Merton / Local planning guide
Biodiversity Net Gain in Merton
Biodiversity net gain in Merton connects a measured habitat baseline with adopted Policy O15.3 and the borough’s green and blue network.
From Wimbledon and Raynes Park to Mitcham, Morden and Colliers Wood, the right evidence depends on the site. ACP connects habitat surveys, statutory metric assessments and Gain Plans with practical design and delivery.
Reviewed 6 November 2026 · Local Plan adopted November 2024 · Current national BNG rules · Published London LNRS
Planning route / application date / habitat effects
Does statutory BNG apply to your Merton proposal?
Qualifying development normally needs at least 10% biodiversity gain. However, screen the permission route, application date and exemptions before defining the statutory assessment scope.
Apply the current small-site rules
For relevant applications from 6 August 2026, development on sites of 0.2 hectares or less can qualify for exemption. For this reason, assess the whole red-line area. This exemption does not apply where the proposal impacts on-site priority habitat.
Householder, de minimis and temporary-development exemptions have separate tests. The general self-build exemption ended for new applications from that date. Also check transitional arrangements for earlier permissions and section 73 variations.
An exemption does not settle every ecology question
Protected-species duties, trees, local biodiversity policy and ecological networks remain relevant where affected. Merton’s checklist also identifies biodiversity enhancement statements for exempt applications. Confirm the applicable local evidence without treating exemption as a statutory 10% requirement.
Conversely, an in-scope proposal needs its statutory evidence even if no particular protected-species issue has been identified. Therefore, keep the legal scope statement separate from the site’s ecological impact assessment.
See the current national exemption tests and our BNG exemptions guide. The statutory metric tools were updated on 3 November 2026. Record the version and check Small Sites Metric eligibility; do not use the old Metric 4.0 label for the statutory tool.
Local Plan / adopted 20 November 2024
Which Merton policies should shape the design?
Merton adopted its Local Plan on 20 November 2024. It replaced the 2011 Core Strategy and 2014 Sites and Policies Plan. In addition, use its policies map and site allocations alongside the London Plan.
| Policy or evidence | Practical meaning |
|---|---|
| O15.1 and O15.2 — Open space and green infrastructure | Consider protection, enhancement and connected green infrastructure. First, establish mapped constraints; a positive metric does not override an open-space policy conflict. |
| O15.3 — Biodiversity and Access to Nature | Address habitat protection, ecological evidence and appropriate enhancement. Its 10% provision operates in accordance with statutory requirements and national guidance, including current exemptions. |
| O15.4 — Protection of Trees | Coordinate tree retention, rooting space and arboricultural evidence with the habitat strategy. However, a tree survey and biodiversity metric answer different questions. |
| O15.5 — Urban Greening | Design greening into the proposal and provide the relevant Urban Greening Factor calculation. In contrast, this weighted score is separate from biodiversity units. |
| O15.6 — Wandle Valley | Respond to the valley’s landscape, ecological and access functions where relevant. Assess actual river connections rather than assuming a borough-wide river constraint. |
Read the adoption record, adopted Local Plan and green and blue infrastructure chapter. Wimbledon, Morden, Mitcham, Colliers Wood and Raynes Park have distinct development contexts. Also check the actual allocation and any relevant neighbourhood policy.
O15.3 / ecological effects / feasible river buffers
Turn biodiversity policy into site decisions
O15.3 links biodiversity protection, enhancement and access to nature. Its practical effect depends on the development, habitats and impact pathways. A metric report alone cannot answer every policy question.
Assess ecological effects before fixing the layout
Identify relevant designated sites, priority habitats, protected species and green connections. Then explain how the design avoids harm, mitigates impacts and delivers suitable enhancement.
For example, use proportionate ecological evidence and seasonal surveys where needed. Also consider lighting, construction access and effects beyond the red line. However, a borough factsheet does not establish what is present on a particular plot.
Test the riverbank requirement where relevant
For sites including or adjoining watercourses, O15.3 seeks natural riverbanks and processes, including a 10-metre buffer where feasible. First, establish the bank, land control and constraints before developing the response.
This local policy has a feasibility qualification. However, it is not a universal national no-build distance, fixed survey radius or automatic easement. Also coordinate relevant flood, drainage and consent requirements.
Connect access to nature with habitat sensitivity
The policy addresses access-to-nature deficiency for suitable major proposals. Explain how access improvements work alongside sensitive habitats and appropriate management.
