London / Croydon BNG guide
Biodiversity Net Gain in Croydon
Biodiversity net gain in Croydon connects urban redevelopment with a borough of chalk grassland, wooded slopes, gardens and river corridors.
Understand the adopted policies, current validation requirements and real off-site allocations. Build a practical strategy from habitat surveys through to secured delivery.
Evidence reviewed 5 November 2026 · Local Plan review decision scheduled for 18 November, subject to the Inspector’s report.
National duties and adopted local policy
Which policies apply to a Croydon development?
Croydon Council is the local planning authority. Its 2018 Local Plan remains the adopted borough plan at this review date. Read the relevant policies alongside the London Plan 2021 and the site’s mapped designations.
National BNG: establish the applicable route
In-scope development must deliver at least 10% gain using the statutory biodiversity metric. Obtain approval of the final Biodiversity Gain Plan before starting development. Significant on-site gains and registered off-site gains require at least 30 years of secured management.
Exemptions changed on 6 August 2026, including a conditional route for sites no larger than 0.2 hectares. Check the full tests, priority habitats, dates and transitional provisions. Read the current exemptions.
SP7: connect the Green Grid
SP7.3 supports a network of multifunctional open spaces. SP7.4 addresses habitat management, larger wildlife areas, connections and buffers around sensitive sites.
For applicants, this means looking beyond isolated planting beds. Identify which retained features can connect the proposal to neighbouring gardens, parks or corridors. Read the Green Grid policy.
DM27: biodiversity belongs in the design
DM27 covers on-site biodiversity, building-based measures and productive landscapes in major schemes. It also protects designated biodiversity interests and relevant species and habitats.
Explain avoidance and design choices before presenting the unit balance. A positive metric result does not resolve an unacceptable protected-site or species impact. Read adopted DM27.
DM28: trees, woodland and hedgerows
DM28 addresses arboricultural evidence, avoidable tree loss and damage to irreplaceable habitats. Coordinate root protection, access, foundations and landscape proposals early.
In particular, allow replacement trees adequate growing space. A tree symbol on a drawing does not establish that the promised habitat condition is deliverable. Read the tree policy.
DM25: drainage and habitat design
DM25 addresses sustainable drainage and flood risk. Check water movement, infiltration constraints and maintenance alongside ecology.
Therefore, design a rain garden or pond for its actual hydrology and water quality. Use realistic habitat assumptions in the metric, with safe access for long-term care. Read DM25.
London Plan: assess greening separately
G1 supports green infrastructure, G5 urban greening, G6 biodiversity and G7 trees and woodland. These matter differently in a dense central scheme and a wooded suburban plot.
Where relevant, calculate the Urban Greening Factor alongside BNG. The two measures answer different questions; neither replaces species surveys or site protection. Read the London Plan policies.
Croydon’s partial Local Plan review is still emerging. The forward plan schedules a decision for 18 November 2026, dependent on the Inspector’s report. Revised DM27 includes proposed urban-greening provisions; do not describe them as adopted. Check the decision timetable · Read the revised text.
Current application requirements
Prepare evidence the planning officer can follow
Use the May 2026 Local Validation List. It distinguishes exemption evidence from the information needed for a non-exempt proposal. Keep the application narrative, habitat plan and metric consistent.
| Application issue | Evidence to prepare |
|---|---|
| All applications | State whether the statutory BNG condition applies. The council accepts this explanation within the form, covering letter or a BNG statement. |
| An exemption claim | Identify the precise exemption and supporting evidence. Apply current national rules, including changes after publication of the May 2026 checklist. |
| A non-exempt proposal | Provide the baseline habitat plan and statutory metric assessment, with ecological evidence explaining how measurable gain will be delivered. |
| The application inventory | Cross-reference the relevant documents so the officer can locate the evidence. The list generally encourages an inventory; householder applications do not require one. |
| Separate ecological constraints | Check the site-constraints table for habitat and species assessment needs. BNG exemption does not remove protected-species, tree or designated-site requirements. |
The list also refers to vegetation affected by enabling works on adjacent land. Its 25 m² wording is not a complete statement of current statutory exemptions. Check the later national changes before relying on any threshold. Read printed page 15 and the site-constraints table.
