Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Lewisham / Local planning guide

Biodiversity Net Gain in Lewisham

Biodiversity net gain in Lewisham needs a clear habitat baseline and a response to the borough’s adopted GR3 biodiversity policy.

From Deptford and New Cross to Catford, Ladywell and Grove Park, local habitats shape the evidence your project needs. ACP connects surveys, statutory metric assessments and Gain Plans with practical design and delivery.

Reviewed 6 November 2026 · Local Plan adopted July 2025 · Current national BNG rules · Published London LNRS

Planning route / application date / habitat effects

Does statutory BNG apply to your Lewisham proposal?

Qualifying development normally needs at least 10% biodiversity gain. However, screen the permission route, application date and exemptions before defining the statutory assessment scope.

Apply the current small-site rules

For relevant applications from 6 August 2026, development on sites of 0.2 hectares or less can qualify for exemption. Assess the whole red-line area. This exemption does not apply where the proposal impacts on-site priority habitat.

Householder, de minimis and temporary-development exemptions have separate tests. The general self-build exemption ended for new applications from that date. Check transitional arrangements for earlier permissions and section 73 variations.

An exemption does not settle every ecology question

Protected-species duties, trees, local biodiversity policy and ecological networks remain relevant where affected. A small proposal beside a SINC may need ecological assessment even when the statutory gain condition does not apply.

Conversely, an in-scope proposal needs its statutory evidence even if no particular protected-species issue has been identified. Keep the legal scope statement separate from the site’s ecological impact assessment.

See the current national exemption tests and our BNG exemptions guide. The statutory metric tools were updated on 10 November 2026. Record the version and check Small Sites Metric eligibility; do not use the old Metric 4.0 label for the statutory tool.

Local Plan 2020–2040 / adopted 16 July 2025

Which Lewisham policies should shape the strategy?

Lewisham Council adopted its new Local Plan on 16 July 2025. It replaced the older Core Strategy, Site Allocations, Development Management and Town Centre plans. Apply it with the London Plan and relevant made neighbourhood plans.

The adopted green-infrastructure policies at a glance
Policy or evidencePractical meaning
GR1 — Green infrastructure and the Green Grid

Consider connected green infrastructure as part of the site’s wider setting. Explain how retention, landscape design and habitat measures contribute to a coherent network.

GR2 — Open space

Check the policies map and the applicable open-space protection. A positive biodiversity calculation does not remove separate land-use or open-space constraints.

GR3 — Biodiversity and access to nature

Address designated and non-designated biodiversity, protected and priority habitats and species, surveys, mitigation and suitable gain. The policy’s 10% provision operates alongside current statutory scope and exemptions.

GR4 — Lewisham Links

Respond to the borough’s linked green routes and connections where relevant. Consider ecological function alongside public access; these are related but different outcomes.

GR5 — Urban greening and trees

Coordinate trees and urban greening with the design. London Plan G5 Urban Greening Factor is a separate weighted score, not the percentage gain in biodiversity units.

Read the adoption record and adopted Local Plan. Establish the actual site allocation and mapped constraints. Deptford, Lewisham town centre and Catford have distinct development contexts; a neighbourhood name alone does not define the applicable allocation.

Ecological assessment / protection / delivery

What does Policy GR3 mean for applicants?

GR3 brings biodiversity protection, impact assessment and enhancement together. It should inform the layout and survey brief, rather than appear only as a policy reference at the end of a metric report.

Identify features and effects beyond the red line

GR3 protects SINCs and relevant biodiversity outside designated boundaries. Identify important habitats, species and ecological connections, then explain avoidance, mitigation and any justified compensation.

The policy also addresses effects on protected sites outside Lewisham where an impact pathway exists. Do not assume that the absence of a national designation within the borough removes every protected-site assessment question.

Use an ecological assessment where needed

GR3F addresses major development and non-major proposals likely to harm locally important wildlife or conservation sites. A competent ecologist should define the assessment and relevant mitigation.

A metric workbook does not replace that assessment. Similarly, the access-to-nature objective under GR3H is not a biodiversity-unit score. Balance access improvements with habitat sensitivity and realistic management.

Coordinate policy delivery with today’s legislation

GR3G provides for management and legal delivery mechanisms. National rules separately determine the statutory gain condition, exemptions and long-term security of qualifying gains.

The adopted plan and November 2025 council guidance predate the August 2026 changes for qualifying non-major development. Read their gain-hierarchy wording alongside the current national amendments.

