Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Kensington and Chelsea / Local planning guide

Biodiversity Net Gain in Kensington and Chelsea

Biodiversity net gain in Kensington and Chelsea needs a clear response to adopted Policy GB14, urban habitat constraints and the actual planning route.

ACP connects habitat surveys, statutory metric assessments and Gain Plans with feasible site design. From roof and courtyard proposals to Chelsea Creek and Kensal Canalside, the evidence must reflect the habitats and policies that apply.

Reviewed 5 November 2026 · Local Plan adopted July 2024 · Current national BNG rules · Source-dated planning examples

National legislation / local policy / planning history

Does your proposal need statutory BNG?

Qualifying development normally needs at least 10% biodiversity gain. However, establish the applicable exemption and permission history before treating the statutory gain condition as a requirement.

Check the current small-site rules

For relevant applications from 6 August 2026, sites of 0.2 hectares or less can qualify for exemption. That exemption does not cover development that reduces on-site priority habitat value. Use the full red-line boundary, not just the proposed building footprint.

The general self-build exemption also ended for new applications from that date. Earlier permissions and variations need their transitional position checked. Read the current national exemptions and our BNG exemptions guide.

Keep RBKC’s planning expectations in view

An exemption from the statutory condition does not remove separate biodiversity, protected-species, tree or landscape requirements. Policy GB14 sets an adopted local planning framework that applicants must consider on its own terms.

Equally, local policy does not cancel national exemptions or automatically impose a formal statutory Gain Plan on every small project. Explain the legal scope and local design response separately.

Use the current Statutory Biodiversity Metric tools, updated on 10 November 2026. Record the chosen version and check Small Sites Metric eligibility. The older Biodiversity Metric 4.0 terminology is not the correct starting point for a new statutory assessment.

Local Plan 2024 / GB14 / connected green and blue infrastructure

What Policy GB14 means for your development

The Royal Borough adopted its Local Plan on 24 July 2024. GB14 Green and Blue Infrastructure combines greening, ecology and waterways requirements, with distinct provisions for different development contexts.

GB14: the policy parts applicants should distinguish
Policy or evidenceWhat it means for your site
I and J — On-site gain and alternatives

Part I seeks at least 10% on-site biodiversity net gain for relevant development, including major schemes. Part J requires a robust demonstration where that cannot be achieved, before considering adequate alternative-site provision or last-resort credits.

Set out feasible design options and their constraints. This adopted local policy is distinct from the statutory condition and the August 2026 hierarchy for qualifying non-major development.

F, G and H — Sites, connections and EcIA

Protect the biodiversity of SINCs on or adjacent to the site and consider opportunities to connect green corridors. Part H requires a site-specific Ecological Impact Assessment for all major development.

A metric workbook does not replace an EcIA or a protected-species assessment. Scope those tasks around actual effects, survey seasons and design decisions.

K and L — Thames strategy and waterways

Part K requires a Biodiversity Net Gain Strategy for development adjacent to the River Thames. Part L addresses proposals beside the Thames, Chelsea Creek and Grand Union Canal.

Coordinate biodiversity, heritage, appropriate access and other waterway uses. Do not extend the Thames-specific strategy requirement automatically to every inland or canal-side plot.

C and D — Urban Greening Factor

Major residential development should achieve UGF 0.4; major non-residential development should achieve 0.3. These are weighted greening scores, separate from the statutory habitat-unit calculation.

Read the adopted plan and policies-map gateway and Local Plan GB14, pages 162–168. The St Quintin and Woodland’s and Norland neighbourhood plans add local detail within their mapped areas.

Coordinate the supporting policies

GB12 addresses sustainable drainage, GB15 parks and open spaces, and GB16 trees. GB10 also matters when lighting could affect wildlife. Retained habitat, drainage, roof design and construction protection should agree across the drawings.

Use the council’s supplementary planning guidance, including its Greening SPD, where applicable. An SPD supports the adopted plan; it is not a separate national BNG exemption test.

A practical site briefing tool

Seven checks before fixing your biodiversity strategy

Use this checklist to brief the architect, ecologist and planning team. It brings together the main evidence layers without treating a postcode or site size as a complete planning answer.

  • Record the application route and date, red-line area, priority-habitat effects and any earlier permission. Identify the legal basis for an exemption where relevant.

  • Use GB14 I/J and the actual habitat baseline to assess feasible retention and creation. Explain constraints and alternatives rather than starting with an assumed off-site purchase.

  • Check current records and adopted boundaries. Major development needs the GB14 H EcIA; other survey requirements depend on affected habitats and species.

