London / Bromley BNG guide
Biodiversity Net Gain in Bromley
Biodiversity net gain in Bromley connects development decisions with woodland, chalk grassland, suburban gardens and the borough’s river networks.
Understand the council’s policies, survey requirements and off-site delivery evidence. Build a practical strategy for sites in Bromley, Orpington, Beckenham, Chislehurst and the rural south.
Evidence reviewed 5 November 2026 · Adopted policy, emerging proposals and registered delivery distinguished.
National, London and borough requirements
Which policies apply to your Bromley site?
The London Borough of Bromley is the local planning authority. Its Local Plan, adopted on 16 January 2019, works alongside the London Plan 2021. National statutory BNG requirements apply separately from these local policy tests.
First check the red-line site against the council’s policies map. A Green Belt, SINC or tree constraint needs its own assessment. Achieving a numerical biodiversity gain does not make an otherwise unacceptable development acceptable.
National BNG: establish the correct route
Where statutory BNG applies, provide at least 10% gain using the statutory biodiversity metric. Secure approval of the final Biodiversity Gain Plan before starting development. Significant on-site enhancements and registered off-site gains require at least 30 years of secured management.
From 6 August 2026, sites no larger than 0.2 hectares may qualify for exemption if they do not impact priority habitat. Check the detailed conditions and transitional rules, rather than relying on site size alone. Read the current exemptions.
Policies 68–72: assess ecological harm early
Policy 68 addresses SSSIs; Policy 69 covers LNRs, SINCs and geological sites. Policies 70 and 71 address wildlife features and newly identified nature-conservation interest. In addition, Policy 72 deals with protected species.
Therefore, survey the site and its likely zone of influence before fixing access, lighting or clearance. An undesignated parcel can still have ecological value. Read the nature-conservation policies, printed pages 150–152.
Policies 73–75: trees, woodland and hedgerows
For trees on the site and adjoining land, Policy 73 requires particular attention. Policy 74 supports beneficial woodland management and appropriate planting. Policy 75 normally expects hedgerow retention and management, with native replacements where appropriate.
Coordinate tree protection and habitat calculations. A replacement planting schedule does not automatically reproduce a mature tree’s habitat value. Check the tree and hedgerow policies, pages 153–154.
Policies 78–79: improve connections and access
Policy 78 assesses effects on green corridors and supports their enhancement. Policy 79 addresses biodiversity, ecological restoration and deficiencies in access to nature.
In practice, examine links to neighbouring gardens, parks, railway vegetation and rivers. Keep ecological connectivity distinct from public access: a useful wildlife corridor need not be publicly accessible. Read policies 78 and 79, pages 156–157.
London Plan: greening complements habitat protection
G1 supports connected green infrastructure. G5 addresses urban greening, while G6 protects biodiversity and access to nature. G7 covers trees and woodlands. These policies are relevant in both dense town centres and greener suburban settings.
For major schemes, assess the Urban Greening Factor alongside BNG. A strong UGF score is not proof of a 10% habitat-unit gain. Read the London Plan green-infrastructure policies.
Landscape and water need coordinated evidence
Policy 76 protects the Kent Downs landscape and its setting; Policy 77 addresses landscape quality. Policies 115 and 116 cover flood risk and sustainable drainage.
For a river-side or rural-edge scheme, coordinate drainage, landscape, ecology and lighting from the outset. Check the actual designation and watercourse before selecting habitat proposals. Consult the adopted Local Plan.
Bromley restarted its Local Plan process in November 2026. The council published a new timetable on 10 November, with scoping consultation expected in January 2027 and adoption targeted for September 2029. These are planned dates, not completed milestones. The 2019 Local Plan remains adopted. Check the new plan programme.
From survey to permission
What should your planning submission contain?
Bromley’s January 2025 validation guidance requests a BNG statement or plan and the full baseline metric for relevant applications. Where an exemption applies, explain it clearly and provide supporting evidence.
Baseline and application-stage strategy
Record habitat type, extent and condition, with a dated plan and metric workbook. Explain any earlier baseline date, habitat degradation or irreplaceable habitat. Show how the design applies the relevant hierarchy and intends to deliver the required gain.
Use the statutory metric, or the Small Sites Metric only where its eligibility rules permit. The council’s older guidance does not override current national exemptions. See validation guidance, pages 16 and 24.