A practical briefing asset

Seven checks before fixing your habitat strategy

Use these checks to brief the planning, landscape and ecology team. They connect Lewisham’s policy requirements with the information needed for the next project decision.

  • Record the red-line area, application date, permission history and priority-habitat impacts. Identify the legal basis for any exemption.

  • Apply GR1–GR5 and the actual policies map, allocation and neighbourhood plan. Do not rely on a superseded 2014 development-management policy.

  • Check SINCs, protected species, trees, river reaches and local connections. Determine the relevant GR3 ecological assessment and survey programme.

  • Use suitable fieldwork, condition assessment and the statutory metric. Keep area habitat, hedgerow and watercourse accounts distinct where applicable.

  • Calculate required urban greening separately. Match London LNRS measures to the actual habitat and location before assigning strategic significance.

  • Apply Lewisham’s case-specific on-site guidance. Identify legal security, management responsibilities, monitoring and remedial action for qualifying gains.

  • Prepare application-stage evidence, then obtain formal Gain Plan approval where required before commencement. Verify off-site allocation and separate the cost categories.

This checklist supports scoping. It does not replace surveys, determine a legal exemption or confirm available biodiversity units. Start with the boundary plan and any existing council advice.

Council guidance / November 2025 / case-specific assessment

Which on-site habitat gains need long-term security?

Lewisham’s November 2025 guidance explains how it considers significant on-site habitat enhancements. The decision depends on the habitat and development context, rather than a blanket rule for every landscape feature.

Consider value, scale and ecological connections

The council considers habitat distinctiveness, condition improvement and the extent of habitat relative to the development. It also considers SINCs, local ecological networks, priority habitats, LNRS locations and access-to-nature deficiency.

Discuss these factors early where gains are integral to the design. Provide enough habitat detail for the planning decision and explain how the intended condition will be established and maintained.

Do not equate retention with enhancement

The guidance says retention alone is not on-site enhancement. Small movable planters, amenity grassland, low-value introduced shrubs and individual street trees are usually not significant, but their context can change the assessment.

For qualifying significant enhancements, appropriate conditions or legal agreements secure at least 30 years of maintenance. Other ecological planning obligations can also apply. Agree the mechanism and scope for the actual scheme.

Read the significant on-site BNG considerations with current national guidance. Our Habitat Management and Monitoring Plan support connects habitat targets with practical maintenance, reporting and remedial responsibilities.

Ravensbourne / Quaggy / parks / woodland / urban connections

Understand Lewisham’s ecological setting

GiGL’s February 2026 factsheet records 69 SINCs covering 546.4 hectares, or 15.5% of Lewisham. It also maps 75.1 hectares of priority habitat. These are borough summaries, not findings about an individual development plot.

Ravensbourne, Ladywell Fields and Waterlink Way

Linked parks and the Ravensbourne corridor create opportunities to connect habitat design with river restoration and access to nature. The Quaggy and its setting add another important water network.

Establish the actual affected reach, bank condition and impact pathways. Coordinate drainage, lighting, landscape and relevant consents. Proximity to a river does not automatically determine the survey scope or metric outcome.

Deptford Creek and the Thames edge

The tidal waterfront has different ecological and design questions from an inland park or freshwater reach. Deptford and New Cross regeneration proposals need attention to their actual boundaries and surrounding habitats.

Consider tidal conditions, shading, disturbance and connections beyond the red line. Do not assume that generic riverside planting can replace any type of lost habitat unit.

Beckenham Place Park and southern connections

Woodland, grassland and parkland contribute to the borough’s wider green network. Hither Green to Grove Park is a locally important conservation corridor identified in the adopted plan’s examination changes.

Use the final adopted mapping, rather than an old draft boundary. Assess retention and appropriate management before proposing creation elsewhere. Public parkland is not automatically registered gain-site supply.

Forest Hill, Sydenham, Brockley and urban infill

Woodland connections, railway edges, gardens and street trees can support movement through built-up areas. On smaller plots, existing vegetation and brownfield habitats still need competent assessment.

Survey before clearance. Roofs, rain gardens and planting can contribute where their habitat classification, condition and management are realistic. Location alone cannot establish a low baseline or absence of protected species.

The February 2026 GiGL factsheet also records 218.2 hectares deficient in access to nature. Earlier editions use different figures; do not describe the difference as measured habitat gain. Use current licensed records, adopted mapping and Natural England MAGIC for site-specific work.

