City of London / Biodiversity & planning guide
Biodiversity Net Gain in the City of London
Biodiversity net gain in the City of London connects habitat evidence with the realities of the Square Mile: dense development, heritage and limited ground-level space.
From office redevelopment and refurbishment to roof landscapes and riverside projects, establish the right requirements early. ACP supports habitat surveys, statutory metric assessments, Biodiversity Gain Plans and long-term habitat management.
Reviewed 12 November 2026 · Local Plan 2015 adopted · Sustainability SPD February 2025 · City Plan 2040 emerging
National law / August and November 2026 changes
Does your City development need statutory BNG?
Qualifying planning permissions normally require at least 10% biodiversity net gain. However, exemptions and transitional rules matter, particularly for small City plots and existing permissions. Start with the application date, red-line boundary and actual habitat impacts.
| Development circumstance | Evidence and practical consequence |
|---|---|
| Site area of 0.2 hectares or less | For qualifying applications from 6 August 2026, the exemption uses the red-line site area. It does not apply where the development impacts on-site priority habitat. Therefore, measure the whole site and check the habitat evidence. |
| De minimis or temporary development | De minimis requires impacts below 25m² of on-site habitat and below 5m of linear habitat, with no priority-habitat impact. For the new temporary exemption, the whole development must be temporary, permitted for no more than five years, and avoid priority-habitat impact. |
| Householder, self-build or varied permission | Formal householder applications remain exempt. The self-build exemption ended for new applications from 6 August 2026. However, transitional provisions and section 73 variations require the original permission and dates to be checked. |
| Larger or otherwise qualifying scheme | Establish the baseline, applicable metric and delivery strategy. A largely sealed plot is not automatically exempt. Conversely, an exemption from statutory BNG does not remove protected-species or separate ecological policy requirements. |
Use the current government exemptions and ACP’s BNG exemptions guide. Also check the statutory metric guidance updated 10 November 2026: published statutory versions remain usable; the older non-statutory Metric 4.0 is different. Small Sites Metric eligibility needs its own check.
Decision aid / four measures / distinct evidence
Four biodiversity requirements to assess separately
City of London BNG assessments may sit alongside other planning tests. A green roof can contribute to several objectives, but one calculation does not prove compliance with all of them. Use this comparison to agree the evidence needed.
| Requirement | Status and scope | Measure | Project evidence |
|---|---|---|---|
| Statutory BNG | Status: National legal framework, where applicable. | Measure: Normally at least 10% habitat-value gain. | Evidence: Baseline, statutory metric, delivery strategy and formal Gain Plan. |
| City Plan OS4 | Status: Emerging policy for major developments; formal adoption still pending at 12 November 2026. | Measure: Proposed minimum three biodiversity units per hectare. | Evidence: Test the local target and final policy wording separately from statutory exemptions. |
| London Plan G5 | Status: Adopted urban-greening policy for major development. | Measure: Urban Greening Factor, using the applicable land-use target. | Evidence: Greening calculation and landscape design; this is not the biodiversity metric. |
| Ecological protection | Status: Relevant law and planning policies, including designated sites and species. | Measure: Avoidance, impact assessment and appropriate mitigation. | Evidence: Records, proportionate surveys and relevant consents or licences. |
For example, percentage gain on a low baseline may deliver few additional units. A units-per-hectare target addresses a different question. Similarly, attractive planting can improve UGF without generating an equivalent statutory biodiversity result. The emerging OS4 wording should therefore be read alongside the law.
City Corporation / Local Plan / London Plan
Which policies shape biodiversity net gain in the City of London?