Likewise, O15.6 supports the connected Wandle Valley landscape. For example, public access, flood resilience and biodiversity units are related outcomes, but each needs its own evidence.
A practical briefing asset
Seven checks for a Merton site brief
Use these checks to coordinate ecology, planning and landscape work. They identify the decisions to resolve before committing to a habitat strategy or unit purchase.
Record the red-line area, application date, permission route and priority-habitat effects. State the evidence for any exemption.
Use relevant O15 policies, the policies map and actual site allocation. Do not rely on superseded borough-wide policies.
Check current GiGL records, protected sites, species, trees and watercourses. Scope surveys and lighting assessment around credible impacts.
Separate statutory BNG information, exemption justification, local enhancement evidence and any required Preliminary Ecological Appraisal.
Calculate relevant Urban Greening Factor separately. Match LNRS measures to the actual parcel and justify metric strategic significance.
Identify ownership, legal mechanisms, management targets and funding for qualifying gains. Ask Merton for the project-specific monitoring basis.
Obtain formal Gain Plan approval before commencement where required. Verify off-site units, allocation, trading rules and current quotation.
Start with the boundary, proposal and available reports. This briefing tool does not determine an exemption, replace surveys or confirm saleable units.
Council checklist / June 2026 update / items 7–10
What does Merton ask for at validation?
The council gateway labels its document “Checklist 2025”; the linked PDF says December 2024, updated June 2026. Its separate entries distinguish statutory gain from local ecological requirements.
Items 7 and 8: gain and enhancement
Item 7 requires national BNG information for applications that are not exempt. In contrast, where claiming exemption, provide reasons and supporting biodiversity evidence. Item 8 addresses a biodiversity enhancement statement for exempt applications.
Therefore, confirm the relevant local information for the application route. For example, an enhancement statement explains appropriate improvements; it is not a formal statutory Gain Plan or an invented metric obligation for an exempt scheme.
Items 9 and 10: ecology and urban greening
Item 9 addresses Preliminary Ecological Appraisal where proposals could affect protected species, priority habitats or recognised nature-conservation sites. In addition, external lighting can influence the assessment scope.
Item 10 covers Urban Greening Factor for major applications. Coordinate ecology, trees, drainage and landscape evidence where needed. Furthermore, the council may commission independent ecological review at the applicant’s expense.
See the application gateway and updated checklist, pages 11–13. The June document predates the August 2026 exemptions. Therefore, read statutory scope wording against current national law and confirm the applicable local list at submission.
Wandle / commons / tributaries / urban sites
Understand Merton’s ecological setting
GiGL’s February 2026 factsheet records 58 SINCs covering 853.4 hectares, or 22.7% of Merton. It also records 168.3 hectares of priority habitat. These summaries guide screening, not site-level conclusions.
Wandle Valley and Morden Hall Park
The River Wandle links landscape and ecological opportunities through the borough. For example, Wandle Meadow Nature Park adds grassland, scrub and wetland context to the wider corridor.
Therefore, assess the actual reach, banks and connections for an affected site. Coordinate O15.3 and O15.6 with drainage, lighting and restoration opportunities. However, a generic planting strip cannot demonstrate every river outcome.
Wimbledon Common and western green spaces
Wimbledon Common has important protected habitats. Therefore, check precise designation boundaries and impact pathways rather than assuming every Wimbledon address lies within a protected site.
Cannon Hill Common and Morden Park have different green-space contexts. First, retain valuable features and assess realistic condition improvements. However, public open space is not automatically available for private off-site delivery.
Mitcham Common and tributary connections
Mitcham Common contributes to the ecological network. The Graveney and Pyl Brook also create water-related connections that may matter to nearby development.
Therefore, use current records and field evidence to identify actual habitat types and effects. In addition, where watercourse assessment is relevant, keep its metric account distinct from area habitats and hedgerows.
Raynes Park, Colliers Wood and urban infill
Redevelopment sites, gardens, railway edges and street trees can support local connections, including the Haydons Road corridor. Their value depends on actual vegetation and habitat condition.
Therefore, survey before clearance. Roofs, rain gardens and tree planting can contribute where classification, establishment and management are credible. However, a previously developed address does not automatically mean zero biodiversity value.
The February 2026 GiGL factsheet also identifies 591.3 hectares deficient in access to nature and 330 open spaces. These overlapping datasets are not gain-site stock. Use licensed records, council nature information and MAGIC mapping for site-specific screening.
