Southwark / Local planning guide
Biodiversity Net Gain in Southwark
Biodiversity net gain in Southwark connects statutory habitat calculations with Policy P60, urban greening and practical long-term habitat delivery.
From Bankside and Bermondsey to Peckham, Camberwell, Nunhead and Dulwich, development sites have different ecological constraints. ACP coordinates habitat surveys, metric assessments and Gain Plans with the planning and landscape design.
Reviewed 6 November 2026 · Southwark Plan adopted 2022 · Climate and Environment SPD adopted 2025 · Published London LNRS
Current law / adopted policy / site evidence
Does your Southwark proposal need statutory BNG?
Qualifying planning permissions normally require at least 10% biodiversity gain. However, determine the legal scope before choosing a metric route or assuming the project needs off-site units.
Check the current exemption tests
For relevant applications from 6 August 2026, sites of 0.2 hectares or less can qualify for exemption. However, this does not cover development affecting on-site priority habitat. Assess the whole red-line site and the actual habitat effects.
Householder, de minimis and temporary-development exemptions have separate tests. Meanwhile, the general self-build exemption ended for relevant new applications. Earlier permissions and section 73 cases need transitional checks.
Keep ecology and statutory gain distinct
An exemption from the statutory gain condition does not remove every ecological planning requirement. For example, Policy P60, protected-species law, trees and river-corridor policies may still affect an exempt scheme.
Conversely, an in-scope proposal needs suitable habitat calculations even without an identified protected-species issue. Therefore, explain the legal route and the ecological assessment separately in the site brief.
Check the current government exemptions and our BNG exemptions guide. The statutory biodiversity metric tools were updated on 10 November 2026. Also check Small Sites Metric eligibility separately; site size alone does not establish it.
Southwark Plan 2019–2036 / adopted 23 February 2022
Which Southwark policies shape the application?
Southwark Council applies its adopted Local Plan alongside the London Plan and relevant site policies. P60 is the main biodiversity policy. However, trees, open water, drainage and landscape requirements often influence the same design decisions.
| Policy or evidence | Practical meaning |
|---|---|
| P60 — Biodiversity | Protect and enhance SINCs, Local Nature Reserves, ancient woodland and relevant species or habitats. Integrate suitable roofs, walls, planting and ecological links. A numerical gain does not remove separate conservation duties or make harmful habitat loss acceptable. |
| P59 — Green infrastructure | Connect the site’s green features with surrounding ecological networks. For example, coordinate a landscaped boundary with nearby trees or a wildlife corridor instead of treating planting as an isolated finishing item. |
| P57 — Open space | Check protected open space and its quality, access and function. Public recreation provision and statutory biodiversity units serve different purposes, even where one landscape supports both. |
| P58 — Open water space | Address the Thames, docks and other relevant water environments. Also distinguish tidal habitat, freshwater features and actual development effects before selecting survey methods or calculating watercourse units. |
| P61 — Trees | Coordinate tree retention, replacement and arboricultural assessment with the habitat baseline. Tree amenity valuation, replacement contributions and the metric’s tree calculations are different measures. |
| P68 and P13 — Flood risk and place design | Integrate drainage, landscape, public space and ecological design. However, flood-storage capacity or an attractive planting plan does not automatically demonstrate a qualifying habitat gain. |
Use the Southwark Plan 2022 gateway and adopted plan and policy wording. P60’s reference to off-site obligations does not bypass national registration and allocation rules. Also check the relevant site allocation and current policies map before fixing the strategy.
Climate and Environment SPD / adopted 14 October 2025
What does the adopted environmental guidance add?
Chapter 5 of the Climate and Environment SPD translates the plan into practical ecological and landscape considerations. It addresses mitigation, biodiversity gain, green infrastructure, trees and management. Use it with current national law, particularly where older eligibility wording has changed.
Make green roofs and planting deliverable
Living roofs, bio-solar roofs, rain gardens and suitable planting can contribute to a coordinated design. However, their ecological value depends on substrate, water, space, establishment and long-term care.
For example, a roof needs an achievable habitat specification and maintenance access. Similarly, a tree needs suitable rooting space. Do not assign a target condition simply because a landscape drawing labels an area as green.