The City of London Corporation is the local planning authority for the Square Mile. Check the actual boundary and any relevant referral or consent arrangements. The adopted Local Plan and London Plan apply alongside legislation and supporting guidance.
| Policy or document | What applicants should address |
|---|---|
| Local Plan 2015 — DM19.2 | Plan biodiversity and urban greening into the design. Consider roofs, walls, trees, resilient planting and suitable wildlife features. Also maintain relevant SINC habitats and explain lasting management. |
| Local Plan — CS19 and DM19.1 | Protect and improve open space and green infrastructure. Major schemes should consider new or enhanced open space and ecological connections. Public access and habitat-unit delivery are different outcomes. |
| Planning for Sustainability SPD — 19 February 2025 | Use its urban-greening and biodiversity guidance to coordinate design and submission evidence. Identify roof, landscape and maintenance constraints early. Its draft Gain Plan guidance is distinct from formal post-permission approval. |
| London Plan G5, G6 and G7 | G5 addresses urban greening; G6 biodiversity, SINCs and nature access; G7 trees and woodland. Test the relevant requirements together, with separate calculations and a coherent landscape response. |
| Lighting and heritage guidance | Check lighting effects on wildlife and suitable measures around buildings, gardens and the riverside. Heritage-sensitive work may need separate consent. A biodiversity proposal does not remove those constraints. |
Read Local Plan policies CS19, DM19.1 and DM19.2, the 2025 Sustainability SPD and London Plan green infrastructure policies. Use the City’s guidance directory for the adopted Lighting SPD and relevant heritage documents.
Status checked / 12 November 2026
What changes when City Plan 2040 is adopted?
The inspectors’ report was published on 14 October 2026 and found the plan sound subject to modifications. However, that report is not an adoption decision. The City Plan remains emerging at this review date.
OS4: a proposed local habitat target
Emerging Policy OS4 proposes three biodiversity units per hectare for major developments. It prioritises on-site delivery, with a route for a shortfall where the target is not feasible on site.
Keep the proposed local target separate from the national 10% condition. Also check statutory exemptions and final wording before treating it as a binding project requirement. A small red-line area does not necessarily make an office proposal non-major.
Watch the adoption and guidance dates
The 10 November committee report sets out the remaining adoption stages: Policy and Resources on 19 November, then Common Council on 3 December. It proposes formal adoption and implementation on 4 December 2026. Check the final decision and adoption statement before treating OS4 as adopted policy.
The City adopted four new SPDs in June 2026, including Planning Obligations. The November report proposes full implementation alongside the new plan on 4 December. Therefore, confirm the operative date before budgeting for new obligations.
Follow the examination update, 10 November committee report and supporting documents and SPD implementation statement. Read the adoption report for the planned sequence. Recheck the final adoption statement before relying on the new policy.
Square Mile / ten SINCs / gardens and roofs
Understand the local nature-conservation network
The Corporation identifies ten Sites of Importance for Nature Conservation in the Square Mile. These are non-statutory designations with planning significance. They form part of a network of gardens, churchyards, terraces, roofs and riverside habitats.
| Site and reference | Designation |
|---|---|
| River Thames and its Tidal Tributaries — MO31 | Metropolitan importance |
| Temple Gardens — CiBII01 | Borough importance, Grade II |
| Barbican and St Alphage’s Garden — CiBII02 | Borough importance, Grade II |
| Pepys Garden and St Olave’s Churchyard, Seething Lane — CiL01 | Local importance |
| St Paul’s Cathedral Garden — CiL02 | Local importance |
| Cleary Gardens — CiL03 | Local importance |
| St Botolph without Bishopsgate Churchyard — CiL04 | Local importance |
| Aldermanbury Gardens — CiL05 | Local importance |
| Roman Wall, Noble Street — CiL06 | Local importance |
| Finsbury Circus — CiL07 | Local importance |
The Corporation’s biodiversity page also records approximately 376 open spaces totalling 32 hectares. These dated contextual figures do not establish a development’s baseline or available off-site units. Use current boundaries, records and site surveys before drawing conclusions.
City Cluster / Barbican / western City / Thames
Match the ecological response to the development setting
The Square Mile’s development areas have different constraints. However, a place name alone cannot establish habitat condition, a species record or the survey scope. Review the actual building, landscape and routes through which the proposal could affect wildlife.
City Cluster and eastern Square Mile
Office redevelopment can provide roof, terrace and public-realm opportunities. However, wind, shade, structural capacity and access can limit the habitat that will establish successfully.
Test habitat condition assumptions against the roof design and maintenance plan. Also coordinate planting with plant equipment, fire safety and public access before entering promised gains into the metric.
