Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Kingston upon Thames / Local planning guide

Biodiversity Net Gain in Kingston upon Thames

Biodiversity net gain in Kingston upon Thames brings together statutory requirements, adopted CS3 and DM6 policies, and the borough’s changing Local Plan.

ACP connects habitat surveys, metric assessments and Gain Plans with practical development decisions. From the Hogsmill and Thames corridors to Surbiton, New Malden and Chessington, the evidence must reflect your actual site.

Reviewed 6 November 2026 · Adopted Core Strategy 2012 · Emerging Local Plan clearly labelled · Current national BNG rules

National law / application date / habitat effects

Does your Kingston proposal need statutory BNG?

Qualifying development normally needs at least 10% biodiversity gain. However, the correct starting point is the planning route, submission date and applicable exemptions.

Apply the August 2026 rules carefully

For relevant applications from 6 August 2026, a site of 0.2 hectares or less can qualify for exemption. This depends on the full red-line area and effects on on-site priority habitat. Do not assess only the building footprint.

Householder, de minimis and temporary-development exemptions have separate tests. The general self-build exemption ended for new applications from that date. Earlier permissions and section 73 variations need their transitional position checked. See the current national exemptions.

Keep wider ecology requirements separate

Statutory exemption does not remove protected-species, tree, watercourse or local biodiversity requirements. Kingston’s checklist can still identify a need for ecological evidence on an exempt site.

For example, a small plot beside a SINC may need an ecological evaluation even where the national gain condition does not apply. Conversely, an in-scope site still needs statutory evidence if the local checklist identifies no particular species concern.

The Statutory Biodiversity Metric tools were updated on 10 November 2026. Record the version used and check Small Sites Metric eligibility. Do not describe the older Biodiversity Metric 4.0 as the current statutory tool. Our exemptions guide explains the wider scope.

Core Strategy 2012 / London Plan 2021 / site-specific constraints

Which adopted policies apply?

The Royal Borough of Kingston upon Thames is the local planning authority. Its adopted development plan includes the Core Strategy, Kingston Town Centre Area Action Plan, London Plan and South London Waste Plan.

Kingston policy references and their practical implications
Policy or evidencePractical meaning
CS3 and DM6 — Natural environment and biodiversity

CS3 sets the strategic natural-environment framework. DM6 addresses biodiversity, habitat protection and enhancement. Identify affected habitats, species and ecological connections before fixing the layout.

These adopted 2012 policies operate alongside statutory BNG. They do not establish a universal 20% borough-wide gain requirement.

DM5 — Green Belt, MOL and open space

Check the adopted policies map for Green Belt, Metropolitan Open Land and other open-space designations. An attractive metric result does not remove openness or land-use constraints.

CS4 and DM7 — Thames Policy Area

Riverfront proposals need a coordinated response to the Thames setting, landscape and environmental effects. Establish the relevant policy boundary and actual riparian habitat before defining surveys and enhancement.

DM4 and DM10 — Water and design

Coordinate drainage, flood considerations, trees and landscape design with ecological proposals. Habitat creation needs realistic space, water conditions and maintenance access.

London Plan G1, G5, G6 and G7

Address green infrastructure, urban greening, biodiversity and trees where relevant. UGF is a separate weighted design score; it is not the percentage gain in biodiversity units.

Use the council’s adopted development-plan documents and mapping with the London Plan green-infrastructure policies. The Town Centre Area Action Plan dates from 2008; the South London Waste Plan dates from 2022. Relevant supplementary guidance supports these policies.

Draft KN3 / allocated sites / consultation status

The proposed 20% target is not an adopted borough-wide rule

Kingston’s emerging Local Plan 2028–2043 proposes a different policy framework. Keep its draft requirements distinct from the adopted plan and the current statutory minimum.

Read the actual scope of draft KN3

Draft KN3(I) proposes 20% biodiversity net gain for the allocated development sites in Chapter 12. It does not apply that target automatically to every Kingston development. Check whether the parcel is an allocation and explain the draft policy’s status.

Draft KN3(G) also addresses application-stage gain evidence. That emerging wording does not replace the formal statutory Biodiversity Gain Plan approval process after permission. Read the Regulation 19 draft policy in full.

Track the current stage

The main Regulation 19 consultation closed in September 2026. At this review on 6 November, the separate Habitats Regulations Assessment consultation remains open until 11.59pm on 9 November 2026.

The council anticipates submission in December 2026, examination in 2027 and possible adoption in 2028. These stages remain future events. Check the Local Plan status page and HRA consultation before relying on the timetable.