Ecological appraisal and seasonal surveys
The validation guidance identifies designated sites and possible protected-species effects as survey triggers. Demolition, tree removal, lighting and watercourse alterations can require evidence beyond a habitat calculation.
Scope a preliminary appraisal early. Then programme any necessary species surveys before the planning decision. An exemption from statutory BNG does not remove these requirements. Read ecology and species requirements, page 25.
Urban greening and detailed habitat design
The Urban Design Guide SPD was adopted on 5 July 2023. Paragraph 5.287 refers to UGF targets of 0.4 for predominantly residential and 0.3 for predominantly commercial development, alongside London Plan G5.
Confirm the applicable scheme category and exclusions. Design green roofs, rain gardens and planting with adequate substrate, water and maintenance access. Read paragraphs 5.284–5.304.
Management and the final gain plan
The design guide asks for costed maintenance and monitoring proposals, resources and responsibilities. For statutory BNG, resolve the applicable legal security, management period and registered off-site allocation before gain-plan approval.
Keep the application strategy distinct from the final Biodiversity Gain Plan. Where required, the Habitat Management and Monitoring Plan should explain prescriptions, reporting, remedial work and ownership changes.
For a new dwelling, also check the current council validation checklist. Coordinate the ecology package with the landscape, arboricultural, drainage and construction drawings. This reduces contradictions between what the metric assumes and what the project can deliver.
London Local Nature Recovery Strategy
Read the recovery map alongside the habitat survey
London’s published March 2026 strategy and April 2026 open spatial data identify potential measures across Bromley. The four examples below show different priorities; they do not identify habitats present on every site.
London LNRS / published March 2026
Four mapped priorities across Bromley
Select a numbered marker or its text link: Ancient trees and woodland — PM1223, Chalk streams — PM1348, Chalk grassland — PM133, Lowland meadow — PM451.
Markers represent locations within published opportunity polygons, not precise habitat boundaries. Use the full strategy map to examine the extent and proposed measures before applying them to your project.
1. Ancient trees and woodland — PM1223
The published layer identifies an ancient-tree and woodland priority in the north-east of the borough. Examine the mapped extent, existing records and buffers before proposing access or landscape changes. New planting cannot replace irreplaceable habitat.
2. Chalk streams — PM1348
This mapped priority highlights part of the borough’s spring-fed river environment. Consider water quality, channel condition, riparian vegetation and light spill. A watercourse assessment may require separate expertise and cannot be replaced by an area-habitat score.
3. Chalk grassland — PM133
The south-eastern opportunity reflects the North Downs context. Check soil, existing vegetation and management feasibility before specifying calcareous grassland. An attractive seed mix alone does not establish a realistic target condition.
4. Lowland meadow — PM451
The northern mapped opportunity illustrates the role of open grassland within a more urban setting. Consider hay cutting, removal of arisings and recreational pressure. Confirm whether meadow creation suits the actual parcel and its current habitat.
The Mayor is the responsible authority for London’s LNRS. Compare the detailed Local Habitat Map with the red-line boundary and proposed measures. Then apply the statutory metric’s current strategic-significance rules to the relevant habitat. Proximity to an opportunity is not an automatic uplift. Read London’s strategy and the metric guidance.
Boundary: ONS Local Planning Authorities, January 2026, Bromley LPA E60000206. Contains public sector information licensed under OGL v3.0; Crown copyright and database right 2026. Opportunity data: GiGL/GLA London LNRS, April 2026 open-data release. Boundary source · Nature-recovery data and licensing.
A varied borough landscape
Match the habitat ambition to the place
Bromley links the London basin with the North Downs. Its Biodiversity Plan describes chalk grassland, ancient woodland, heathland remnants and the Cray, Ravensbourne and Beck catchments. These are starting points for investigation, not site-level findings.
Downe, Cudham, High Elms and the rural south
The local evidence describes a mosaic of chalk soils, grassland, woodland and historic field boundaries. Habitat retention, hedgerow connections and appropriate grazing or cutting can be more credible than uniform ornamental planting.
Check ancient woodland and veteran trees separately. The statutory metric does not provide a routine compensation route for irreplaceable habitats. Explore the Biodiversity Plan and national irreplaceable-habitat guidance.
Chislehurst, Scadbury and woodland networks
The Biodiversity Plan records wet woodland at Scadbury Park, Crofton Woods and other damp locations. Its condition depends on water regime and surrounding land use, as well as trees.