Barbican, Smithfield and nearby estates
Podiums, gardens and established trees can connect spaces within a dense urban landscape. The Barbican and St Alphage’s Garden also have SINC context, while heritage controls can affect proposed works.
Survey the affected landscape and identify the relevant consents. Then coordinate ecological improvements with structural needs, listed-building requirements and the retention of existing green infrastructure.
St Paul’s, Fleet Street and the western City
Churchyards, courtyards and small gardens may support habitat connections. Improvements can include varied planting, better ground conditions and suitable long-term care.
First identify retained trees, roots, sunlight and access. A planting schedule should explain realistic establishment and management, rather than assume every ornamental feature earns biodiversity units.
Thames frontage and Blackfriars
The River Thames SINC brings a different ecological context. Riverside works may affect the foreshore, river habitat, flood defences and routes used by wildlife.
Check the actual impact pathway and relevant consents. Also coordinate lighting, water quality, access and flood constraints. A nearby roof project does not automatically require every watercourse assessment.
Published London LNRS / local Biodiversity Action Plan
Use nature-recovery priorities without assuming site records
London’s Local Nature Recovery Strategy was published on 9 March 2026. Its priorities and Local Habitat Map provide strategic context. The City’s Biodiversity Action Plan adds local habitat, recording and conservation priorities.
Connect the habitat with the mapped measure
Review the relevant LNRS map and proposed nature-recovery measure. Then assess strategic significance under the statutory metric rules. A London address alone does not justify a higher score.
Also check current records and any data-licensing limits. An opportunity area is not a planning permission, a new statutory designation or a registered stock of units available to buy.
Keep species evidence separate from units
The City’s target species include black redstart, swift, house sparrow, peregrine falcon, bats, wild bees and stag beetle. These priorities do not confirm presence on every site.
Where buildings or trees offer suitable features, plan proportionate surveys and protection. Nesting features and other species measures can be valuable, but are not automatically convertible into habitat units.
Use the published London LNRS, public spatial evidence and City Biodiversity Action Plan 2021–2026. The local BAP’s dated action period should not be presented as a new 2026–2031 strategy.
Design asset / constraints / realistic habitat outcomes
Which habitat improvements are feasible on your site?
Test the proposed habitat against its setting before relying on the metric result. This matrix helps the design team identify practical constraints. It does not prescribe a habitat or survey without site evidence.
| Project setting | Potential response | Checks before committing |
|---|---|---|
| Office redevelopment | Biodiverse roof, suitable terraces and landscape planting. | Loading, substrate, exposure, drainage, access and maintenance. |
| Existing building refurbishment | Retain and enhance viable planted areas; assess new space. | Planning scope, exemptions, baseline habitats and extent of works. |
| Courtyard or podium | Trees, shrubs and varied planting where conditions allow. | Root volume, shade, irrigation, structure and target habitat condition. |
| Public realm | Tree planting, rain gardens and ecological connections. | Utilities, movement, drainage, ownership and future care. |
| Heritage-sensitive site | Planting and wildlife features compatible with the setting. | Listed-building controls, visual effects, fabric and access. |
| Riverside site | Retain habitat and assess appropriate enhancement. | SINC impacts, tidal context, flood assets and other consents. |
| Highly constrained site | Feasible on-site works and, where appropriate, off-site gains. | Habitat trading, spatial risk, registration and actual unit availability. |
Green walls, planters and wildlife features may provide benefits without delivering the same metric outcome as qualifying habitat creation. Therefore, keep the landscape schedule, UGF calculation, habitat plan and metric consistent. Also budget for establishment and corrective work.