Emerging policy can carry weight in a planning decision, depending on its stage and unresolved issues. It is still important to distinguish a proposed allocation target from an adopted obligation.

A practical briefing asset

Seven checks before commissioning the final strategy

Use these checks to brief the planning, design and ecology team. They bring Kingston’s different evidence requirements together without treating a postcode as a site assessment.

  • Record the red-line area, application date, permission history and priority-habitat effects. Identify the actual legal basis for any exemption.

  • Apply CS3 and DM6, then check DM5 and Thames Policy Area constraints. Treat draft KN3’s allocated-site 20% target as emerging policy.

  • Use the published Biodiversity Checklist to identify designated sites, habitats and species. Arrange the Part 3 evaluation where the checklist requires it.

  • Use appropriate fieldwork, condition assessment and current records. Include relevant hedgerows and watercourses; borough statistics cannot supply a site baseline.

  • Read London LNRS measures with the actual parcel and habitat. Justify strategic significance rather than assuming a map colour creates additional units.

  • Keep area habitat, hedgerow and watercourse results distinct. Calculate UGF separately where relevant, using consistent landscape and drainage drawings.

  • Plan the formal Gain Plan stage, management responsibilities, legal security and any registered off-site allocation. Separate fees from unit prices and management budgets.

Start with the site plan, existing reports and any council advice. This checklist supports project scoping; it does not determine an exemption, replace fieldwork or confirm biodiversity-unit availability.

Published May 2024 list / February 2024 checklist

How Kingston’s Biodiversity Checklist works

The council’s current gateway links a Local Validation List adopted on 1 May 2024 and a February 2024 Biodiversity Checklist. Their ecological screening role is separate from today’s statutory BNG exemption tests.

Designations, habitats and species

Part 1 asks about protected sites and habitats, including whether development is on or within 50 metres of a SINC or nature reserve. It also screens woodland, veteran trees, watercourses, wetlands, grassland and hedgerows.

Part 2 considers protected and priority species. Building works, tree removal and lighting near green or water networks can trigger further investigation. Check the precise questions and exceptions in the council’s published checklist.

When an ecological evaluation follows

A yes answer in Part 1 or Part 2 directs applicants to Part 3: an evaluation and ecological statement by an ecologist or suitably qualified person. Appropriate surveys depend on the feature and likely effect.

If all answers are no, the checklist allows progression to the declaration, subject to separate requirements. The 50-metre screening question does not automatically impose statutory BNG or a full metric assessment.

The validation gateway and published local list should be checked for the application type. Their 2024 BNG wording predates the August 2026 changes. Confirm any updated submission requirements and allow for seasonal survey timing.

GiGL February 2026 / river corridors / urban and open land

Ecological context across Kingston upon Thames

GiGL’s February 2026 factsheet records 39 SINCs covering 405 hectares, plus 53.8 hectares of priority habitat. These borough-wide figures do not establish the habitats or designation boundaries of a development plot.

The Hogsmill and its wider catchment

The Hogsmill is a chalk-stream system with important river and riparian connections. Development can affect banks, vegetation, shading, drainage and wildlife movement. Assess the affected reach and realistic restoration opportunities.

Where relevant, scope River Condition Assessment and the watercourse metric alongside the area-habitat account. A good planting result does not automatically resolve a watercourse deficit.

Thames riverfront and Seething Wells

The Kingston riverfront and Seething Wells Filter Beds provide different water-related settings. Check land ownership, current ecological records, actual habitat and the Thames Policy Area before designing works.

Seething Wells is not council-owned. Its ecological importance does not make it a council habitat bank or establish units for sale. Coordinate habitat proposals with flood, heritage and other relevant constraints.

Tolworth, Southwood and Chessington

Tolworth Court Farm Fields and Southwood Open Space feature in the council’s habitat-bank investigations. Grassland, scrub and woodland management may offer recovery opportunities, subject to real baseline and delivery evidence.

Around Chessington and other open-land locations, check Green Belt and MOL constraints independently. Avoid assuming that a green-space label means a site is developable or available for biodiversity compensation.

Surbiton, New Malden and urban connections

Gardens, trees, brownfield vegetation and smaller green spaces can connect larger habitats. Beverley Brook and Bonesgate Stream also require attention where a proposal affects their corridors.

Survey before clearance and coordinate retained trees, lighting and drainage. Habitat type and condition vary between plots. Our BNG assessments translate field evidence into the metric and practical design options.