Use guidance with the correct status
The Croydon Opportunity Area Planning Framework became council SPD on 22 April 2013. It provides town-centre context alongside the development plan.
However, the council revoked Suburban Design Guide SPD2 in July 2022. Its online availability does not make it current guidance. The council’s gateway still lists Purley Way material under emerging guidance. Check the guidance register.
Separate application evidence from final approval
An application-stage strategy sets out the baseline, design and likely delivery route. The final Biodiversity Gain Plan must reflect the approved scheme and any registered off-site allocation.
Where required, the Habitat Management and Monitoring Plan should identify responsibilities, prescriptions, inspections and remedial action. Resolve legal security and funding before relying on the gains.
London Local Nature Recovery Strategy
Explore four nature-recovery priorities in Croydon
The Mayor is London’s LNRS responsible authority. The published March 2026 strategy and April spatial data identify potential measures across the borough. These four examples illustrate different habitat opportunities.
Published opportunities / local context
Follow a priority into the evidence
Select a numbered marker or its text link: Chalk grassland — PM2316, Woodland — PM3379, Ponds and lakes — PM3691, Acid grassland — PM3440.
Each marker represents a point within a potential-measure polygon. It does not show a habitat boundary, development allocation or land with units for sale.
1. Chalk grassland — PM2316
This southern mapped opportunity reflects the importance of downland habitats. Check the full polygon, soils and existing grassland condition. Restoration may require grazing or carefully timed cutting and scrub control; blanket tree planting could conflict with the habitat objective.
2. Woodland — PM3379
This eastern opportunity highlights woodland recovery. Establish whether the appropriate action is management, buffering or creation. Protect existing ancient habitat and veteran features first. Newly planted trees cannot reproduce an irreplaceable woodland habitat.
3. Ponds and lakes — PM3691
This northern example highlights freshwater recovery. Assess water supply, quality, shading, fish and surrounding terrestrial habitat. Confirm the intervention’s location in the full dataset; a map marker is not proof that a pond occurs within an application site.
4. Acid grassland — PM3440
This central-northern opportunity illustrates why local geology and soil conditions matter. Test the existing vegetation and management history. A generic wildflower mix may not suit nutrient-poor acidic conditions, and an attractive sward does not automatically meet metric condition criteria.
Boundary: ONS January 2026 LPA data, OGL v3.0, Crown copyright and database right 2026. Measures: GLA/GiGL April 2026 open data. Inspect the full polygons in the published dataset before applying them to a site.
For the statutory metric, check whether the proposed intervention and location meet the applicable strategic-significance criteria. Do not apply an automatic uplift to every site in the borough. Read London’s strategy · Understand the statutory biodiversity metric.
From town centre to downland
Match the strategy to the site’s ecological context
Croydon’s ecological character changes substantially between its dense northern neighbourhoods, central regeneration sites and southern downlands. Establish the actual baseline rather than transferring assumptions from another part of the borough.
Chalk slopes and sensitive grasslands
The council’s chalk-grassland action plan identifies places including Riddlesdown, Happy Valley, Farthing Downs and Hutchinson’s Bank. It explains the importance of keeping grassland open through suitable management.
Use this historical evidence to scope surveys and connectivity. Verify current designations and condition separately; the document’s older area totals are not a contemporary inventory. Read the habitat action plan.
Woodland, hedges and garden networks
Croydon’s woodland and hedgerow action plan provides a local basis for considering habitat continuity. Survey boundaries, mature trees and the relationship between wooded land and gardens.
For sites around Selsdon, Shirley or Kenley, consider edge effects, lighting and construction access as well as habitat area. The location alone does not prove that protected or ancient habitat occurs on site. Explore the woodland evidence.
Water and the Wandle catchment
The Wandle connects Croydon with Sutton, Merton and Wandsworth. The South East Rivers Trust describes pressures from pollution, modified channels and urban development.
Where a proposal affects a watercourse, examine drainage connections, water quality and bankside habitats. River-condition evidence and watercourse units require their own assessment; terrestrial planting cannot simply substitute for them. Explore the catchment partnership’s work.