Therefore, assess drainage changes, buffers and construction effects. The council’s Scadbury moat work also illustrates the need to coordinate habitat conservation with protected-species licensing. Read the council’s project evidence.
Bromley town centre and access to nature
The October 2023 Town Centre SPD identifies an access-to-nature deficiency and a chain of green spaces. Queensmead, Martins Hill and Bromley Palace Park feature in its nature-conservation context.
For town-centre redevelopment, consider how trees, roofs and ground-level habitats contribute to that network. The council now describes the former Area Action Plan as expired; check current policy status for the application. Read the Town Centre SPD · Council statement on the former AAP.
Orpington and the Cray Valley
The July 2023 Orpington Town Centre SPD seeks connections between the centre, surrounding suburbs and Cray Valley landscapes. Its development-opportunity guidance does not itself allocate every identified site.
For proposals around the Walnuts, High Street or station, test space for trees, drainage and habitats while the layout remains flexible. Use the Orpington guidance.
Planning decisions and restoration evidence
What local projects tell applicants
Published examples help distinguish a design-stage forecast, a registered allocation and a restoration project. Each answers a different question about delivery.
Duke Youth Centre: a shortfall needs a delivery route
For application 24/03840/FULL1 at Park Road, Orpington, the March 2025 committee report recorded a 4.48-unit baseline. Its design-stage assessment forecast a 51.46% loss and identified a need for 2.75 additional area units.
The committee recorded permission on 6 March 2025. The gain-site register now records a 2.82-area-unit allocation to the scheme at BGS-021025002. These are different records and stages, not interchangeable calculations.
The practical lesson is to revisit the final metric and allocation together. Registration alone does not demonstrate final gain-plan approval. Read report section 7.9 · Committee decision · Registered allocation.
Upper Cray: maintain restoration benefits
The council’s 2021–2025 report describes work led by the South East Rivers Trust on 1.4 km of the Upper Cray. At Riverside Gardens, it records desilting, reprofiling and native planting, with some funding reserved for maintenance.
This illustrates why river projects need sediment, water-quality and management planning. It is restoration evidence, not proof of registered units available to a developer. Read the Riverside Gardens account.
Harvington: a trial is not a sales catalogue
The same report records a BNG assessment of newly planted tree, hedgerow and scrub areas at Harvington Sports Ground. It describes a trial using the older Defra Metric 4.0.
Do not assume that this establishes statutory registration, unallocated units or a price. A current purchase needs the statutory metric, legal security and register evidence appropriate to the transaction. Read the reported trial.
Keston Ponds: separate development from delivery
The council reports a funded development phase running from June 2025 to May 2026. It includes ecological and hydrological surveys, feasibility work, permits and maintenance planning.
The dated report does not prove that all later works are complete. For a nearby scheme, obtain the current project position and assess its interaction with drainage and habitats. Check the Keston project scope.
Registered evidence and a realistic budget
Off-site biodiversity units and Bromley BNG costs
Resolve the habitat shortfall before comparing prices. Match the unit category, trading rules, location, timing and legal arrangements to the development’s final metric.
Registered land near Green Street Green
BGS-021025002 covers 29.51 hectares at grid reference TQ45676200. Its published boundary lies near Green Street Green and Cudham Lane North. The register names Harry Ferguson Holdings Limited as the responsible body.
Planned habitat improvements include lowland calcareous grassland, neutral grassland, woodland, scrub and species-rich hedgerows. This confirms a registered scheme, not the quantity currently offered for sale. Inspect the register and the land boundary.
Separate area units from hedgerow units
For 2 Lezayre Road, reference 25/00390/FULL1, the same register records 0.16 area units and 0.01 hedgerow units. The separate categories show why a single headline unit total can mislead.
Ask for the exact unallocated units, habitat condition, agreement and allocation process. Never infer remaining stock by subtracting figures from a marketing page. Review the recorded allocations.
Apply the location rules to the actual parcel
For area habitats and hedgerows, the metric uses the relationship between planning-authority and National Character Area boundaries. Watercourse units use their own catchment rules. A London address or neighbouring borough alone does not settle the calculation.
Test the supplier’s parcel against the development and apply the current spatial-risk rules. For qualifying non-major development, the August 2026 hierarchy changes allow equal consideration of compensation routes after avoidance and mitigation. Read the current off-site guidance.
Keep purchase evidence and planning approval aligned
A supplier reservation is not a registered allocation. Likewise, a registered allocation does not by itself approve the development’s Biodiversity Gain Plan. Check both records and ensure the final figures match.