  • For Thames-adjacent development, address GB14 K. At Chelsea Creek or the Grand Union Canal, assess the actual Blue Ribbon Network interface and relevant watercourse evidence.

  • Coordinate roofs, trees, drainage and planting. Retain distinct area-habitat, hedgerow and watercourse calculations, plus the separate UGF score where required.

  • Read the spatial strategy alongside its priorities. Justify habitat-specific strategic significance and obtain fuller data where the public extract is insufficient.

  • Identify the formal Gain Plan timing, management responsibilities, any registered unit allocation and separate costs. Secure qualifying gains for the required period.

Start with the site boundary, planning history and existing reports. The guide supports scoping; it is not a field survey, formal applicability decision or assurance of available biodiversity units.

London Plan G1 / G5 / G6 / G7

Make greening work across the design

The London Plan 2021 provides the strategic layer alongside RBKC’s Local Plan. G1 concerns green infrastructure, G5 urban greening, G6 biodiversity and G7 trees and woodland.

Roofs, courtyards and retained trees

Compact sites need realistic habitat proposals. Check substrate depth, drainage, sunlight, maintenance access and compatibility with solar panels, fire requirements and structural capacity.

Retain useful habitat before allocating new planting. A courtyard may face shading, servicing or public-access pressures. Therefore, test the intended habitat condition against how the space will actually function.

Separate UGF from the statutory metric

UGF weights different green surfaces. Use the GLA UGF guidance with RBKC GB14 C/D and consistent landscape schedules. A score of 0.4 does not mean 40% biodiversity net gain.

The statutory metric considers habitat type, extent, condition and relevant risks. Bird or bat features can add ecological value without generating area-habitat units. Keep species measures, habitat accounts and UGF results clear.

Read the London Plan’s green-infrastructure policies when coordinating the wider response. A high planting score cannot substitute for avoiding significant effects on a protected habitat or species.

GiGL February 2026 / local networks / site-level assessment

Habitats and ecological connections across the borough

GiGL’s February 2026 factsheet records 24 SINCs covering 151.5 hectares, or 12.2% of the borough. It also records 1.8 hectares of priority habitat. These are borough-wide summaries, not findings about an individual development plot.

Chelsea Riverside, Lots Road and the Creek

The Thames and Chelsea Creek bring tidal habitat, banks and waterfront redevelopment into the planning assessment. The River Thames and Tidal Tributaries Metropolitan SINC forms part of this ecological context.

Identify the precise habitat boundary and possible effects from lighting, drainage or works. On a constrained frontage, ownership and the length of watercourse assessed can shape what enhancement is feasible.

Kensal Canalside and North Kensington

The Grand Union Canal connects habitat through a varied urban landscape. Redevelopment can affect vegetation, shade, lighting and the interface between new public space and water.

A brownfield label does not establish a low biodiversity baseline. Survey existing habitats before clearance. Where ground conditions constrain planting, coordinate ecology with remediation and landscape design.

Holland Park, gardens and mature trees

Holland Park, Brompton Cemetery, Chelsea Physic Garden and smaller garden spaces provide different habitat settings. Trees and vegetation can connect places that appear separate on a development plan.

Check the actual designation, ownership and boundary rather than treating all green space alike. Kensington Gardens also requires careful borough-boundary checks. Our BNG assessment and habitat survey service establishes site-specific evidence.

Earl’s Court and cross-boundary redevelopment

The Earl’s Court Opportunity Area spans RBKC and Hammersmith and Fulham. Large proposals must coordinate authority boundaries, retained habitat, landscape delivery and long-term management.

An allocation supports investigation of development opportunities; it does not settle the ecological baseline or approve a gain strategy. Keep each authority’s requirements and the scheme-wide habitat accounts traceable.

Use the February 2026 GiGL factsheet, current licensed records, adopted mapping and Natural England MAGIC where relevant. Open-space, garden and SINC areas can overlap; do not add them together or treat them as saleable habitat-bank land.

Borough action / London LNRS / mapped habitat measures

Connect local nature recovery with deliverable improvements

RBKC’s Biodiversity Action Plan 2022–2027 and London’s statutory LNRS have different roles. The borough programme supports local action; the London strategy provides a wider spatial framework.

Learn from actual borough projects

The March 2026 Enhanced Biodiversity Duty Report describes 3,600 square metres of grassland restoration at Little Wormwood Scrubs. It also records 79 Bee Superhighway hotspots and planting at Emslie Horniman Park.