Assess whether on-site gains are significant
The SPD considers habitat size, complexity, distinctiveness, condition and the scale of improvement relative to the site. Therefore, significant gain involves ecological and planning judgement rather than one universal planting threshold.
Qualifying significant gains need appropriate legal security and management. The council discusses monitoring milestones, but the approved HMMP and agreement determine the actual schedule. Avoid assuming that every planting scheme needs an identical 30-year reporting programme.
Read the adoption page and Climate and Environment SPD, Chapter 5. The document predates August 2026 exemption and hierarchy changes. Therefore, apply current national rules where older wording differs, while retaining relevant P60 ecological protections.
A practical briefing asset
Seven checks before finalising the site strategy
Use these checks to coordinate planning, ecology and landscape work. They focus the brief on the decisions Southwark evidence can resolve, without treating every development as ecologically identical.
Record the red-line area, permission route and priority-habitat effects. Then check current exemptions and transitional arrangements before choosing the metric route.
Check the adopted policies map, SINCs, reserves, woodland and relevant allocation. Also assess ecological duties that remain on a statutorily exempt proposal.
Use competent survey and condition evidence with appropriate records. In addition, scope trees, species, roofs, gardens and watercourses according to actual impacts.
Keep biodiversity units and weighted green surfaces distinct. Then align habitat plans with drainage, levels, roof build-up, rooting space and maintenance access.
Review each relevant area, hedgerow and watercourse account. A percentage above 10% can still leave a habitat-specific trading shortfall.
Provide the applicable national minimum and council-requested plans, metric tabs and explanation. Also verify registered supply and allocation where off-site units are proposed.
Allow for the formal Gain Plan after permission and before commencement. Finally, identify significant-gain management duties and separate council, professional and habitat costs.
Begin with the site boundary and proposal, even if other reports are incomplete. This checklist supports scoping; it does not establish an exemption or replace competent field evidence.
National minimum / local checklist / proposed habitat design
What should a Southwark application include?
The council’s full and outline checklists distinguish national BNG information from additional local evidence. For an in-scope proposal, use the appropriate checklist alongside current statutory rules. Some council eligibility wording predates the August 2026 changes.
| Evidence item | Purpose and qualification |
|---|---|
| Applicability and baseline information | Explain whether mandatory BNG applies and substantiate an exemption where claimed. For in-scope proposals, provide the required baseline value, habitat plan and relevant date, degradation or irreplaceable-habitat information. |
| Pre- and post-development metric evidence | Southwark asks for relevant proposed-development calculations as well as baseline evidence. Also explain habitat trading, the applicable gain hierarchy and realistic delivery assumptions in the supporting report. |
| Habitat maps, photographs and proposed plans | Provide scaled existing habitats and suitable draft post-intervention plans. If off-site gains are proposed, explain the source and relevant habitat information. Keep drawings and metric versions consistent. |
| Separate ecology and landscape documents | Scope species, trees, ecological effects, urban greening and drainage evidence where the site requires them. Protected features can need assessment even when the statutory gain condition does not apply. |
Check the full-application checklist or outline and reserved-matters checklist. Their older self-build wording should not override current law for new applications. The formal post-permission Gain Plan is a separate approval, not simply the application-stage BNG report.
Woodland / Thames and docks / dense urban networks
Understand the ecological setting before choosing habitats
GiGL’s February 2026 factsheet records 93 SINCs covering 536.8 hectares, or 17.9% of Southwark. The council also identifies seven Local Nature Reserves. These figures describe a wider network; they do not establish a particular site’s baseline or protected-species presence.
Dulwich, Sydenham Hill and Nunhead
Woodland, mature trees and connected habitats make boundary and impact-pathway checks important. Sydenham Hill Wood, Dulwich Upper Wood and Nunhead Cemetery illustrate the southern borough’s varied ecological context.
However, not all woodland is ancient, and a nearby development does not automatically affect a protected feature. Use the actual designation, current records and suitable survey evidence to establish constraints and buffers.