Use off-site BNG guidance to structure the purchase questions, then agree the submission evidence with the council. Where units are unsuitable, revisit the design or alternative delivery options.
| Cost category | What to establish |
|---|---|
| Council monitoring: published £500 per head of term | Appendix 1 of the June 2022 Planning Obligations SPD gives this general Section 106 administration charge. It also allows separate bespoke management or monitoring charges. Confirm the current amount for the agreement; this is not a 30-year BNG monitoring tariff. |
| Legal drafting and ecological monitoring | The SPD refers to separately published legal costs, which may change. No current borough-wide BNG-specific tariff or fixed legal fee was verified for this guide. Obtain written scope and charges for the proposed agreement and monitoring programme. |
| Private biodiversity units | Request a dated quote for the required habitat category and quantity, with tax, allocation and transaction costs identified. Registered hectares and allocated units are different measurements. No current public sale price for the local registered site was verified. |
| Long-term habitat work | Budget establishment, replacement planting, cutting or grazing, surveys, reporting and remedial work. The costed specifications requested by the design guide should identify who pays and what happens when ownership changes. |
| Statutory credits | Government credits are a last resort, subject to the national evidence requirements and spatial multiplier. Their prices are not private habitat-bank prices or council fees. Use the current government schedule for the relevant habitat tier. |
Read Appendix 1 of the Planning Obligations SPD · Costed management requirements · Current statutory credit prices and rules.
A practical project sequence
Your Bromley planning evidence checklist
Use these prompts with the council’s current requirements. The boxes are a reading aid; ticking them sends no information to ACP or the council.
Before submitting
Confirm the Bromley red-line boundary, application date and development category. Document any exemption with evidence, including the priority-habitat test where relevant.
Review the policies map, SINCs, SSSIs, ancient woodland, trees, hedgerows and nearby watercourses. Scope habitat and species surveys for the actual proposal.
Submit the correct metric workbook, dated habitat plan and condition evidence. Explain earlier baseline dates, degradation and any irreplaceable habitat.
From design to delivery
Align habitat retention, tree protection, drainage, UGF, lighting and construction access. Test the proposed management against soil, water, space and recreational use.
Identify the off-site shortfall if any, unit categories, location rules, legal agreement and allocation evidence. Agree monitoring responsibilities and distinguish all cost categories.
Where statutory BNG applies, secure the final Biodiversity Gain Plan approval. Put the required long-term management, reporting and remedial arrangements into effect.
A separate BNG route for qualifying nationally significant infrastructure applications began on 2 November 2026. Ordinary Bromley planning applications follow the town and country planning regime. Read the infrastructure guidance.
Assessment and planning support
Bring the local evidence into your BNG strategy
ACP can help with habitat surveys, the statutory metric and planning evidence. Share the site address, red-line plan, application stage and any existing ecology reports through the approved enquiry form below.
Scope the survey and submission
A BNG assessment should test the baseline and realistic habitat options. Use BNG consultancy support to coordinate the metric, planning drawings and delivery programme. The main BNG guide explains the wider process.
Follow the relevant geographic connections
Use the London hub for strategic policy and borough navigation, and the England guide for national context. For cross-boundary sites or habitat routes, consult Bexley, Croydon or Lewisham where relevant.
Track evidence and emerging policy
The July 2025 environmental scoping report belongs to the earlier Local Plan review. The council has archived that process and relaunched plan preparation. Use the current timetable for emerging policy, while retaining relevant evidence and the adopted policy tests.
Similarly, the replacement London Plan remains emerging following consultation ending 15 October 2026. Check the borough review and London programme before finalising a planning statement.
Practical local questions
Bromley BNG questions
These answers reflect the adopted policies, dated council evidence and official register entries reviewed for this guide.
Does Bromley require more than the statutory 10% gain?
The verified adopted guidance refers to a minimum 10% for development within the statutory regime. Separate policies protect designated sites, species, trees and ecological networks. Meeting the numerical target does not remove those policy tests.
Is Policy 73 Bromley’s biodiversity policy?
Policy 73 is Development and Trees. Policy 79 addresses Biodiversity and Access to Nature, while policies 68–72 cover designated sites, wildlife features and protected species. Use the precise policy relevant to the proposal.
Can a small garden development be exempt from BNG?