London Plan / published LNRS / separate calculations

Connect local design with London’s nature priorities

Urban Greening Factor, statutory biodiversity units and LNRS mapping serve different purposes. A coherent landscape proposal can respond to all three, but one result cannot stand in for the others.

Use GR5 and London G5 for urban greening

For relevant major schemes, calculate the weighted greening score using the GLA guidance. The London Plan’s interim targets are 0.4 for predominantly residential and 0.3 for predominantly commercial development, excluding B2 and B8 uses.

A score of 0.4 is not 40% BNG. Coordinate roofs, trees and drainage with the habitat assessment while keeping each calculation and its assumptions clear.

Read the LNRS measure and the mapped location

The London LNRS was published on 9 March 2026. Its public spatial dataset was updated on 30 September. Review existing biodiversity importance, potential recovery areas and relevant measures.

Justify strategic significance for the actual habitat and parcel. The open dataset is a subset, so fuller GiGL evidence may be needed. A recovery opportunity is not a new designation or proof of units for sale.

Lewisham’s adopted plan predates publication of the London strategy. Read its forward-looking nature-recovery wording in that context. The London Plan G1, G6 and G7 policies also address green infrastructure, biodiversity and trees.

New Cross Road / June 2026 / separate ecology duties

What Lewisham’s published evidence demonstrates

A planning report and a borough biodiversity update illustrate two distinctions: exemption is not the end of ecological assessment, and estimated landscape value is not saleable unit stock.

446 New Cross Road: an exemption example

The 23 June 2026 Planning Committee A report for DC/26/143566 considered a proposal at 446 New Cross Road exempt under the de minimis habitat-impact test. Officers still assessed GR3 and London biodiversity policy.

The June 2026 officer report predates the August 2026 small-site exemption. Its analysis and recommendation do not independently verify a final decision, approved Gain Plan or habitat outcome. The council’s meeting record and report listing provide an official route back to the case. Direct archive links may change.

Borough nature accounting is not a habitat bank

The council’s January 2026 biodiversity update discussed an estimated 10,000 biodiversity units across borough land using satellite-derived modelling. It also considered trees, nature programmes and community activity.

Those estimates are not registered, unsold units available to developers. An operator’s legally secured gain site and a development-specific allocation require separate evidence. No ACP involvement in these public examples is claimed.

The practical lesson is to check what each document actually establishes. A planning recommendation, a modelled landscape estimate and monitored habitat delivery are different types of evidence.

Current council gateway / national minimum / post-permission plan

Prepare the right evidence at the right stage

Lewisham’s current validation gateway still links October 2022 lists. Its consultation on proposed revisions closed on 29 September 2026. No final replacement list following that consultation was independently verified at this review.

With an in-scope planning application

Provide the required BNG applicability statement, baseline biodiversity value, completed statutory metric and scaled habitat plan. Address relevant earlier baseline dates, degradation and irreplaceable habitats under the national requirements.

Coordinate GR3 ecology reports, trees, landscaping, drainage and UGF evidence as applicable. The older local checklists do not replace current national law. Confirm the relevant local submission requirements for the proposal.

After permission and before development

Where the statutory gain condition applies, the formal Biodiversity Gain Plan normally follows permission and needs approval before commencement. Check the relevant rules for phased schemes and any specific conditions.

Reconcile the final habitat proposals, management commitments and registered off-site allocation where used. An early draft strategy can support design, but it is not formal approval of the gain condition.

Use the validation gateway, council BNG application guidance and official Gain Plan requirements. Our BNG process guide explains the wider sequence.

Registered land / suitable habitats / dated availability

How should you verify off-site units for Lewisham?

No buyer-ready Lewisham gain site with independently verified remaining units and a current seller quotation was established in this research. This is an evidence limit, not a claim that suitable private supply does not exist.

Check the registered parcel and actual stock

Start with the official biodiversity gain-sites register. Check habitat details, legal security and recorded allocations. Then request dated operator confirmation of unsold units, reservation terms and what the quotation includes.

A park, SINC, restoration project or LNRS opportunity is not automatically a saleable habitat bank. Registration alone does not guarantee enough units remain for your shortfall.

Match habitat and location to the shortfall

Apply the metric’s trading rules and relevant spatial-risk factors. Area habitat, hedgerow and watercourse accounts are distinct. A nearby offer may still be unsuitable for the habitat requirement.