Town-centre and Purley Way proposals
The adopted Opportunity Area framework provides context for central regeneration. Purley Way proposals also need a careful check of adopted allocations and the status of emerging masterplan material.
Survey urban land before treating it as ecologically empty. Coordinate roofs, retained vegetation, public space and SuDS with servicing and maintenance. Check the framework and masterplan status · Review the council’s open-space evidence.
Planning decisions and habitat management
What local evidence teaches an applicant
These examples show different stages of planning and habitat delivery. A committee resolution, a registered allocation and a landscape project each provide different evidence.
43 Abbots Lane: trace an off-site allocation
The official register records 0.32 area units for 43 Abbots Lane, Kenley, application 24/03410/FUL. These units sit at BGS-021025002 outside Croydon.
The allocation includes planned lowland calcareous and other neutral grassland enhancements. Match the application reference, unit type and final metric to the register. This record does not establish stock availability or prove final gain-plan approval. Inspect the allocation tab.
17 Convent Hill: reconcile the final documents
For application 25/01331/FUL, the 4 December 2025 report considered a garden subdivision and off-site BNG. The committee resolved to grant, with additional boundary landscaping.
However, adjacent paragraphs contain different off-site quantities, so no settled shortfall is quoted here. Before proceeding, reconcile the final metric, legal agreement and gain plan. Read paragraphs 8.83–8.87 · Read the committee minutes.
Verge trials: management determines the outcome
The council identifies trials at Covington Way, Featherbed Lane, Bradmore Green and Beaulah Road. Its approach includes soil-appropriate seed mixtures, altered cutting and removal of arisings.
The lesson for habitat design is to specify establishment and continued care, not just seed supply. These are council project examples, not evidence of registered BNG units for purchase. Read the verge-management approach.
Wandle recovery crosses council boundaries
The 2026 Wandle partnership brings habitat restoration together with access and connected green spaces. Its programme involves several boroughs and delivery partners.
Use catchment evidence to identify relevant pressures and possible collaboration. Do not assume that every partnership project lies in Croydon or offers tradeable biodiversity units. Read the 2026 partnership update.
Registered evidence and practical budgeting
Check location, availability and long-term costs
A documented allocation shows that an off-site route has been used. It does not provide a current supplier quotation or guarantee that matching units remain available.
A registered site near Green Street Green
BGS-021025002 covers 29.51 hectares at TQ45676200, near Green Street Green in Bromley. The register names Harry Ferguson Holdings Limited as the responsible body.
Its Croydon allocation provides a useful example of cross-boundary delivery. Confirm the exact land boundary, habitat category, legal security and remaining stock before considering a purchase. Open the gain-site record · Inspect the registered boundary.
Apply the metric’s location rules
Check the development and gain-site parcels against the relevant planning-authority, National Character Area or catchment rules. Different unit categories have different spatial considerations.
A site’s proximity or “London” description does not determine the calculation. Confirm the applicable multiplier and trading rules before reserving units. Read the current off-site guidance · Explore off-site biodiversity units.
Follow the applicable gain hierarchy
Avoid and mitigate harm first. Under the August 2026 changes, qualifying non-major applications have equal preference for on-site enhancement, creation and registered off-site compensation at the compensation stage.
Other routes and transitional cases need their own check. Statutory credits remain last. Review the national hierarchy before deciding how to address a shortfall.
Confirm council costs for the actual scheme
Croydon approved its 2026–27 corporate fees schedule on 3 December 2025. A current borough-wide BNG-specific monitoring tariff was not verified from accessible sources.
Ask the council to distinguish legal work, administration and ecological monitoring. Its 2024–25 audit also recorded a review of older obligations guidance; a planned replacement is not evidence of adoption. Open the fee decision · Read the audit record.
| Cost category | What to confirm |
|---|---|
| Council charges | Ask for the applicable legal, administration and ecological monitoring charges. The approved 2026–27 corporate fee decision does not by itself establish a BNG tariff for your scheme. |
| Private habitat units | Request a dated quotation for the correct habitat category and quantity. Check location, available stock, allocation costs, tax and legal responsibilities. No current public price was verified for the cited gain site. |
| Habitat management | Budget for establishment, replacement, monitoring and remedial work over the relevant secured term. Separate these costs from the consultant’s assessment and metric fees. |
| Statutory credits | Government credits are a last-resort route, with their own prices and rules. They are different from privately supplied off-site units and council monitoring contributions. |
Check the official statutory credit prices if that last-resort route is relevant. For a wider budget framework, use BNG cost guidance.