Rotherhithe, Surrey Docks and Canada Water
Stave Hill Ecological Park, Lavender Pond and Russia Dock Woodland connect wetland and woodland interests within an urban setting. Therefore, consider habitat links, water conditions, lighting and recreation pressures where a proposal could affect them.
A public reserve is not automatically a registered habitat bank. Likewise, a new pond or planted roof needs credible design and management before it can support a projected metric outcome.
Bankside, Bermondsey and the Thames
Tidal habitats, river edges and drainage relationships can shape development beside the Thames. P58 and relevant London policies sit alongside the statutory metric and any separate environmental consent requirements.
First identify the habitat, boundary and actual effect. Proximity alone does not establish that a freshwater River Condition Assessment is the appropriate method, or that every site requires a watercourse calculation.
Peckham, Camberwell, Walworth and regeneration areas
Burgess Park, urban trees, gardens and smaller green spaces form part of the borough’s ecological network. Meanwhile, Old Kent Road, Elephant and Castle, Canada Water and Aylesbury redevelopment raise distinct design questions.
Previously developed land can contain valuable habitat, including features missed by a simple aerial review. Therefore, survey the actual site and coordinate roofs, trees, drainage and retained habitat through the design process.
Use the dated GiGL factsheet and council ecology information. GiGL also records 165.7 hectares deficient in access to nature. Access, open space and habitat classifications overlap; they are not available biodiversity units. Detailed records and field surveys remain necessary for a site assessment.
London Plan G1 / G5 / G6 / G7 / published LNRS
Connect urban greening with nature-recovery priorities
London’s strategic policies complement Southwark’s local requirements. Green infrastructure, biodiversity and tree policies guide design, while the statutory metric measures habitat outcomes. The published LNRS adds mapped recovery opportunities and priorities.
UGF is not a biodiversity percentage
London Plan G5 applies to relevant major development. Its interim targets are 0.4 for predominantly residential and 0.3 for predominantly commercial schemes, excluding B2 and B8. These are weighted green-surface scores.
Therefore, a UGF of 0.4 does not mean 40% biodiversity gain. Trees and roofs can contribute to both assessments differently. Coordinate their specifications, but calculate each applicable requirement separately.
Use current LNRS evidence, not an old draft reference
London published its LNRS on 9 March 2026, with public spatial data updated in September. Earlier Southwark reports describe it as forthcoming because they were prepared before publication.
Check the actual habitat proposal against mapped priorities and potential measures when considering strategic significance. However, an opportunity area does not create a new designation, available unit stock or permission to work on someone else’s land.
Read the London Plan, GLA urban greening guidance, published LNRS and spatial dataset. The historic Southwark Nature Action Plan remains useful context, but do not assume a replacement is adopted without checking. Some ecological data require licensed access.
Council Biodiversity Duty Report / 2024–2025 reporting period
What do Southwark’s approved Gain Plans show?
The council’s first duty report records 27 approved applications subject to statutory BNG: ten major and seventeen minor. It records four approved Biodiversity Gain Plans, all proposing on-site gains. These are historic reporting figures, not a live total of November 2026 decisions.
| Reported scheme or finding | Approved proposal and practical lesson |
|---|---|
| 24/AP/0918 — Office demolition and extension | The approved plan recorded an increase of 0.35 area-habitat units, equivalent to 20.11%. Proposed features included urban trees, ground-level planters, green walls and shrubs. These are approved projections, not evidence of mature habitat condition. |
| 25/AP/1335 — Block of flats | The reported increase was 0.06 area-habitat units, equivalent to 12.74%, using a green roof and vegetated garden. The example shows why a percentage should be read alongside the absolute unit change. |
| 25/AP/2778 — Phased mixed-use development | The overall Gain Plan reported an increase of 1.16 area-habitat units, equivalent to 55.73%. An overall plan does not remove the need for relevant phase approvals and coordinated management before each phase proceeds. |
| Three plans assessed as significant | The council reports 30-year legal agreements and £12,874 monitoring fees for three of the four approved plans. This illustrates how management and monitoring can follow the habitat strategy; it is not a fee trigger for every development. |
Read the Enhanced Biodiversity Duty Report, Chapter 5 and council reporting summary. Cabinet approved the report in February 2026. No ACP involvement is claimed. Also keep area, hedgerow and watercourse units separate rather than adding them as interchangeable outcomes.