London Plan / published LNRS / separate calculations
Connect local design with London’s nature priorities
Urban Greening Factor, statutory biodiversity units and LNRS mapping serve different purposes. A coherent landscape proposal can respond to all three, but one result cannot stand in for the others.
Use O15.5 and London G5 for urban greening
For relevant major schemes, calculate the weighted greening score using the GLA guidance. The London Plan’s interim targets are 0.4 for predominantly residential and 0.3 for predominantly commercial development, excluding B2 and B8 uses.
However, a score of 0.4 is not 40% BNG. Coordinate roofs, trees and drainage with the habitat assessment while keeping each calculation and its assumptions clear.
Read the LNRS measure and the mapped location
The London LNRS was published on 9 March 2026. Its public spatial dataset was updated on 30 September. Review existing biodiversity importance, potential recovery areas and relevant measures.
Therefore, justify strategic significance for the actual habitat and parcel. The open dataset is a subset, so fuller GiGL evidence may be needed. However, a recovery opportunity is not a new designation or proof of units for sale.
Merton’s 2024 adopted plan predates publication of the London strategy. Read its forward-looking nature-recovery wording in that context. The London Plan G1, G6 and G7 policies also address green infrastructure, biodiversity and trees.
Raynes Park / Morden Park / evidence status
What do local projects demonstrate?
Public records offer useful lessons when their status is clear. A committee-stage proposal and planned woodland project are different from an approved Gain Plan or verified habitat delivery.
Rainbow Industrial Estate, Raynes Park
For application 25/P1654, the 22 January 2026 committee minutes recorded a proposed approximately 300% on-site biodiversity gain. Members supported the recommendation subject to conditions, section 106 matters and GLA referral.
The committee record does not establish an approved Gain Plan or achieved habitat improvement. Instead, it shows why absolute units, final design and legal delivery matter alongside a headline percentage.
Planned woodland at Morden Park
The council’s 12 June 2026 announcement described woodland proposals at Morden Park and other locations. Specifically, planting was intended for the following November-to-March season.
Therefore, this provides nature-recovery context, not proof of completed planting or registered units. Do not assume a public restoration project supplies a development shortfall without a verified legal and allocation route.
These are independent public examples, not ACP project claims. For this reason, check final decisions, approved documents and monitoring evidence before describing biodiversity outcomes as delivered.
Baseline / design / Gain Plan / long-term management
Prepare evidence for the right planning stage
A sound submission separates information needed to determine the application from formal discharge of the statutory gain condition. Align ecology and landscape revisions throughout the process.
With an in-scope planning application
Provide the applicable BNG statement, baseline value, completed statutory metric and scaled habitat plan. Address relevant earlier baseline dates, degradation and irreplaceable habitats under the national minimum requirements.
Also provide locally required ecology, tree and greening evidence. Also record survey dates, condition assumptions and access limitations. As a result, a clear audit trail helps the council understand the calculation and design.
After permission and before commencement
Where the gain condition applies, obtain formal Biodiversity Gain Plan approval before development begins. Also check phased-scheme rules and the specific permission wording.
Secure qualifying significant on-site and off-site gains for at least 30 years through the appropriate mechanism. For example, define habitat targets, management, monitoring and remedial responsibilities. Finally, verify registered allocation where off-site gains are used.
Use the official Gain Plan guidance and our BNG process guide. ACP’s habitat management and monitoring support connects target condition with practical long-term work.
Registered land / suitable habitats / dated availability
How should you verify off-site units for Merton?
No buyer-ready Merton gain site with independently verified remaining units and a current seller quotation was established in this research. This is an evidence limit, not a claim that suitable private supply does not exist.
Check the registered parcel and actual stock
Start with the official biodiversity gain-sites register. Check habitat details, legal security and recorded allocations. Then request dated operator confirmation of unsold units, reservation terms and what the quotation includes.
A park, SINC, restoration project or LNRS opportunity is not automatically a saleable habitat bank. However, registration alone does not guarantee enough units remain for your shortfall.
Match habitat and location to the shortfall
Apply the metric’s trading rules and relevant spatial-risk factors. Area habitat, hedgerow and watercourse accounts are distinct. As a result, a nearby offer may still be unsuitable for the habitat requirement.
Use the current gain hierarchy for the development category. Qualifying non-major schemes have different on-site and off-site treatment following the August 2026 amendments; do not apply older guidance without that check.
Complete the required allocation to your development. Government statutory biodiversity credits are a separate last-resort route. Neither a seller’s advert nor a nearby restoration project secures the required delivery.
Professional work / council review / legal delivery
What should a Merton BNG budget include?
