Greenwich BNG / Local planning guide
Biodiversity Net Gain in Greenwich
Biodiversity net gain in Greenwich connects development on the Peninsula, in Woolwich and across Eltham with the Thames, urban wetlands and woodland networks.
Understand Royal Greenwich’s planning policies, current exemptions and local evidence. Then coordinate your habitat survey, statutory metric and delivery strategy before fixing the layout.
Evidence reviewed 5 November 2026 · Adopted and emerging policy distinguished
Start with the site and application date
Does your Greenwich scheme need BNG?
Royal Borough of Greenwich is the local planning authority. First establish your red-line boundary, application date and exemption position. Then assess the adopted development plan and site constraints.
The statutory target
Non-exempt development must achieve at least 10% biodiversity net gain using the current statutory biodiversity metric. The statutory Biodiversity Gain Plan normally needs approval after permission and before development begins.
Significant on-site enhancements and registered off-site gains require at least 30 years of secured management. The Biodiversity Gain Plan and management arrangements must describe the same habitat proposals.
Check the August 2026 exemptions
For relevant applications from 6 August 2026, sites of 0.2 hectares or less can qualify for exemption. This route does not apply where on-site priority habitat loses biodiversity value. Temporary permissions lasting five years or less also have qualifying conditions.
The separate self-build exemption ended for new applications from that date. Earlier applications and variations need transitional checks. Use our BNG exemptions guide and current government tests.
Ecology duties still apply
An exemption from statutory BNG does not remove protected-species duties, tree controls or designated-site safeguards. Therefore, establish those requirements separately from the metric.
Likewise, an urban greening calculation cannot replace a biodiversity assessment. Strategic applications may also require referral to the Mayor. Check the London BNG guide for the wider planning context.
National → London → Royal Greenwich
Which adopted policies govern Greenwich BNG?
The borough is not governed by a single biodiversity percentage. Its adopted Core Strategy, London policies and national statutory requirements have distinct roles.
| Reference or evidence | Meaning for your Greenwich project |
|---|---|
| Core Strategy OS4 — Biodiversity | The July 2014 Core Strategy protects and enhances biodiversity. Consider avoidance, existing habitats and ecological networks before calculating residual gains. BNG does not cancel separate mitigation requirements. |
| OS(e), OS(f) and OS(g) | OS(e) addresses wildlife deficiency; OS(f) ecological factors; OS(g) green and river corridors. Assess whether surveys, species evidence and corridor protection apply to the actual parcel. A metric workbook does not replace a required ecological report. Equally, an access-to-nature deficiency area does not automatically qualify for a strategic-significance uplift. |
| OS1–OS3 — Open-space networks | Check open-space protection, Metropolitan Open Land and the South East London Green Chain. These policies can constrain land use independently of a positive BNG score. Record the current designation boundary and explain how the layout retains or improves relevant connections. |
| Climate Resilience SPD — March 2026 | The council adopted the Climate Resilience SPD and revoked Greener Greenwich through its March 2026 decision, effective 25 March. Use the replacement guidance when coordinating landscape, drainage and climate resilience. This change does not itself establish a new mandatory BNG percentage. Read the adoption and revocation decision. |
| Design and regeneration guidance | The October 2023 Urban Design Guide SPD supports coordinated design. The June 2017 Charlton Riverside Masterplan SPD adds place-specific context for that regeneration area. Read the Urban Design Guide and Charlton Riverside guidance alongside applicable adopted policies. Older anticipated BNG commencement dates must not override current law. |
Policy status / November 2026
Urban greening and the emerging Greenwich Local Plan
The London Plan 2021 remains the adopted strategic framework. Greenwich’s Regulation 19 replacement Local Plan is emerging, following consultation from 27 July to 6 September 2026.
London Plan G1, G5, G6 and G7
G1 addresses green infrastructure, G5 urban greening, G6 biodiversity and access to nature, and G7 trees and woodland. For major development, assess the Urban Greening Factor separately.