Use the current gain hierarchy for the development category. Qualifying non-major schemes have different on-site and off-site treatment following the August 2026 amendments; do not apply older guidance without that check.

Complete the required allocation to your development. Government statutory biodiversity credits are a separate last-resort route. Neither a seller’s marketing claim nor a borough-wide model secures the required delivery.

Assessment / administration / legal delivery / long-term work

What should a Lewisham BNG budget cover?

No current fixed Lewisham tariff for 30-year BNG monitoring was independently verified. Agree the applicable legal and monitoring contributions for the scheme, separately from survey fees and any purchased units.

Separate the budget into clear cost categories
Budget categoryWhat to establish
Ecological assessment and plans

Allow for habitat surveys, condition assessment, metric calculations and relevant species or river evidence. The required seasons, access and design changes affect the professional scope.

National Gain Plan administration

The April 2026 national schedule lists £309 for the relevant non-householder condition-approval route. Check the prescribed fee at submission. This is not a council long-term monitoring tariff.

Council legal and monitoring work

Request the project-specific agreement and fee basis. Define reporting frequency, inspection responsibilities and remedial action. Do not import a neighbouring borough’s charge.

Habitat creation and management

Budget for establishment, maintenance and monitoring over the secured period. Confirm ownership, access and funding against the proposed condition targets.

Purchased units or statutory credits

Obtain a current habitat-specific quotation, checking legal, allocation and management inclusions. Government credit prices are a separate schedule with their own applicable multipliers.

Lewisham’s 2026/27 budget appendix lists £309.32 for a BGP item, while the national schedule lists £309. These are not two fees to add together. Confirm the prescribed payment amount when submitting; our BNG costs guide explains the wider distinctions.

Site-specific scope / coordinated evidence

Discuss biodiversity net gain in Lewisham

Share your red-line plan, development proposal, planning stage and any existing ecology reports. Flag river frontage, trees, nearby designated habitats and time-sensitive surveys at the outset.

ACP’s BNG assessments establish the habitat baseline and metric evidence. Our Biodiversity Gain Plan support connects the final proposal with its approval and delivery requirements. Speak to our BNG consultants about the next decision your project needs.

For the wider framework, see the London BNG guide. Existing neighbouring guides cover Greenwich, Bromley and Southwark. Establish the actual authority boundary before using a borough’s policy or validation list.

Send your site details to ACP →

Policy / significant gains / submission stages

Lewisham BNG questions

These answers address common local decisions. Use the current source documents and actual site evidence when agreeing a project brief.

Is Lewisham’s new Local Plan adopted?

Yes. Lewisham adopted its Local Plan 2020–2040 on 16 July 2025. It replaced the older Core Strategy, Site Allocations, Development Management and Town Centre plans. Use its GR1–GR5 policies alongside the London Plan and relevant made neighbourhood plans.

Does GR3 require an ecological assessment on an exempt site?

It can. GR3 addresses major development and non-major proposals with likely adverse effects on locally important wildlife or conservation sites. Statutory BNG exemption does not remove relevant ecological planning requirements or protected-species duties. Scope the assessment around the actual site and impacts.

Is every retained tree a significant on-site gain?

No. Retention alone is not on-site enhancement. Lewisham’s guidance considers significance case by case, including habitat value, scale and ecological connections. Other tree or biodiversity obligations may still protect retained features even where statutory significant-enhancement rules do not apply.

Are the September 2026 validation proposals now adopted?

The consultation closed on 29 September 2026. At the 6 November review, the council gateway still linked October 2022 lists and no final replacement was independently verified. Confirm the applicable local list and apply the current national BNG information requirements.

Does a 0.4 Urban Greening Factor mean 40% BNG?

No. UGF is a weighted design score for greening. Statutory BNG compares biodiversity units against a habitat baseline. A roof, tree or rain garden may contribute to both, but each calculation needs its own valid classification and evidence.

Does Lewisham have 10,000 units available to buy?

The council committee discussed an estimated borough landscape value derived from satellite modelling. It was not a statement of registered, unsold biodiversity units. Verify any actual offer through the official gain-site register, legal documents and dated operator confirmation.

When must the formal Biodiversity Gain Plan be approved?

Where the statutory gain condition applies, formal approval normally follows permission and is required before development begins, subject to the relevant phased-development rules. Application-stage metric information or a draft strategy does not itself discharge that condition.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.