Use the dated GiGL factsheet, current licensed records, adopted mapping and Natural England MAGIC. Draft-plan references to 45 SINCs should not be substituted for the February 2026 count. Open-space and habitat categories overlap; do not add them together.

Published LNRS / local priorities / strategic significance

Connect habitat proposals with nature recovery

London’s Local Nature Recovery Strategy provides a spatial framework alongside Kingston’s biodiversity programme. It can inform habitat choices and connections, but it does not replace site surveys or planning protections.

Read the measure as well as the map

The London LNRS was published on 9 March 2026. Its public spatial dataset was updated on 30 September. Review the relevant mapped measures and their intended habitats before selecting a proposal.

The open dataset is a subset and may omit information. Obtain fuller GiGL evidence where needed. Explain the metric’s strategic-significance category for the specific habitat and parcel, rather than assuming every opportunity qualifies.

Design for a functioning local network

Kingston’s biodiversity actions address river corridors, wetlands, grassland and other habitat connections. Retention, appropriate planting and better management can work together where the site conditions support them.

For major development, apply London Plan G5 and the Urban Greening Factor guidance separately. A UGF score of 0.4 is not 40% biodiversity gain. Likewise, bird and bat features do not substitute for habitat units.

LNRS opportunity areas are not new protective designations or a catalogue of available gain sites. Match any off-site proposal to the actual shortfall, trading rules and location requirements.

Council reporting / mayoral call-in / independent examples

What Kingston’s published BNG evidence shows

Administrative approval, proposed metric uplift and mature habitat delivery are different milestones. These public records illustrate the distinction; no ACP involvement is claimed.

Two approved Gain Plans: planned outcomes

For 1 January 2024 to 31 December 2025, Kingston reports two approved major Biodiversity Gain Plans. Both planned on-site delivery, with a combined expected increase of 3.68 units and average gain of 19.17%.

The statutory biodiversity report says long-term monitoring had not yet begun. These are approved proposals, not verified ecological outcomes. The average is also not a mandatory borough-wide target.

Motspur Park: follow the whole decision route

Kingston resolved to refuse application 25/02562/FUL on 11 March 2026. The proposal reported 25% BNG and UGF 0.533, but the council decision raised MOL, design and legal-agreement concerns.

The Mayor called in the cross-boundary application on 7 April. Following the 21 July hearing, the Deputy Mayor resolved to grant permission subject to a Section 106 agreement. The GLA hearing record therefore supersedes a simple “refused scheme” summary.

Check the latest legal and approval documents

The linked Merton application is 25/P2859. The GLA document collection, updated in September 2026, includes draft notices and an engrossment agreement. A resolution to grant is distinct from an issued permission, approved Gain Plan and completed habitat works.

The practical lesson is to coordinate ecology, land-use policy, authority boundaries and legal delivery. Neither a high BNG percentage nor a strong UGF score determines the whole planning outcome.

Application evidence / permission / commencement

Prepare the right evidence for each decision

Early ecological design work helps the planning application, while the formal statutory Gain Plan normally follows permission. Keep these stages clear in the programme and consultant brief.

At the planning application

For in-scope development, provide the required applicability statement, baseline biodiversity value, completed metric and existing-habitat plan. Address relevant earlier baseline dates, degradation and irreplaceable habitats under the national information requirements.

Coordinate Kingston’s checklist and any species, tree, landscape, drainage or UGF evidence. Make sure habitat maps, drawings and metric areas agree. The draft plan’s early gain-evidence wording does not itself discharge the statutory condition.

After permission, before commencement

Where the gain condition applies, obtain approval of the formal Biodiversity Gain Plan before starting development, subject to the rules for phased schemes. Reconcile the approved design, metric and any registered off-site allocation.

Set out management responsibility, monitoring and remedial action for qualifying gains. Our Biodiversity Gain Plan support and habitat management planning connect the paperwork with deliverable work.

Use the official Gain Plan requirements and ACP’s BNG process guide to plan the sequence. Significant on-site and registered off-site gains need the appropriate long-term security, generally for at least 30 years.

Habitat banks / registration / actual available stock

Can you buy biodiversity units locally?

Kingston is exploring council land for biodiversity gain sites. This is useful evidence of market development, but it is not confirmation of a currently available allocation or price.

Council investigations have a defined status

The 24 June 2025 Place Committee considered habitat-bank work involving council nature reserves and open space. Southwood Open Space and Tolworth Court Farm Fields were investigation leads. See the committee record.

The later biodiversity report still describes exploration. No buyer-ready council allocation with independently verified remaining units and price was established in this research. That limitation does not mean no suitable private supply exists.