The Mayor’s interim UGF targets are 0.4 for predominantly residential and 0.3 for predominantly commercial schemes, excluding B2/B8. UGF measures weighted green cover; the statutory metric measures biodiversity units. Read Chapter 8 and the adopted UGF guidance.
Draft EN3 — no adopted higher percentage
Emerging EN3(2) encourages liable schemes to exceed 10% where feasible and appropriate, considering context, scale and viability. It also encourages on-site gains for non-liable schemes. These are proposals, not an adopted blanket higher target.
Draft EN3(4–5) prefers on-site delivery and borough-based off-site provision where feasible. This is not proof of local unit availability or a universal legal obligation to buy within Greenwich. Read the 2026 Regulation 19 text.
Changes to watch before submission
Draft EN1 proposes extending UGF expectations to a wider range of new buildings. Draft EN3 paragraph 8.46 proposes monitoring in years 1, 3 and then every five years. Neither should be presented as a currently adopted borough-wide requirement.
Check the Local Plan examination and consultation gateway for subsequent decisions. The next London Plan is also emerging; do not merge draft proposals into adopted London Plan requirements.
Useful local asset / map-check guide
Which nature-recovery layers should you check?
London’s Local Nature Recovery Strategy was published in March 2026. Its public spatial data was updated on 30 September 2026. Use these layers to investigate opportunities, then confirm parcel boundaries, the relevant measure and site feasibility.
| Reference or evidence | Meaning for your Greenwich project |
|---|---|
| Adopted policy and designation maps | Locate the red-line site against SINCs, Metropolitan Open Land, the Green Chain and river corridors. Keep a dated extract and the applicable policy references. Start with the adopted Core Strategy. Historic plan inventories require current ecological records and designation checks. |
| LNRS: APIB, ACB and potential measures | Distinguish Areas of Particular Importance for Biodiversity from Areas that Could become important and Potential Measure Locations. An opportunity does not create a new designation, planning permission or gain-site allocation. Compare the London LNRS mapping and metadata with the Statement of Biodiversity Priorities. The public dataset is a subset; obtain fuller evidence where its attributes do not answer the site question. |
Connect the mapped evidence to the metric
| Reference or evidence | Meaning for your Greenwich project |
|---|---|
| GiGL borough evidence | The February 2026 factsheet records 55 SINCs covering 1,126.1 hectares, or 22.3% of Greenwich. It also reports 191.1 hectares of priority habitat and 723.1 hectares deficient in access to nature. These are dated borough-wide figures, not findings about your plot. Use the Greenwich factsheet to frame the context, then commission the relevant records search and survey. |
| Metric strategic significance | Check whether the specific habitat proposal meets the current statutory metric’s strategic-significance rules and documented local priorities. Location within an opportunity layer does not automatically establish the right score. Record the measure, habitat fit, mapped extent and evidence used. Also check condition, distinctiveness, delivery time and separate watercourse or hedgerow accounts. |
| Gain-site register and allocation | Check the registered boundary, reference, habitat categories and allocation records. Then obtain current operator confirmation of available units and legal arrangements. The official biodiversity gain sites register is a starting point for due diligence, not a live price list or a guarantee of unreserved stock. |
From the Thames to the Green Chain
Local habitats that can influence the design
Greenwich includes very different ecological settings. The examples below identify checks to make; they do not imply that a development contains a habitat or species merely because it occurs nearby.
Oxleas, Bostall and the woodland network
Oxleas and the Shooter’s Hill woodlands create sensitive woodland connections. Bostall Woods and Heath add woodland and heathland context near Plumstead and Abbey Wood.
Check the exact ancient-woodland, SSSI, LNR and SINC boundaries rather than assigning every designation to every named parcel. Ancient woodland is not ordinary replaceable metric habitat. Retained trees, buffers and lighting can materially influence layouts.
The Thames and urban regeneration
Greenwich Peninsula, Charlton Riverside and Woolwich sit within a wider riverside network. Former industrial land may contain valuable habitat, including open mosaic habitat where survey evidence supports that classification.