It may qualify under a current exemption, but site size alone is insufficient. The exemption introduced from 6 August 2026 for sites no larger than 0.2 hectares includes a priority-habitat test and transitional rules. Tree, species and local-policy requirements can still apply.
Are there registered off-site habitats within Bromley?
Yes. BGS-021025002 records 29.51 hectares near Green Street Green, with planned grassland, woodland, scrub and hedgerow improvements. The register also records allocations to Bromley developments. It does not confirm current units for sale or their price.
Is the published £500 charge the total BNG monitoring cost?
No. The June 2022 Planning Obligations SPD describes £500 per head of term for general Section 106 administration. Separate bespoke monitoring and legal charges may apply. Confirm current costs and budget habitat management separately.
Can river restoration automatically supply watercourse units?
No. A restoration project must satisfy the relevant statutory metric, legal security, registration and allocation requirements before it can meet a development’s off-site BNG obligation. Public funding or a project announcement alone does not establish available units.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Evidence and further reading
Sources behind this guide
Reviewed 5 November 2026. Adopted policy, emerging proposals, historical reporting and registered allocations are distinguished throughout. No ACP involvement in the cited projects is claimed.
Borough planning and design evidence
Bromley Local Plan: policies 68–79, 115 and 116
Adopted development plan · 16 January 2019
Bromley Local Plan and interactive policies map
Current council policy gateway · Checked 5 November 2026
Urban Design Guide SPD, paragraphs 5.284–5.304
Adopted supplementary guidance; predates 2026 BNG amendments · 5 July 2023
Validation guidance and local information requirements
Published application requirements; apply current national exemptions · January 2025
Bromley validation checklist: new dwellings
Council application checklist · Checked 5 November 2026
Adopted supplementary planning guidance register
Council adoption record · Checked 5 November 2026
Bromley Town Centre SPD
Adopted supplementary guidance · 18 October 2023
Orpington Town Centre SPD
Adopted supplementary guidance · 5 July 2023
Council statement on the former Town Centre Area Action Plan
Council states the plan has expired; check current policy status for a live application · Checked 5 November 2026
New Bromley Borough Local Plan
Relaunched plan preparation; previous review archived · Checked 11 November 2026
Local Plan timetable
Scoping expected January 2027; adoption targeted September 2029 · Published 10 November 2026
Local habitats, projects and costs
Bromley Biodiversity Plan 2021–2026
Local habitat and species evidence; older metric references are historical · 2021
Enhanced Biodiversity Report 2021–2025
Council report of delivered work, trials and planned projects · Reporting period 2021–2025
Local Plan Integrated Impact Assessment scoping report
Evidence from the earlier review; not adopted replacement policy · July 2025
London Local Nature Recovery Strategy and Local Habitat Map
Published strategy · March 2026
GLA and GiGL open LNRS data, potential measures layer
Published under Open Government Licence · April 2026 dataset
BGS-021025002: registered land at TQ45676200 and allocations
Official register; not current availability or final gain-plan approval · Checked 5 November 2026
BGS-021025002 registered land boundary, near Green Street Green
Public gain-site boundary; not a unit availability map · Boundary drawing 3 April 2025
Planning Obligations SPD, Appendix 1: monitoring and legal charges
Adopted guidance; dated general charge, not a BNG tariff · June 2022
24/03840/FULL1: Duke Youth Centre, committee report, section 7.9
Design-stage ecological assessment and proposed delivery route · 6 March 2025
Duke Youth Centre: committee decision
Permission decision recorded by Plans Sub-Committee No. 1 · 6 March 2025
National and London framework
Planning Practice Guidance: scope, application evidence and gain hierarchy
Current national planning guidance · Updated 31 July 2026
BNG exempt developments
Defra guidance on exemptions · August 2026 tests
Statutory biodiversity metric tools and user guide
Statutory tools; separate area, hedgerow and watercourse modules · Current release
Make off-site biodiversity gains as a developer
Current national delivery guidance · Checked 5 November 2026
Statutory biodiversity credit prices
National government price schedule · 3 November 2026 update
Irreplaceable habitat and the biodiversity metric
Defra guidance · 3 November 2026
London Plan 2021, G1, G5, G6 and G7
Adopted strategic plan · March 2021
London Plan Urban Greening Factor guidance
London Plan Guidance · January 2023 document, published February 2023
Draft London Plan consultation
Emerging policy; consultation closed · 15 October 2026
Defra guidance for nationally significant infrastructure projects
National framework effective 2 November 2026 · Checked 5 November 2026