Application / design / post-permission approval
Prepare the right evidence at each planning stage
Use the City’s current validation gateway for the application type. Its full checklist is dated before mandatory BNG, so read it with current national information requirements and the Sustainability SPD. Older lists do not displace later legislation.
| Stage | Information and practical action |
|---|---|
| Scope and baseline | Record the red line, application route and any exemption evidence. Where BNG applies, prepare appropriate habitat plans, baseline date, condition evidence and statutory metric information. Also identify relevant ecological constraints. |
| Design and submission | Align the landscape, drainage, roof and habitat plans. Supply proportionate ecological assessments and the required national BNG information. Separately show how the proposal addresses UGF and local planning policy. |
| Draft strategy versus formal Gain Plan | Early gain proposals can show feasibility at application stage. However, a draft strategy is not formal approval of the statutory Biodiversity Gain Plan. The gain condition normally requires approval before commencement. |
| Management and monitoring | Secure qualifying significant on-site enhancements and off-site gains for at least 30 years. An HMMP should identify target conditions, responsibilities, monitoring, reporting and corrective action. Check the actual legal mechanism and start point. |
Read the City validation checklists alongside national application-stage guidance. Our Biodiversity Gain Plan service and HMMP guidance explain the later deliverables.
Discuss your planning evidence →Published City evidence / design lessons
What can local projects teach the design team?
The Sustainability SPD contains useful local examples. They illustrate design choices, rather than proving statutory BNG compliance, approved Gain Plans or unit availability. No ACP involvement in these examples is claimed.
New Change Garden
The SPD describes a relandscaped public garden with 25% more planting. It retained two established trees and tailored drainage to protect their roots.
The practical lesson is to coordinate habitat, trees and water early. A successful greening project is not automatically a registered gain site or a supply of purchasable units.
65 Gresham Street
The SPD describes refurbishment and extension proposals with enhanced canopy and ground-level planting near Aldermanbury. Deeper soil is part of the proposed landscape response.
This offers a useful design example. However, the SPD’s description does not establish the current construction stage or a formally approved statutory Gain Plan. Check the live application record for those conclusions.
See Planning for Sustainability SPD, page 58. Keep proposed measures, completed works and legally secured biodiversity outcomes distinct when comparing projects.
Verified supply / statutory hierarchy / separate budgets
Off-site units and City of London BNG costs
A constrained site may need off-site delivery where the applicable rules allow it. Meanwhile, consultancy, biodiversity units, council monitoring and legal agreements are different budget items. A single headline “BNG price” can hide those differences.
Check the actual habitat supply
Start with the biodiversity gain-sites register. Confirm the parcel, habitat type, legal security and recorded allocations. Then obtain current written availability and price from the operator.
No buyer-ready City of London unit package or price was verified for this guide. That does not establish that none exists. Similarly, City-managed land outside the Square Mile is not automatically available for a development’s BNG.
Apply hierarchy and spatial-risk rules
The statutory hierarchy changed for non-major development in August 2026. Retention remains prioritised; on-site creation or enhancement and off-site delivery can sit at the same level. Statutory credits remain the last resort.
Check the actual development category, habitat trading and spatial risk. A cheap or nearby unit may not match the deficit. Record the allocation to the development before relying on it in the Gain Plan.
Scope professional and habitat costs
Survey access, rooftop areas, habitat complexity, design options and protected-species work affect the assessment scope. Also identify Gain Plan, HMMP, monitoring and physical habitat-care requirements.
Request a project-specific quotation. Separately confirm any unit reservation, purchase and legal costs. The BNG costs guide helps distinguish these categories; statutory credit prices are not private unit prices.
Confirm the operative council charges
A City-specific BNG monitoring tariff was not verified as currently operative for this guide. Obtain the relevant schedule and draft obligations from the Corporation before budgeting.
The 2026 Planning Obligations SPD is adopted but its implementation is linked to City Plan adoption. Confirm that trigger, the fee basis and project scope. Do not substitute another borough’s monitoring charge.
Use our off-site biodiversity units guidance and BNG hierarchy guide. Also review the City’s current SPD implementation statement when agreeing obligations.
Useful briefing asset / seven decisions
Prepare your City of London BNG brief
These checks help turn an early site enquiry into a useful assessment scope. Send the information already available, then identify the evidence still needed. The order may vary with the planning stage and project complexity.