Notting Dale’s environmental programme includes trees, garden improvements, rain gardens and SuDS. These examples show practical forms of urban enhancement. They do not establish registered units for a developer to purchase.

Use the published London strategy

The London LNRS was published in March 2026. Its public spatial dataset was updated in September. Read mapped measures alongside the strategy’s priorities and the habitat proposed.

Opportunity areas are not new protective designations. The open extract omits some information, so obtain fuller GiGL data where needed. Apply the metric’s strategic-significance guidance to the actual parcel and habitat.

The council’s March 2026 report sets a target of 80% of SINCs in positive management by 2027. That is a future target, not proof it has already been achieved. Find the borough programme through its biodiversity guidance.

GB14 K/L / separate watercourse account / feasible works

Thames and Chelsea Creek: assess the water separately

A successful area-habitat calculation does not automatically resolve a watercourse shortfall. This distinction matters where a development affects banks, riparian land or the waterway itself.

Define the actual scope of the strategy

For a Thames-adjacent proposal, GB14 K calls for a BNG Strategy. Map the development boundary, relevant frontage and ecological effects. Coordinate flood defence, river access and other necessary consents with the habitat proposals.

At Chelsea Creek and the Grand Union Canal, apply the relevant Blue Ribbon Network provisions. A waterside address alone does not establish every survey or metric module required.

Check land control and achievable condition

Improving a watercourse may involve land beyond the application boundary. Establish who can authorise and maintain the works, and whether the proposal changes the metric’s assessed condition.

Where the project requires it, scope River Condition Assessment evidence with the ecologist. Avoid promising an uplift from bank planting before the relevant rules and habitat evidence support it.

Independent public applications / planning-stage evidence

Two RBKC examples with different BNG lessons

These official reports demonstrate how policy and habitat evidence interact. They are independent public examples, not ACP projects or proof of completed biodiversity outcomes.

Lots Road South: a watercourse gap

The 16 December 2025 committee report for PP/25/04416 assessed the cross-boundary Lots Road South proposal beside Chelsea Creek. It reported separate baselines of 1.09 area-habitat units and 0.12 watercourse units.

The report identified another 0.012 watercourse units needed for 10% on-site gain. Improving the assessed 250-metre reach raised feasibility and boundary issues. The lesson is to test watercourse delivery independently of general planting. Read paragraphs 6.9.70–6.9.87.

Chelsea Cloisters: exemption and ecology

The 16 April 2026 report for PP/25/05787 considered roof and hardstanding courtyard works at Chelsea Cloisters, Sloane Avenue. It assessed a de minimis BNG exemption alongside ecological evidence and a bat survey.

Officers still sought greening through local policy and proposed landscape conditions. The report, paragraphs 6.143–6.149, illustrates why statutory scope and wider planning ecology are different. It predates the August 2026 exemption changes.

Neither report establishes current Gain Plan discharge, registered unit allocation or mature habitat delivery. Check the decision notice, approved documents and subsequent conditions for a live project.

National minimum evidence / local validation / commencement

Submit the right evidence at the right stage

The council’s published Local Validation List is dated 10 March 2023. Its BNG wording predates national commencement and the 2026 changes, so it should not be treated as the current statutory applicability test.

Planning application evidence

For an in-scope application, provide the applicability statement, baseline biodiversity value, completed metric and existing-habitat plan. Address relevant earlier baseline dates, degradation and irreplaceable habitats under the national information requirements.

Add GB14 EcIA, Thames strategy, UGF, species and tree evidence where applicable. Check the current submission gateway and published local list with the council for the particular application.

After permission, before works

Where the statutory condition applies, the formal Biodiversity Gain Plan follows permission and normally needs approval before commencement. An earlier ecology strategy or proposed metric result does not discharge that condition.

Reconcile the permitted drawings, final metric, management commitments and any off-site allocation. Our Biodiversity Gain Plan guidance and the official requirements explain the approval stage.

The council’s current planning-policy gateway also explains new decision-making arrangements from 31 October 2026. Administrative changes do not replace the adopted GB14 evidence requirements. Use our BNG process guide for the wider sequence.

Verified stock / habitat trading / allocation / legal security

Finding suitable off-site biodiversity units

No current buyer-ready RBKC allocation with independently verified remaining stock and price was established in the research. That is an evidence limit, not a claim that no suitable supply exists.

Assess the offer against the actual deficit

Start with the official biodiversity gain-sites register. Check the parcel, registered habitat types, legal agreement and recorded allocations. Then obtain dated confirmation of unsold stock, price and reservation terms from the operator.