Assess the foreshore, drainage, flood risk and relevant ecological consents alongside BNG. A cleared-looking site is not necessarily ecologically empty, and an attractive green roof does not automatically replace the habitat lost.
Quaggy wetlands and connected open space
Sutcliffe Park’s restored river and wetland setting illustrates why watercourse, wetland and flood-management design should be coordinated. The council identifies it as a Local Nature Reserve.
Meanwhile, the Green Chain, railway corridors and Thamesmead connections can influence movement through urban areas. Read the Sutcliffe Park site record. A public nature reserve is not automatically an available off-site unit source.
Nature access and geological sites
Greenwich Park, Blackheath and Charlton’s parks contribute to the wider green network. Use current records to assess local habitat condition, mature trees and access-to-nature priorities.
Gilbert’s Pit is a geological SSSI. Its geological importance is not a measure of saleable biodiversity units. Keep geodiversity, species, habitat and public-access evidence distinct when explaining constraints. Check geological site citations.
Documented Greenwich evidence
What do local planning examples show?
These public examples illustrate practical planning questions. They are not ACP project claims, proof of delivered biodiversity gain or confirmation of current off-site stock.
177 Footscray Road, Eltham — 25/0134/F
The Planning Board considered the former sports ground on 2 December 2025. Public records discuss trees, ecological effects, landscape design and difficulties achieving the required gain entirely on site. Conditions address matters including permeability, landscaping and canopy cover.
The lesson is to coordinate trees, habitat retention and delivery options early. Historical comments about off-site difficulties do not establish today’s unit supply. Read the council decision and committee discussion.
The O2, Peninsula Square — 25/3495/BGP
The council’s 3–7 November 2025 bulletin records details for Condition 9, the Biodiversity Gain Plan, and Condition 10, the Habitat Management and Monitoring Plan. These relate to permission 25/0582/F, dated 29 August 2025.
This shows why the gain plan and long-term management evidence need separate, coordinated attention. The bulletin confirms a submission; it does not by itself prove approval or implementation. Read the council planning bulletin.
Charlton Riverside — regeneration context
The council approved a regeneration scheme and estimate on 29 October 2026, with the decision effective on 5 November. That decision concerns regeneration and partnership work, not biodiversity units for sale.
Across Charlton, Woolwich, Thamesmead and Kidbrooke, assess each parcel’s baseline and green connections before assuming a standard delivery solution. Read the Charlton Riverside decision.
Delivery hierarchy and supply checks
How to assess off-site BNG units for Greenwich
Private off-site biodiversity units and government statutory credits are different routes. Establish the applicable hierarchy and metric rules before choosing either.
Start with the applicable hierarchy
For major development, follow the statutory gain hierarchy and explain residual off-site needs. Relevant minor developments have greater flexibility following the August 2026 changes; establish the scheme category first.
Statutory credits remain a last resort. A draft preference for Greenwich-based delivery does not establish a universal borough-only purchasing requirement. Check current LPA guidance.
Verify habitat and legal compatibility
Check the unit type, amount, location, trading rules and spatial factors for your development. Area, hedgerow and watercourse accounts are separate. A cheaper unit is not useful if it cannot meet the actual deficit.
Confirm registration, legal security, management arrangements and the allocation to your development. Also verify the operator’s current stock, reservations, price basis and terms before relying on a supply option.
Keep availability claims qualified
The reviewed evidence does not establish a current Greenwich unit quantity, fixed market price or available council habitat bank. That does not mean no suitable supply exists.
ACP can assess options against the metric and supporting legal evidence. Obtain written availability confirmation before committing the planning strategy; an LNRS opportunity or named nature reserve is not a purchase offer.
Different costs / different responsibilities
What should a Greenwich BNG budget include?
