Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Hammersmith & Fulham / Local planning guide

Biodiversity Net Gain in Hammersmith and Fulham

Biodiversity net gain in Hammersmith and Fulham starts with your site boundary, habitat baseline and planning authority.

From White City redevelopment to Fulham’s riverside sites, connect the ecology evidence with the right adopted policies. Then coordinate biodiversity units, urban greening and long-term habitat delivery.

Evidence reviewed 5 November 2026 · Adopted policy, emerging plans and dated outcomes distinguished

Application route / date / habitat impacts

Does your development need statutory BNG?

First, establish the application date, permission route and red-line area. An urban location or small footprint alone does not settle the ecological work required.

Check the current exemption rules

For relevant applications from 6 August 2026, development on sites of 0.2 hectares or less can qualify for exemption. However, this exemption does not apply if development decreases the value of on-site priority habitat.

The separate self-build exemption ended for new applications from that date. Therefore, check current government exemptions and transitional rules, including earlier permissions and variations.

Separate the two planning stages

Non-exempt development normally requires at least 10% gain using the statutory biodiversity metric. At application stage, provide the required baseline and proposed approach.

After permission, the Biodiversity Gain Plan normally needs approval before development begins. In addition, secure qualifying significant on-site enhancements and off-site gains for at least 30 years.

Read older council summaries alongside current law

The council’s BNG webpage still mentions the former self-build exemption. Therefore, use the updated national rules for eligibility and the council page for its submission expectations.

Nevertheless, BNG exemption does not remove protected-species duties, tree controls or designated-site safeguards. Our BNG exemptions guide helps separate these questions.

Red-line boundary → authority → evidence

Which planning authority and evidence apply?

A Hammersmith and Fulham postal address is not enough. Instead, locate the development boundary against the formal authority and adopted policy maps.

A practical authority and biodiversity evidence check
Policy or evidenceWhat it means for your site
Most of Hammersmith & Fulham

Start with H&F Council and its adopted 2018 Local Plan outside the OPDC planning area. Then check site allocations, relevant supplementary guidance and the current validation list.

Open the council’s planning-policy gateway.

Designated Old Oak and Park Royal area

OPDC has its own planning authority role and adopted 2022 Local Plan. Consequently, do not assume the H&F Local Plan governs every site in the geographic borough.

Check the OPDC Local Plan and policy maps. For a boundary-crossing proposal, discuss responsibilities with the relevant authorities.

Habitats and protected-site layers

Overlay current SINC, reserve, habitat and ecological-record information with the red-line plan. However, borough totals cannot establish a designation or species finding on your plot.

Combine the desk study with a proportionate BNG assessment and habitat baseline survey.

Nature recovery and delivery

Check the published London LNRS measure, mapped location and habitat fit. Then apply the statutory metric’s strategic-significance rules with recorded evidence.

Finally, verify any off-site parcel, legal security and allocation separately. Neither a nature-recovery opportunity nor a public park is proof of units for sale.

National requirements / London Plan / relevant Local Plan

Local biodiversity policies and what they mean

The adopted H&F Local Plan dates from 2018; OPDC adopted its separate plan on 22 June 2022. London Plan policies apply alongside the relevant local framework.

Adopted policy, supplementary guidance and emerging proposals
Policy or evidenceWhat it means for your site
H&F OS4 — Nature Conservation

OS4 addresses nature conservation, including designated sites, habitats, species and ecological connections. Therefore, assess retained habitats and effects on the surrounding network before fixing the layout.

Use the adopted Local Plan and mapped designations. A positive metric result does not override habitat or species protection.

OS5 — Greening the Borough

OS5 concerns the borough’s greening and green infrastructure. In practice, coordinate trees, gardens, living roofs and planting with realistic soil, structure and maintenance requirements.

Also consider OS1 and OS2 where protection of, or access to, parks and open spaces is relevant. These policy matters remain distinct from biodiversity-unit accounting.

Climate Change SPD — adopted 2023

The adopted Climate Change SPD supports climate adaptation and greener development. For example, integrate drainage, shading and habitat opportunities early in design.

However, supplementary guidance does not establish a new universal statutory BNG percentage or displace national exemptions.

London G1, G5, G6 and G7

These policies cover green infrastructure, urban greening, biodiversity and trees. Consequently, relevant schemes need coordinated evidence across several planning tests.

Read London Plan Chapter 8 alongside the applicable local policies.

OPDC SP8 — Green Infrastructure and Open Space

Within OPDC’s designated area, review SP8 and the relevant adopted site policies. In particular, explain how open space and ecological connections relate to the wider regeneration framework.

Use the OPDC plan rather than transferring H&F policy numbers into a different development-plan area.

The replacement H&F Local Plan is emerging

On 6 July 2026, Cabinet approved a Regulation 19 draft for six-week consultation and authorised future submission. However, that decision is not adoption of a replacement plan.

Check the July 2026 Cabinet decision and current examination programme before assessing emerging policy weight. No unverified draft policy number or higher mandatory BNG percentage is presented here.