Verify each offer against the shortfall

Start with the official gain-sites register. Check the registered parcel, habitat types, legal security and existing allocations. Then obtain dated operator confirmation of unsold units, price and reservation terms.

Apply the relevant habitat trading and spatial-risk rules. Check the current hierarchy for major or qualifying non-major development. For the latter, the August 2026 changes affect the treatment of on-site and off-site delivery.

Registration is separate from stock availability and from allocation to your development. Government statutory biodiversity credits remain a different last-resort route. A reserve, LNRS opportunity or council restoration project is not automatically a supply of saleable units.

Survey / legal agreement / habitat delivery / long-term work

What should a Kingston BNG budget include?

No universal current Kingston BNG monitoring tariff was independently verified. The council reports using Section 106 agreements to secure management and monitoring fees, with Exacom tracking obligations.

Keep these cost categories separate
Budget lineWhat to establish
Ecological assessment and design

Scope habitat surveys, condition assessment, metric work and any species or watercourse evidence around the actual site. Additional survey seasons or design revisions can affect the required professional work.

National application administration

The April 2026 schedule lists £309 for the relevant non-householder condition-approval route. Verify the fee at submission. This is not a consultant fee, biodiversity-unit price or council monitoring contribution.

Council legal and monitoring contributions

Request the applicable agreement and calculation from Kingston. Define the monitoring frequency, reporting expectations and responsibility for remedial action. Do not copy another borough’s tariff.

Habitat establishment and management

Allow for creation, establishment, maintenance and monitoring over the secured period. Check access, ownership and funding against the target habitat condition.

Purchased units or statutory credits

Obtain a project-specific unit quotation and check what legal and management costs it includes. Government credit prices use a separate habitat-based schedule and applicable multipliers.

See the national planning fee schedule and our BNG costs guide. A proposed later fee is not an enacted charge. Likewise, a 10% or draft 20% target cannot be converted into a fixed cost per hectare without a baseline.

Site evidence / practical design / coordinated submission

Discuss biodiversity net gain in Kingston upon Thames

Share your site boundary, proposal, planning stage and any existing ecology reports. Flag river frontage, designated land, tree constraints and time-sensitive survey needs at the outset.

ACP’s BNG consultants can help establish the assessment scope and connect metric outputs with realistic habitat delivery. The next step should reflect the evidence already available and the decision you need to make.

For the wider framework, use the London BNG guide and England hub. Existing nearby guides cover Richmond upon Thames, Merton and Sutton. Cross-boundary proposals need each authority’s actual policy and decision-making arrangements.

Send your site details to ACP →

Local policy / exemptions / ecological evidence

Kingston upon Thames BNG questions

These answers address common local decisions. Apply the current documents and actual site evidence rather than treating a borough-wide statement as an individual planning conclusion.

Does Kingston currently require 20% BNG everywhere?

No. Draft KN3(I) proposes 20% for allocated development sites in Chapter 12 of the emerging Local Plan. It is not an adopted borough-wide target. The national statutory minimum is normally 10% where the gain condition applies, subject to exemptions.

Can an exempt small site still need ecological evidence?

Yes. Kingston’s Biodiversity Checklist, adopted biodiversity policy and protected-species duties are separate from the statutory gain condition. A small site beside sensitive habitat may still need ecological evaluation and surveys.

Does the checklist’s 50-metre question automatically trigger a metric?

No. It screens designated sites and habitats and can lead to a Part 3 ecological evaluation. National BNG applicability depends on its own legal tests. The appropriate surveys depend on the actual features and effects.

Is the new Kingston Local Plan adopted?

No, at the review date of 6 November 2026. The main Regulation 19 consultation has closed, while the HRA consultation ends on 9 November. Submission, examination and possible adoption remain future stages. Check the council’s latest timetable.

Are Tolworth Court Farm Fields and Southwood selling units?

The council has investigated these locations for habitat-bank opportunities. No current buyer-ready council allocation, remaining stock or price was independently verified. Confirm registration and dated operator availability before relying on any offer.

Does the council’s 19.17% figure prove habitat delivery?

No. It is the average planned gain for two major Gain Plans approved during 2024–2025. The council states that long-term monitoring had not begun. Approval and expected units are distinct from verified ecological outcomes.

Can riverside planting cover every type of unit shortfall?

No. Area habitat, hedgerow and watercourse units use separate accounts and trading rules. Assess the affected habitat and relevant reach. Urban Greening Factor is another separate calculation, so a strong UGF score cannot replace a missing biodiversity-unit solution.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.