Separate professional assessment, habitat delivery, statutory administration and long-term management. A single headline unit price cannot represent the whole project cost.
| Reference or evidence | Meaning for your Greenwich project |
|---|---|
| Planning condition approval — £309 | The national fee for a non-householder condition-approval application is £309 from 1 April 2026, including a relevant Biodiversity Gain Plan condition request. This is not ACP’s fee or a Greenwich monitoring contribution. Check the current national fee schedule. Proposed future fee increases must not be presented as rates already in force. |
| Gain-site administration — £639 / £45 | Natural England guidance reviewed on 5 November lists £639 to register a gain site and £45 to record an off-site allocation. These are distinct administration charges, not biodiversity unit purchase prices. Check registration fees and allocation fees at the transaction date and confirm which party bears each cost. |
| Monitoring, legal work and habitat management | No definitive published Greenwich-specific BNG monitoring tariff was verified. Contributions and legal work may depend on the scheme and agreement. Do not treat a draft monitoring timetable as a published charge. Budget for establishment, management, monitoring, reporting and remedial work over the required period. Clarify responsibilities and funding in the management plan. |
| Consultancy, units and statutory credits | Survey scope, habitat complexity, seasonal evidence and design revisions influence professional fees. Private units vary by habitat and location; statutory credits follow government prices and metric rules. Use our BNG costs guide to organise the scope, then request a project-specific quotation. |
Application → permission → delivery
Prepare your Greenwich BNG submission
Use this checklist alongside the published Greenwich validation list. Application-stage biodiversity evidence and post-permission Gain Plan approval are different steps.
Record the red-line area, application date and exemption basis. Check priority habitat and any transitional rules. An exemption must be supported by evidence, not assumed from the development label.
Use the current statutory biodiversity metric where required. Record the baseline value, tool version, survey evidence and scaled habitat plan with a north arrow. Explain earlier baseline dates, degradation and irreplaceable habitats.
The published June 2025 list distinguishes BNG information from a separate Biodiversity and Ecology Report. Check the live requirements and proportionate survey scope. Historical metric names in older documents must not override the current tool.
Reconcile habitat parcels, landscaping, retained trees, drainage and UGF calculations. Check protected-species evidence independently. Resolve inconsistent drawings and metrics before submission.
Where statutory BNG applies, obtain Biodiversity Gain Plan approval before starting development. Include required off-site allocations, legal arrangements and a coordinated Habitat Management and Monitoring Plan.
Name the parties responsible for establishment, management, monitoring and reporting. Set access, funding and remedial arrangements. Secure the required 30-year period for significant on-site enhancements and registered off-site gains.
Practical assessment and delivery support
Bring the site evidence together
Share the site location, red-line plan, proposal and planning stage. We can scope the habitat evidence and identify the decisions that need resolving before the design progresses.
Start with a BNG assessment and habitat baseline. Where needed, coordinate this with the Biodiversity Gain Plan and Habitat Management and Monitoring Plan. Confirm seasonal and protected-species requirements separately.
For a site near a borough boundary, also check the relevant authority. Explore our Bexley, Lewisham and Bromley guides where those locations are relevant. The London hub explains the shared strategic context.
Local planning questions
Greenwich BNG questions
These answers distinguish adopted requirements, emerging proposals and evidence needed for an individual site.
Does Greenwich require more than 10% BNG?
The statutory minimum for non-exempt development is 10%. Greenwich’s emerging Regulation 19 Policy EN3 encourages higher gains where feasible and appropriate, but it is not an adopted blanket higher percentage. Check policy status and any site-specific requirements at the decision stage.
Does a small Greenwich site still need an ecology report?
It may. A qualifying statutory BNG exemption does not remove protected-species duties, designated-site safeguards or local ecology requirements. Greenwich’s validation list treats biodiversity and ecology reports separately from BNG information. Establish the site’s constraints before deciding the survey scope.
Is urban greening the same as biodiversity net gain?
No. The Urban Greening Factor scores weighted green cover, while the statutory biodiversity metric assesses habitat units. Major schemes may need both. Coordinate the design, but demonstrate each requirement using the correct assessment.