| Check | Evidence to establish |
|---|---|
| Confirm the application and boundary | Identify the actual planning authority, red line, application date and consent route. Also examine the original permission where a variation is proposed. |
| Resolve statutory scope | Check the relevant exemption conditions, habitat impacts and development category. Retain the evidence rather than relying on plot size alone. |
| Separate the policy tests | Review adopted DM19.2 and London Plan requirements. Then check City Plan OS4’s current status and any new adoption or implementation decision. |
| Establish local ecological evidence | Check SINC boundaries, trees, buildings, species records and relevant surveys. Also consider the London LNRS and local habitat connections. |
| Test the design realistically | Coordinate roofs, courtyards, water, structure and heritage. Keep UGF and the statutory metric separate, with consistent landscape assumptions. |
| Confirm the delivery route | Check gains, trading rules and any off-site supply. Establish legal security, registration and allocation where needed; donations alone do not provide compliant units. |
| Plan approval and long-term care | Prepare the required application evidence and later Gain Plan. Identify management, monitoring, reporting and corrective responsibilities for qualifying habitat gains. |
Surveys / statutory metric / planning and delivery
Discuss your City of London project with ACP
Share the site address, red-line plan, proposed works, approximate area and planning stage. Existing surveys, drawings, landscape proposals and council correspondence help identify the right scope. Also flag roof access, heritage, structural or programme constraints.
Our BNG assessments and UKHab baseline surveys connect habitat evidence with design options. We can also support statutory metric calculations, Biodiversity Gain Plans and long-term management proposals. Send your site details for a proportionate project scope.
Use the London BNG guide for the strategic context. Nearby guides cover Westminster, Tower Hamlets, Southwark and Islington. Their policies and charges are not interchangeable with the City Corporation’s requirements.
Exemptions / policy status / roofs / delivery
City of London BNG questions
These answers address common Square Mile planning decisions. Use current official documents and site evidence when agreeing the requirements for a particular project.
Is BNG mandatory for every City of London application?
No. Exemptions and transitional provisions apply. The 0.2-hectare exemption introduced in August 2026 is relevant to smaller plots, but its date, boundary and priority-habitat conditions need checking. Separate ecological planning requirements may still apply.
Is the three biodiversity units per hectare target already adopted?
City Plan 2040 remains emerging at this review on 12 November 2026. Policy OS4 proposes the local target for major developments. The November report proposes 4 December implementation, subject to the remaining adoption process. Confirm the formal adoption statement.
Can a largely sealed site still need ecology evidence?
Yes. Habitat value, statutory BNG scope and potential protected-species or designated-site effects are separate questions. A low habitat baseline does not establish that all ecological information is unnecessary.
Does a green roof automatically achieve the BNG target?
No. Its contribution depends on the habitat classification, area, condition, delivery assumptions and management. Check structural loading, substrate, exposure and access before relying on the metric result.
Does a good Urban Greening Factor score prove 10% BNG?
No. UGF measures urban greening while statutory BNG measures habitat biodiversity value. Prepare separate calculations where both apply, supported by a coordinated landscape design.
Can a City project use off-site units outside London?
Potentially, if the units meet the relevant habitat trading, spatial-risk and legal requirements. Confirm registration, current availability and allocation to the development. Distance can affect the quantity needed.
When is the Biodiversity Gain Plan approved?
For development subject to the statutory biodiversity gain condition, approval normally comes after planning permission and before commencement. An application-stage draft strategy does not replace this formal approval.
How long must qualifying gains be maintained?
Significant on-site habitat enhancements and registered off-site gains generally need legally secured management for at least 30 years. Confirm the actual agreement, start point, monitoring duties and corrective measures.
Are the City’s SINCs statutory nature reserves?
No. SINCs are non-statutory nature-conservation designations with planning significance. Check the relevant boundary, ecological interest and effects of the proposal. Other statutory designations or protected-species duties may also apply.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Evidence register
Sources and review dates
Reviewed 12 November 2026. Local Plan 2015 and Sustainability SPD February 2025 are adopted. City Plan 2040 remains emerging. The November report sets out the remaining adoption process; check its final outcome. New 2026 SPDs have a separate implementation trigger. Check subsequent decisions, legal changes, site evidence and current supply before relying on a project outcome.
City policy, habitats and planning evidence
Adopted Local Plan 2015 gateway
Local Plan policies — including DM19.2
Inspectors’ report and examination updates
10 November 2026 adoption report and timetable
Planning for Sustainability SPD — February 2025
SPD adoption and implementation dates
Current validation gateway and dated checklists