Apply the relevant trading and spatial-risk rules. A reserve, council improvement project or LNRS polygon is not automatically a gain site. Registration alone does not confirm availability today.

Document the policy response and delivery route

Explain the on-site appraisal and any alternative under GB14 I/J. For qualifying non-major development, also check the revised August 2026 national gain hierarchy. Keep the legal and local policy reasoning explicit.

Record any allocation through the official allocation process. Qualifying significant on-site and off-site gains need long-term security, generally for at least 30 years. A Habitat Management and Monitoring Plan sets out practical responsibilities.

The council’s March 2026 report describes the London market as it stood in December 2025. It is not a current stock list. Likewise, government statutory credits are a separate last-resort route, with habitat-specific prices and applicable multipliers.

Separate budget lines / project-specific legal arrangements

Budget for assessment, delivery and long-term monitoring

No current fixed RBKC-specific BNG monitoring tariff was independently verified. Confirm the agreement, monitoring scope and council calculation rather than applying a generic historic charge.

Different costs require different evidence
Budget categoryPractical distinction
Council legal and monitoring charges

RBKC’s Section 106 guidance links its 2019 Planning Contributions SPD. Historic general monitoring formulae were subject to annual adjustment; they are not a verified current BNG price sheet. Request the applicable calculation.

National condition-approval fee

The April 2026 national schedule lists £309 for the relevant non-householder condition-approval route. Check the current submission fee. It does not include ecological consultancy, unit purchase or 30-year management.

Survey, metric, EcIA and Gain Plan work

Professional scope depends on affected habitat, existing surveys, design and submission stage. Separate the baseline assessment, species work, UGF and post-permission documentation in the brief.

Habitat creation and ongoing management

Allow for establishment, maintenance, monitoring and remedial work against the intended habitat condition. For purchased units, check the actual offer and allocation terms rather than assuming a borough-wide price.

Use the RBKC Section 106 guidance, national planning fee schedule and our BNG costs guide. Keep proposed future fees separate from charges already in force.

Survey / design / metric / approval evidence

Discuss biodiversity net gain in Kensington and Chelsea

Send the location, red-line boundary, planning stage and proposed works. Existing ecology reports, landscape drawings and council advice help ACP identify a proportionate next step.

Our BNG consultants can connect the site evidence with feasible design options and the documents needed for the next decision. Flag Thames or canal frontage, known species constraints and submission dates at the outset.

For wider context, use the London BNG guide and England hub. Nearby authority guides cover Hammersmith and Fulham and Westminster. For projects across the Thames, see Wandsworth. Each authority’s policy applies within its own planning context.

Send your site details to ACP →

GB14 / exemptions / waterfronts / urban greening

Kensington and Chelsea BNG questions

These answers address local planning decisions. Check current documents and the actual permission history before applying them to a site.

What does RBKC’s on-site BNG policy require?

GB14 I seeks at least 10% on-site gain for relevant development, including major schemes. Part J requires a robust explanation where this is unachievable before alternatives are considered. This local planning policy is separate from the national statutory gain condition and its exemptions.

Does every small development need a statutory Gain Plan?

No. Check the application date, red-line area, priority-habitat effects and relevant exemptions or transitional rules. An exempt scheme may still need local ecological, tree or landscape evidence. The adopted policy does not automatically create a statutory Gain Plan requirement for every proposal.

When is an Ecological Impact Assessment required?

GB14 H requires a site-specific Ecological Impact Assessment for all major development. Other surveys depend on habitats, species and potential effects. A biodiversity metric workbook does not replace the impact assessment.

Which sites need a Thames-side BNG Strategy?

GB14 K applies to development adjacent to the River Thames. Other GB14 provisions address Chelsea Creek and the Grand Union Canal. Establish the exact frontage and effects before deciding the strategy, survey and watercourse evidence required.

Can a green roof resolve a watercourse shortfall?

Not automatically. Area-habitat and watercourse units belong to separate metric accounts. The Lots Road South report illustrates how a scheme can propose substantial planting while still needing a specific watercourse delivery solution.

Does UGF 0.4 mean 40% biodiversity gain?

No. UGF is a weighted greening-surface score. Statutory BNG measures habitat value and relevant risks. A major development may need both, with consistent landscape drawings but separate calculations.

Are local biodiversity units available at a fixed price?

No current buyer-ready RBKC allocation or fixed borough unit price was independently verified in the research. Check the official register and obtain dated operator confirmation of stock, habitat type, legal security and price. Council monitoring charges and government statutory credits are separate costs.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.