A practical project sequence
Your Croydon planning evidence checklist
Use these prompts alongside the current council validation list. The checkboxes are a reading aid; they send no information to ACP or the council.
Before submitting
Locate the red-line boundary and designations. Record the application date, current exemption tests and the status of adopted and emerging policies.
Survey the actual vegetation, trees, buildings and water features. Identify seasonal surveys and effects on adjoining habitats or ecological connections.
Align the habitat plan, eligible statutory metric and condition evidence. Explain any earlier baseline date, degradation or irreplaceable habitat treatment.
From design to delivery
Check roots, drainage, lighting, landscape details, roofs and maintenance access together. Keep UGF and BNG calculations separate but consistent with the same drawings.
Confirm the shortfall, unit category, location rules, legal security and allocation. Obtain current quotations and a project-specific monitoring scope.
Where required, obtain Biodiversity Gain Plan approval before starting. Implement the agreed management, reporting and remedial arrangements.
Qualifying nationally significant infrastructure applications entered a separate BNG regime on 2 November 2026. Confirm the consenting route before applying ordinary borough procedures to infrastructure proposals. Read the infrastructure guidance.
Assessment and local evidence
Build a clear Croydon BNG strategy
ACP can help with habitat surveys, metric calculations and planning evidence. Share the site address, red-line plan, application stage and existing ecology reports through the approved enquiry form below.
Turn the evidence into a proportionate assessment
A BNG assessment should connect the baseline to realistic delivery options. Ecological surveys for planning can address species and habitat issues beyond the metric. The main BNG guide explains the wider process.
Follow the relevant geographic connections
Use the London hub for borough navigation and strategic policy, and the England guide for national context. Consult Bromley or Sutton where the site or ecological connection crosses a boundary.
Monitor the next policy steps
Check the outcome of the scheduled 18 November Local Plan review decision before finalising later submissions. Croydon also discussed proposed residential extensions guidance in September 2026; that programme does not reinstate SPD2. Read the scrutiny record.
The replacement London Plan remains emerging after consultation ending 15 October 2026. Check the London programme.
Practical local questions
Croydon BNG questions
These answers distinguish adopted policy, current submission requirements and documented delivery evidence.
Is Croydon’s revised Local Plan already adopted?
The 2018 Local Plan remains the adopted borough plan at the 5 November 2026 review date. A decision on the partial review is scheduled for 18 November, dependent on receipt of the Inspector’s report. Check the outcome before relying on revised DM27 as adopted policy.
Which validation list should a Croydon applicant use?
Use the May 2026 Local Validation List and check for any later replacement. It asks applicants to explain whether BNG applies and sets out baseline information for non-exempt proposals. Read it alongside national changes effective after its publication.
Does a small-site exemption remove ecological assessment needs?
No. Establish the precise statutory exemption first. Protected species, designated sites, valuable trees and local biodiversity policies can still require evidence. The exemption position and the planning merits are separate questions.
Where have off-site units been allocated to a Croydon development?
The official register records 0.32 area units at BGS-021025002 for 43 Abbots Lane, Kenley, application 24/03410/FUL. The gain site lies near Green Street Green in Bromley. This is allocation evidence, not confirmation of available stock or final gain-plan approval.
Is there a fixed Croydon BNG monitoring charge?
A current borough-wide BNG-specific tariff was not verified from accessible sources. Ask the council for the charges and monitoring scope applicable to the proposal. Separate legal and council costs from habitat-unit purchase, consultancy and long-term habitat management.
Can the nature-recovery map replace a habitat survey?
