedial work over the secured period. For units, obtain a current habitat-specific quotation and confirm legal, allocation and management inclusions.

Check the current Richmond fees page, planning obligations guidance and national fee schedule. The council adopted its Planning Obligations SPD on 26 March 2026. Our BNG costs guide explains how the different budget categories fit together.

Site-specific scope / coordinated ecological evidence

Discuss biodiversity net gain in Richmond upon Thames

Send the red-line plan, proposal, planning stage and any existing ecology or landscape reports. Also identify river frontage, mature trees, known designations and survey deadlines so the next step addresses the actual planning decision.

ACP’s BNG assessments establish habitat and metric evidence. Our Biodiversity Gain Plan support connects the final design with approval and delivery. Speak to our BNG consultants about a coordinated scope.

For the strategic framework, see the London BNG guide. Nearby authority guides cover Hounslow, Kingston upon Thames, Hammersmith and Fulham and Wandsworth. However, the actual boundary determines the planning authority; neighbouring policies do not automatically govern Richmond land.

Send your site details to ACP →

Current policy / rivers / monitoring / delivery

Richmond BNG questions

These answers address local planning and delivery decisions. Use current source documents and site evidence when agreeing the project scope.

Does Richmond require 20% biodiversity net gain?

The earlier draft proposed a blanket 20% target, but examination changed it. The adopted October 2025 Local Plan follows the national minimum 10% framework where statutory BNG applies. However, legal exemptions and wider local ecological requirements remain distinct.

Is the Richmond Biodiversity SPD still a draft?

No. Richmond adopted the Biodiversity SPD on 9 June 2026, alongside the separate Trees and Development SPD. Therefore, use the adopted documents rather than the February consultation draft or older statements that guidance was still being prepared.

Do small exempt sites still need ecology evidence?

They can. A statutory BNG exemption does not remove protected-species duties or relevant Policy 39, tree and river requirements. Also provide suitable evidence for an exemption claim. The site’s features and likely effects determine the ecological survey scope.

Does every riverside proposal need a River Condition Assessment?

No. First identify the affected watercourse, development boundary and relevant metric scope. Then agree the appropriate condition method and other evidence. Policy 40, suitable buffers and separate environmental consents may also matter; proximity alone does not settle these questions.

Are council monitoring fees the same as consultant costs?

No. Richmond publishes BNG monitoring charges of £13,611 for major and £7,055 for minor schemes, including VAT and subject to indexation. Confirm applicability to the project. These charges are separate from professional reports, administration, legal work and unit purchases.

Do the council’s four approved Gain Plans prove successful habitat delivery?

No. The workbook for 12 February 2024 to 5 November 2025 records four approved plans, all proposing on-site gains. The council had not yet needed to undertake monitoring. Therefore, the figures describe approved planned gains, not confirmed habitat establishment or 30-year outcomes.

Can Richmond’s habitat-bank study supply units now?

The study indicates investigation of possible council-land delivery. It does not establish registered sites, available stock or current prices. Therefore, verify the actual register entry, suitable unallocated units, legal security and development allocation before relying on any offer.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.