Does an LNRS opportunity mean off-site units are available?
No. A potential measure identifies a nature-recovery opportunity. It does not confirm landowner participation, planning consent, gain-site registration, unallocated units or a selling price. Verify those matters before relying on the site for delivery.
Has the Greener Greenwich SPD been replaced?
Yes. The council’s March 2026 decision adopted the Climate Resilience SPD and revoked Greener Greenwich, effective 25 March 2026. Older validation documents may retain historic references. Use the current adopted guidance and check application-specific requirements.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Evidence register
Sources and review dates
Primary evidence reviewed 5 November 2026. Adopted policies, emerging proposals, historical examples and supply limitations are labelled separately.
Greenwich policies and planning evidence
Royal Greenwich Core Strategy with Detailed Policies (Royal Borough of Greenwich)
Adopted July 2014 · Checked 5 November 2026
Urban Design Guide SPD
Adopted October 2023 · Checked 5 November 2026
Climate Resilience SPD adoption and Greener Greenwich revocation
Decision 18 March 2026; effective 25 March 2026 · Checked 5 November 2026
Regulation 19 consultation gateway
27 Jul–6 Sep 2026, closed, draft not adopted · Checked 5 November 2026
Replacement Local Plan: Regulation 19 environment chapter
2026 emerging; pp. 461–474 for EN1–EN3; EN3 at chapter PDF pages 12–15 (reader zero-based pages 11–14) · Checked 5 November 2026
Local Validation Requirements List
June 2025 published · Checked 5 November 2026
Council Charlton Riverside regeneration page
SPD refreshed June 2017; council page live · Checked 5 November 2026
Council decision Charlton Riverside Scheme and Estimate
Approved 29 Oct 2026, effective 5 Nov 2026 · Checked 5 November 2026
Royal Greenwich planning applications bulletin 3–7 Nov 2025
Council primary 2025 · Checked 5 November 2026
177 Footscray Road planning decision, 25/0134/F
Planning Board, 2 December 2025 · Checked 5 November 2026
177 Footscray Road committee discussion
Planning Board, 2 December 2025 · Checked 5 November 2026
Nature recovery and local habitats
GLA public announcement LNRS launch
Published 9 March 2026 · Checked 5 November 2026
London Datastore, **LNRS GIS 3 layers**
Last update 30 Sep 2026, OGL subset only · Checked 5 November 2026
GLA LNRS Statement of Biodiversity Priorities
March 2026 · Checked 5 November 2026
GiGL Greenwich Borough Factsheet
February 2026 · Checked 5 November 2026
Borough factsheets and ecological data searches (GiGL)
Live guidance; data varies by vintage/licence · Checked 5 November 2026
London geodiversity citations (GiGL)
Current listing; geological · Checked 5 November 2026
Royal Greenwich council Sutcliffe Park record
Council listing; designated LNR 2006 · Checked 5 November 2026
National and London framework and charges
Greater London Authority London Plan 2021, Chapter 8
Adopted 1 March 2021 · Checked 5 November 2026
GLA Urban Greening Factor London Plan Guidance
Adopted 2 February 2023 · Checked 5 November 2026
Defra, BNG exempt developments
Updated 6 Aug 2026, current guidance · Checked 5 November 2026
Defra, BNG guidance for local planning authorities
Updated 14 July 2026 and related statutory August reforms · Checked 5 November 2026
UK government 2026 national planning fee schedule
Effective 1 Apr 2026 · Checked 5 November 2026
Defra search registered biodiversity gain sites
Updated 3 Nov 2026; live search portal · Checked 5 November 2026
Defra/Natural England register gain site
Updated 3 Nov 2026 · Checked 5 November 2026
Defra: record allocation of off-site biodiversity gains to a development
GOV.UK updated 3 Nov 2026 · Checked 5 November 2026
Defra statutory biodiversity credit prices
Dynamic current price schedule · Checked 5 November 2026