Railway Rise / application 24/AP/2314 / April 2025
Why can a gain above 10% still need more work?
The committee report for redevelopment at the Hall and Co Jewson site, Railway Rise, described a revised proposed on-site gain of 13.23%. Nevertheless, officers identified a habitat trading-rule shortfall and discussed further off-site delivery. The percentage alone did not resolve the assessment.
Check the habitat accounts and document versions
The Railway Rise report demonstrates the difference between headline uplift and required habitat replacement. Also check which metric version and drawings support each calculation; figures from different revisions should not be combined.
This was planning-stage evidence, not proof that compensatory units were purchased or habitats established. Therefore, use the example as a technical lesson rather than a claim of final compliance or an ACP project outcome.
Connect approval with practical management
The formal Biodiversity Gain Plan normally follows permission and requires approval before development starts. Align it with the final metric, habitat plans and any registered off-site allocation.
Qualifying significant on-site and off-site gains require at least 30 years of secured management. Also identify monitoring, access and remedial responsibilities. Phased development needs the appropriate overall and phase-specific approvals.
See the 1 April 2025 committee report for 24/AP/2314. Our BNG process guide and habitat management and monitoring guidance explain the wider sequence. A credible strategy must address habitat type, condition and deliverability as well as the percentage.
Current register / habitat match / legal allocation
How should a Southwark project source off-site units?
Establish the actual habitat deficit and applicable gain hierarchy before comparing offers. National changes in August 2026 affect qualifying non-major schemes. Therefore, use current rules alongside P60 protections instead of assuming every project follows identical on-site and off-site priorities.
Treat the council’s market snapshot as dated evidence
The duty report said there were no registered inner-London habitat banks in August 2025. However, that is a historical observation, not a verified November 2026 inventory. The report also described investigation of future opportunities.
No buyer-ready Southwark stock or current seller price was independently confirmed for this guide. This does not establish that supply is unavailable. Parks, reserves and council-funded nature projects are not automatically gain sites.
Verify both registration and suitable remaining units
Use the official gain-sites register to check the site and allocation history. Then obtain dated seller confirmation of remaining units, habitat class, legal security, management and price inclusions.
Apply trading and spatial-risk rules to the actual shortfall. Also check strategic significance against the habitat and location. The nearest offer may be unsuitable, while a registered site may have no matching units left.
Complete the required allocation to the development and reflect it in the final Gain Plan. Government statutory credits are a separate last-resort route. A conservation donation or council monitoring payment does not itself purchase compliant off-site units.
Section 106 and CIL SPD / adopted 7 July 2025
What does Southwark charge for BNG monitoring?
The adopted planning-obligations guidance lists BNG monitoring charges from £12,874 where gain is assessed as significant. This is conditional monitoring, not a universal application charge or the price of a biodiversity report. Confirm the actual agreement, indexation and current charge for the scheme.
| Cost category | Scope and qualification |
|---|---|
| Council BNG monitoring — from £12,874 | The current linked SPD lists this starting charge where BNG is assessed as significant. The duty report records its use for three significant approved Gain Plans. However, it does not automatically apply to every minor or exempt proposal. |
| Arboricultural monitoring — £275 per relevant new tree | This separate SPD charge concerns trees requiring the specified protection, management or maintenance. It is not a biodiversity-unit price. Confirm the actual obligation before combining it with other monitoring costs. |
| National condition-approval administration | The April 2026 schedule lists £309 for the relevant non-householder route. Check the prescribed fee at submission. This does not pay for consultant preparation, legal work or long-term habitat monitoring. |
| Habitat surveys, metric and Gain Plan preparation | Professional scope depends on the site, habitat complexity, survey seasons and design information. Also allow for tree, species or water-related work where relevant; no fixed ACP project price is assumed. |
| Legal security and habitat management | Confirm the necessary agreement, responsible parties, HMMP and monitoring arrangements. Then budget for establishment, long-term care and remedial work rather than only the initial planting cost. |
| Off-site units or statutory credits | Obtain a current habitat-specific seller quotation and check allocation and management inclusions. Government credits follow a different tariff and legal route. Neither price is interchangeable with a council monitoring contribution. |
Use the planning-obligations guidance and current linked SPD, Table 3. The July 2025 adoption replaced the 2015 document; earlier draft fee figures should not be used. Confirm VAT treatment and actual invoicing rather than assuming it. Our BNG costs guide explains the wider budget.