Two measures / one coordinated design

BNG and urban greening need separate calculations

A green-looking scheme can still have a biodiversity-unit shortfall. Likewise, meeting the statutory gain percentage does not settle urban greening or open-space policy.

Biodiversity units

The statutory metric measures habitat value using area or length, habitat type, condition and relevant risk factors. In addition, area habitats, hedgerows and watercourses have separate accounts and trading rules.

Use the current statutory metric tools and record the version. The November 2026 update is version 1.1.0; do not describe the older non-statutory Metric 4.0 as the current tool.

Urban Greening Factor

UGF scores weighted green cover and surface treatments. London Plan G5 generally sets targets of 0.4 for predominantly residential and 0.3 for predominantly commercial major development, subject to applicable policy.

Therefore, prepare the separate UGF assessment where required. Reconcile roof layouts, solar panels, trees and drainage without treating a UGF score as biodiversity units.

Wormwood Scrubs / Thames / urban connections

Local habitats and nature-recovery priorities

H&F’s March 2026 biodiversity report records 33 SINCs covering 260.9 hectares and two Local Nature Reserves at Wormwood Scrubs. However, these dated borough figures are not a survey of your site.

Wormwood Scrubs and northern connections

The report describes grassland, meadow, scrub and habitat management at Wormwood Scrubs. It also records the central meadow’s designation as a second Local Nature Reserve in April 2025.

For nearby development, investigate connectivity, lighting, access and habitat effects. However, the ecological masterplan and HS2-funded improvements do not establish a commercial habitat-bank offer.

Thames and Fulham riverside

The tidal Thames, riverside vegetation and mature trees influence ecological scope around Hammersmith, Sands End and Fulham. Therefore, assess actual impact pathways and the relevant river setting.

On former industrial land, also coordinate remediation, drainage and planting feasibility. A proposed wet feature is not automatically a suitable or deliverable high-value habitat.

White City, parks and urban planting

White City redevelopment may depend on roofs, courtyards and street trees. Meanwhile, Ravenscourt Park, Bishops Park, Eel Brook Common and smaller green spaces provide wider ecological context.

Assess retained trees, soil volumes and links beyond the site. In addition, confirm that roof structure, water supply and maintenance can support the habitat assumptions.

London’s published LNRS

London published its statutory Local Nature Recovery Strategy in March 2026. The spatial dataset contains areas important for biodiversity, recovery opportunities and potential measure locations.

However, the open dataset omits some information; project work may need fuller licensed data. Use mapped priorities to inform design and strategic significance, rather than automatically assigning a higher metric score.

The council report was prepared in December 2025, when London’s LNRS was still forthcoming. Therefore, read its dated ecological evidence alongside the published London strategy.

Public council evidence / dates and delivery stages

What local planning evidence actually shows

Two council examples show why proposed calculations, approved plans and delivered habitat must remain distinct. Neither example is presented as ACP’s work.

Planning-stage scores and approved plans are different evidence
Policy or evidenceWhat it means for your site
Sands End — application 2025/02143/FR3

The 20 January 2026 committee considered 38 homes between Sandilands Road and Pearscroft Road. Officers reported a proposed UGF of 0.51 against the 0.40 residential benchmark.

However, the report considered BNG and habitat-management matters separately. Therefore, coordinate roof coverage, planting and biodiversity evidence before relying on either design score.

The committee resolved to authorise permission subject to a legal agreement. That is not proof of final permission, Gain Plan discharge or completed habitat. Read the officer report and committee record.

Council BNG dataset — to 5 November 2025

Table 6 of the March 2026 duty report records 27 eligible applications in its reporting window. It also records one approved Biodiversity Gain Plan, with planned on-site habitat gain of 11.24% and hedgerow gain of 14.55%.

These are separate metric accounts. Moreover, the historical cutoff means this is not a current 2026 approval count or evidence of established habitat.

The reported median application-stage habitat gain was 34.34%. However, percentages depend on the baseline; review absolute units, feasibility and delivery stage as well. Inspect Table 6 and its reporting scope.

Full spreadsheet / habitat plans / version trail

What H&F asks applicants to provide

The council’s developer guidance gives specific document expectations. First, confirm that H&F is the deciding authority; OPDC sites need the appropriate OPDC validation requirements.

Application-stage evidence

For an in-scope application, the council asks for the completed metric spreadsheet in Excel. A summary or headline gain percentage does not suffice.

It also lists a site-boundary plan and existing/proposed habitat plans as GIS shapefiles. Include relevant irreplaceable-habitat information and any required evidence about earlier habitat loss.

Approval and habitat delivery

Where the statutory gain condition applies, obtain Gain Plan approval before commencement. Then align the approved drawings, metric, legal arrangements and any registered off-site allocations.

For significant on-site enhancements or off-site gains, address the required long-term security and management evidence. However, do not assume that every exempt small scheme needs a 30-year HMMP.

Use the council’s BNG developer guidance with its current application and validation requirements. Check the current attachment/version at submission; this guide does not invent a separate “2026 BNG checklist”.

Retention / matching units / separate cost categories

Off-site delivery and BNG costs in Hammersmith and Fulham

First, model feasible retention, enhancement and habitat creation. Then identify the actual unit shortfall, habitat account and trading rules before seeking an off-site solution.