Merton’s published section 106 table says its BNG monitoring fee is calculated case by case. Obtain the project-specific basis; do not substitute a neighbouring council’s tariff or another obligation’s formula.
| Budget category | What to establish |
|---|---|
| Surveys, metric and planning evidence | Professional scope depends on habitats, access, survey seasons and design revisions. Therefore, agree required ecology and arboricultural work rather than assuming every service is included. |
| Independent council ecology review | The local checklist allows independent assessment at the applicant’s expense. However, no fixed BNG review amount was verified. Therefore, confirm scope and proposed charges where the council commissions this work. |
| Council legal and habitat monitoring work | Merton calculates BNG monitoring case by case. In addition, clarify legal drafting, reporting, inspections and remedial responsibilities separately from purchased units and consultant fees. |
| National Gain Plan administration | The April 2026 schedule lists £309 for the relevant non-householder condition-approval route. Check the prescribed fee at submission. However, this is not a 30-year habitat-monitoring tariff. |
| Habitat establishment, management and units | Budget for creation, maintenance and monitoring over the secured period. Also obtain current habitat-specific unit quotations and confirm allocation, legal and management inclusions. |
See Merton’s planning-obligations charges and the national planning-fee schedule. Our BNG costs guide explains the wider categories. Private unit prices and statutory credit prices are different; no unsupported local unit price is quoted here.
Site-specific scope / coordinated evidence
Discuss biodiversity net gain in Merton
Send the red-line plan, proposal, planning stage and existing ecology or landscape reports. Flag river frontage, trees, known designations and survey deadlines so the scope addresses the next project decision.
ACP’s BNG assessments establish habitat and metric evidence. Our Biodiversity Gain Plan support links the final proposal with approval and delivery. Speak to our BNG consultants about a coordinated brief.
For the wider framework, see the London BNG guide. Neighbouring guides cover Croydon, Sutton, Kingston upon Thames and Wandsworth. Therefore, confirm the actual authority boundary before using another council’s policies.
Send your site details to ACP →Policy / validation / rivers / delivery
Merton BNG questions
These answers address common local decisions. Use current source documents and actual site evidence when agreeing the assessment brief.
Is Merton’s new Local Plan adopted?
Yes. Merton adopted its Local Plan on 20 November 2024. It replaced the 2011 Core Strategy and 2014 Sites and Policies Plan. Apply the adopted policies map and relevant O15 policies alongside the London Plan.
Does an exempt proposal still need a biodiversity statement?
Merton’s updated checklist asks for reasons and evidence when claiming exemption, and identifies enhancement statements for exempt applications. Confirm the applicable local information for the route. This is distinct from imposing the statutory 10% gain condition on an exempt scheme.
Does O15.3 create a universal 10-metre no-build zone?
No. For relevant watercourse sites, the policy seeks natural riverbanks and processes, including a 10-metre buffer where feasible. Assess the actual site and feasibility. This is not a universal national no-build distance or automatic legal easement.
Is Urban Greening Factor the same as BNG?
No. Urban Greening Factor measures weighted greening in the design. Statutory BNG compares biodiversity units with a habitat baseline. A landscape feature may contribute to both, but each calculation needs its own valid evidence.
What is Merton’s biodiversity monitoring fee?
The council’s published section 106 BNG row says the fee is calculated case by case. Obtain the project-specific basis. Independent ecology review, professional assessment, legal costs, habitat management and unit purchases are separate categories.
Can I buy units from a local park or woodland project?
Only where a suitable legally secured gain site and available units are verified. A park, nature reserve or planting announcement is not proof of saleable supply. Check the official register, current operator confirmation, trading rules and development allocation.
Does a proposed 300% gain prove completed biodiversity improvement?
No. The Raynes Park committee record describes a planning-stage proposal. A percentage alone does not establish absolute units, an approved Gain Plan or monitored habitat delivery. Check the final approved evidence and legal arrangements.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Evidence register
Sources and review dates
Primary research reviewed 6 November 2026. The Local Plan is adopted; the checklist was updated in June 2026. GiGL figures use February 2026 data. Examples describe documented planning or project stages, not ACP involvement or verified habitat delivery.
Merton policy, ecology and planning evidence
Local Plan adoption — 20 November 2024
Adopted Local Plan — O15 policies
Green and blue infrastructure chapter
Validation checklist — June 2026 update
GiGL borough factsheet — February 2026
Council nature-reserve information
Raynes Park — January 2026 committee record