Proportionate surveys / coordinated design / planning evidence
Discuss biodiversity net gain in Southwark with ACP
Share the site address, red-line plan, proposal and planning stage. Also send existing ecology, landscape or tree reports and relevant council comments where available. We can use that information to discuss a proportionate survey and assessment scope.
ACP’s BNG assessments establish habitat and metric evidence. Our Biodiversity Gain Plan support connects the approved design with delivery. Speak to our BNG consultants about the information and programme your project needs.
Use the London BNG guide for the strategic framework. Nearby authority guides include Lambeth and Lewisham. However, check the actual planning boundary, especially around connected regeneration areas and riverfront sites. Policies from a neighbouring borough do not automatically govern Southwark land.
Send your site details to ACP →Policy / trading rules / significant gain / delivery
Southwark BNG questions
These answers address local planning and habitat-delivery decisions. Use current source documents and site evidence when agreeing the project scope.
Which adopted policy covers biodiversity in Southwark?
P60 in the Southwark Plan, adopted on 23 February 2022, is the main biodiversity policy. Also consider green infrastructure, open space, water, trees and flood-risk policies where relevant. The October 2025 Climate and Environment SPD explains practical implementation.
Do all small Southwark developments need statutory BNG?
No. Check current exemptions, including the conditional rule for relevant sites of 0.2 hectares or less from 6 August 2026. Priority-habitat effects, application dates and permission routes matter. Older council self-build wording does not override national changes, while separate ecology requirements can remain.
Does a gain above 10% always satisfy the metric?
No. Habitat trading rules and the separate unit accounts still need to be met. The April 2025 Railway Rise committee report described a proposed 13.23% on-site uplift but identified a trading shortfall. Therefore, review the detailed metric and habitat delivery, not just its headline percentage.
Is the £12,874 monitoring charge payable on every application?
No. Southwark’s adopted guidance lists BNG monitoring from £12,874 where gain is assessed as significant and the relevant obligation arises. Confirm the scheme-specific agreement and current charge. It is separate from professional fees, planning-condition administration and habitat-unit purchases.
Can a green roof satisfy both UGF and BNG?
It may contribute to both, but the calculations are different. UGF assesses weighted green surfaces, while the statutory metric assesses habitat units and condition. Therefore, coordinate roof substrate, drainage and management while demonstrating each applicable requirement separately.
Do the council’s approved Gain Plans prove habitats have matured?
No. The duty report records four approved plans during its reporting period, all proposing on-site gains. Their figures describe accepted planned outcomes. Habitat establishment, target condition and long-term management need later evidence; no ACP involvement in those schemes is claimed.
Are there currently no off-site biodiversity units in Southwark?
The council’s no-inner-London-habitat-bank statement described August 2025. It is not a current inventory. No buyer-ready Southwark stock was independently verified for this guide. Check the official register, dated seller availability, suitable habitat units and legal allocation before relying on supply.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Evidence register
Sources and review dates
Primary research reviewed 6 November 2026. Local Plan adopted 2022; both cited SPDs adopted 2025. Council Gain Plan figures describe its historic reporting period and approved projections. GiGL figures use February 2026 data. Confirm current charges, legal scope and actual unit availability for each project.
Southwark policy, habitat and delivery evidence
Southwark Plan — adopted February 2022
Climate and Environment SPD — adoption October 2025
Final environmental SPD — Chapter 5
Section 106 and CIL SPD — adoption July 2025
Current linked obligations SPD — April 2026 file
Full planning application checklist
Outline and reserved-matters checklist
GiGL Southwark factsheet — February 2026
Council biodiversity-duty summary