Follow the applicable gain hierarchy

H&F encourages local on-site delivery and locally located off-site options. However, distinguish that preference from the amended statutory hierarchy for qualifying minor schemes.

Use the current national planning guidance for the legal sequence. Statutory credits remain a last resort, rather than a routine substitute for an off-site unit search.

Verify supply before relying on it

No current unsold, legally allocatable H&F habitat-bank stock was verified in this research. However, this does not establish that suitable regional supply is absent.

Start with the official gain-sites register. Then confirm the parcel, legal agreement, management, habitat type, allocation, spatial risk and remaining stock with the operator.

Separate the professional, statutory and habitat-delivery costs
Policy or evidenceWhat it means for your site
Council monitoring and legal arrangements

No single current fixed H&F BNG monitoring tariff was established. Therefore, obtain the scheme-specific monitoring, administration and legal requirements from the deciding authority.

Do not treat those contributions as a consultant’s assessment fee or a biodiversity-unit price.

National condition-approval fee

The April 2026 national schedule sets £309 for a non-householder condition-approval request, including a relevant biodiversity gain condition. However, fees can change after this guide’s 5 November review.

Check the published fee schedule for the payment date. A consultation proposal is not evidence that a new charge has commenced.

Surveys, plans and long-term management

Survey scope, seasonal evidence, metric complexity and design changes affect professional costs. In addition, budget for establishment, monitoring, reporting and remedial management where required.

Our BNG costs and pricing guide distinguishes these work stages from unit purchases.

Private units and statutory credits

No verified H&F unit price is quoted here. Instead, obtain a dated habitat-specific offer and check what legal, management and allocation costs it includes.

Government statutory credit prices are a separate cost category. Neither private units nor credits are a general price per hectare of development.

Six practical checks / one consistent evidence trail

Prepare your H&F planning submission

Use this checklist to organise the evidence and responsibilities. However, site-specific advice and the deciding authority’s current validation requirements remain essential.

  • Record the red-line boundary, planning route and application date. Then identify H&F or OPDC and test current exemption and transitional rules.

  • Gather habitat and condition surveys, ecological records and scaled plans. In addition, assess relevant trees, protected species, designated sites and irreplaceable habitats.

  • Use the applicable statutory metric and full spreadsheet. For H&F submissions, address the listed GIS boundary and habitat plans; also check current validation requirements.

  • Align the metric, habitat plans, UGF assessment, roof drawings and drainage. Therefore, resolve inconsistent areas or assumptions before submission.

  • Where the condition applies, obtain approval before development begins. Then complete the required legal security, off-site allocations and management evidence.

  • Identify the landowner, manager, funding and reporting arrangements. Finally, retain the survey, metric, drawing and approval versions used to secure the required gains.

For the wider sequence, see our step-by-step BNG process. Early coordination can reduce conflicting plans and avoidable redesign.

Proportionate surveys / metric / planning support

Bring your site evidence together

Send the site location, red-line plan, proposal and planning stage, with any existing ecology or landscape documents. We can then scope the work needed for your project.

A BNG assessment establishes the habitat baseline and metric evidence. After permission, coordinate the Biodiversity Gain Plan and Habitat Management and Monitoring Plan where required. Our BNG consultants can help resolve gaps between these stages.

For wider policy context, use BNG in London. For neighbouring sites, see Ealing, Hounslow and Kensington and Chelsea. Across the Thames, consult the Wandsworth guide; authority boundaries and local policies differ.

Discuss your Hammersmith or Fulham site →

Authority / greening / delivery

Hammersmith and Fulham BNG questions

These answers distinguish national requirements, local policy and project-specific evidence. Use the relevant body sections and primary sources for the underlying context.

Does H&F Council decide every application in the borough?

No. OPDC is the planning authority within its designated Old Oak and Park Royal area. Therefore, check the red-line boundary against the formal authority map before choosing a Local Plan or validation list.

Does the emerging Local Plan create a higher BNG target?

The July 2026 Cabinet decision authorised consultation on a draft replacement plan. However, that is not adoption. The reviewed evidence does not establish a new blanket adopted borough requirement above the national 10% minimum.

Can a 0.51 Urban Greening Factor prove 10% BNG?

No. UGF measures weighted green cover, while the statutory biodiversity metric measures habitat value and gain. Therefore, prepare separate calculations where both planning tests apply, using consistent drawings.

Do sites of 0.2 hectares or less still need ecology evidence?

They can. A relevant statutory exemption does not remove protected-species duties, tree controls or designated-site safeguards. In addition, assess on-site priority-habitat impacts and the application date before relying on the exemption.

Are biodiversity units currently available at Wormwood Scrubs?

The reviewed evidence does not establish currently available units there. An ecological improvement programme or reserve designation is not a sale offer. Instead, verify registered land, legal security, allocations and operator availability before relying on a supply claim.

When should a Biodiversity Gain Plan be approved?

Where the statutory gain condition applies, approval normally follows planning permission and must precede commencement. However, the initial application already needs the required biodiversity information; do not postpone all ecological evidence until the Gain Plan stage.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.