No. The map identifies potential measures and their locations. A site survey establishes the actual baseline. Check the full mapped extent and the metric’s strategic-significance rules before assigning any uplift to a proposed intervention.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Evidence and further reading
Sources behind this guide
Reviewed 5 November 2026. Adopted policy, emerging proposals, project descriptions and registered allocations are distinguished throughout. No ACP involvement in the cited projects is claimed.
Croydon policies and application evidence
Croydon Local Plan 2018: SP7, DM27, DM28 and DM25
Adopted development plan; distinguish from revised 2024 text · 2018
Adopted Local Plan: council status gateway
Current council status confirmation · Checked 5 November 2026
Croydon Local Validation List, especially printed pages 10, 15 and 31
Current council submission guidance; apply subsequent national changes · May 2026
Supplementary planning documents and guidance: Croydon
OAPF adopted 22 April 2013; SPD2 revoked July 2022; Purley Way listed as emerging · Status checked 5 November 2026
Local Plan Partial Review: proposed adoption decision
For determination; dependent on receipt of Inspector report · Scheduled 18 November 2026
Revised Local Plan 2024: proposed DM27 and Urban Greening Factor
Emerging text; not the adopted 2018 policy · 2024
Residential extensions and alterations guidance: scrutiny minutes
Proposed guidance programme; not an adopted replacement for SPD2 · 15 September 2026
Nature recovery, delivery and costs
Nature and open-space evidence library
Council evidence, including 2024 open-space assessment and habitat action plans · Checked 5 November 2026
Croydon Habitat Action Plan: Chalk Grassland
Historical habitat evidence; not a current site survey or area inventory · Council file uploaded January 2022; document publication date not confirmed
Croydon Habitat Action Plan: Woodlands and Hedgerows
Historical local habitat evidence; verify current site condition · Council file uploaded January 2022; document publication date not confirmed
London Local Nature Recovery Strategy and Local Habitat Map
Published strategy · March 2026
GLA and GiGL open LNRS data, potential measures layer
Published under Open Government Licence · April 2026 dataset
25/01331/FUL: 17 Convent Hill, committee report
BNG paragraphs 8.83–8.87; conflicting shortfall figures are not used as a settled quantity · 4 December 2025
Minutes of 4 December 2025: 17 Convent Hill
Resolution to grant with additional boundary landscaping; not proof of gain-plan approval · Minutes reproduced in 18 December 2025 agenda
BGS-021025002: 43 Abbots Lane allocation
Official register: 0.32 area units for 24/03410/FUL; not proof of available stock · Checked 5 November 2026
BGS-021025002 land boundary near Green Street Green
Registered land at TQ45676200, outside Croydon · Drawing 3 April 2025
Croydon wildflower verge trials
Council project description; not registered gain-site stock · Live page checked 5 November 2026; project date not stated
Wandle Fortnight 2026: catchment restoration and partnership
Delivery-partner evidence; wider catchment work, not all located in Croydon · 2026
Croydon Fees and Charges 2026–27 decision
Approved charging schedule; no BNG-specific tariff verified from accessible evidence · Cabinet decision 3 December 2025
CIL and S106 use of funds: final internal audit 2024–25
Records review of the November 2019 obligations guidance; target dates are not proof of replacement · 2025
National and London framework
Planning Practice Guidance: scope, application evidence and gain hierarchy
Current national planning guidance · Updated 31 July 2026
BNG exempt developments
Defra guidance on exemptions · August 2026 tests
Statutory biodiversity metric tools and user guide
Statutory tools; separate area, hedgerow and watercourse modules · Current release
Make off-site biodiversity gains as a developer
Current national delivery guidance · Checked 5 November 2026
Statutory biodiversity credit prices
National government price schedule · 3 November 2026 update
Irreplaceable habitat and the biodiversity metric
Defra guidance · 3 November 2026
London Plan 2021, G1, G5, G6 and G7
Adopted strategic plan · March 2021
London Plan Urban Greening Factor guidance
London Plan Guidance · January 2023 document, published February 2023
Draft London Plan consultation
Emerging policy; consultation closed · 15 October 2026
Defra guidance for nationally significant infrastructure projects
National framework effective 2 November 2026 · Checked 5 November 2026