Tower Hamlets / Local planning guide

Biodiversity Net Gain in Tower Hamlets

Biodiversity net gain in Tower Hamlets needs a clear policy route, consistent habitat evidence and a workable urban landscape strategy.

From Whitechapel and Bethnal Green to Bow, Poplar and the Isle of Dogs, sites have different ecological constraints. ACP coordinates habitat surveys, metric assessments and Gain Plans with your planning and design team.

Reviewed 6 November 2026 · Borough Local Plan adopted 2020 · Former LLDC policy area checked separately · Published London LNRS

Current law / adopted policy / site evidence

Does your Tower Hamlets proposal need statutory BNG?

Qualifying planning permissions normally require at least 10% biodiversity gain. However, determine the legal scope before choosing a metric route or assuming the project needs off-site units.

Check the current exemption tests

For relevant applications from 6 August 2026, sites of 0.2 hectares or less can qualify for exemption. However, this does not cover development affecting on-site priority habitat. Assess the whole red-line site and the actual habitat effects.

Householder, de minimis and temporary-development exemptions have separate tests. Meanwhile, the general self-build exemption ended for relevant new applications. Earlier permissions and section 73 cases need transitional checks.

Keep ecology and statutory gain distinct

An exemption from the statutory gain condition does not remove every ecological planning requirement. For example, the applicable local biodiversity policy, protected-species law, trees and river-corridor policies may still affect an exempt scheme.

Conversely, an in-scope proposal needs suitable habitat calculations even without an identified protected-species issue. Therefore, explain the legal route and the ecological assessment separately in the site brief.

Check the current government exemptions and our BNG exemptions guide. The statutory biodiversity metric tools were updated on 3 November 2026. Also check Small Sites Metric eligibility separately; site size alone does not establish it.

Local Plan 2031 / adopted 15 January 2020

Which policies apply to a Tower Hamlets site?

Start with the red-line boundary and adopted policies map. For most borough sites, the 2020 Local Plan provides the local framework. However, former LLDC parcels follow a different adopted plan. Both sit alongside relevant London Plan policies and national law.

Read the adopted policy alongside the site’s actual designation
Policy or evidencePractical meaning
D.ES3 — Urban greening and biodiversity

Retain valuable habitats and trees, integrate suitable living roofs and walls, and provide ecological enhancements. Major development needs an ecology assessment. Also address SINCs and protected or priority species through avoidance, mitigation and appropriate compensation.

S.ES1 — Environmental protection

The strategic environmental policy supports the detailed ecological assessment. Therefore, consider natural resources, habitat quality and environmental effects together rather than treating the metric as the entire planning case.

S.OWS1 and D.OWS3 — Open spaces and green grid

Protect and strengthen open-space connections. For example, a landscaped boundary can connect nearby habitats. However, public open-space provision and statutory biodiversity units remain separate requirements.

S.OWS2 and D.OWS4 — Water spaces

Check effects on canals, docks and river corridors where relevant. Consider banks, ecological connections and the actual impact pathway. A waterside address alone does not establish a watercourse-unit deficit.

D.ES4 and D.ES5 — Flood risk and drainage

Coordinate flood-risk and sustainable-drainage evidence with habitat design. Rain gardens and planted drainage can support several objectives, but each calculation and consent needs its own evidence.

London Plan G1, G5, G6 and G7

Address green infrastructure, urban greening, biodiversity and trees as applicable. The Urban Greening Factor measures weighted surfaces; it is not the statutory biodiversity percentage.

Read the adopted Local Plan and Policies Part 2, including D.ES3. The plan predates mandatory statutory BNG. It should not be presented as imposing a universal 20% requirement or overriding national exemptions.

Fish Island / Hackney Wick / Bromley-by-Bow

Check the former LLDC area before selecting policy references

Planning powers returned to Tower Hamlets on 1 December 2024. Nevertheless, the LLDC Local Plan 2020–2036 and relevant supplementary policies remain applicable within the former area. The deciding council and the applicable adopted plan are different questions.

Use the adopted map and legacy guidance

For relevant Fish Island, Hackney Wick and Bromley-by-Bow parcels, confirm the mapped plan boundary and allocation. Then read the applicable LLDC policies and permission history before quoting borough D.ES3 as the operative local policy.

The council lists the Bromley-by-Bow SPD, adopted April 2017, and Hackney Wick and Fish Island SPD, adopted March 2018. Its LLDC Planning Obligations SPD dates from October 2022. Apply guidance to the relevant land and proposal.

Keep the replacement plan clearly emerging

The new Tower Hamlets Local Plan 2023–2038 was submitted for examination on 16 February 2026. Hearings were subsequently postponed. The council’s September update gave no restart date while the Minister’s Directive remained in place.

As at 6 November 2026, adoption has not been verified. Therefore, an anticipated timetable is not an adopted policy. Check current examination updates when preparing an application or responding to council comments.

Use the council’s LLDC policy and mapping gateway and current examination updates. Nearby Hackney and Newham guides help with adjacent sites, but do not transfer their requirements across the borough boundary.

A practical briefing asset

Seven checks before finalising the site strategy

Use these checks to coordinate ecology, planning and landscape work. They focus the brief on Tower Hamlets’ actual submission requirements and the decisions that need site-specific evidence.

  • Locate the red line on current policy mapping. In particular, identify former LLDC land and the operative plan before selecting local policy clauses.

  • Record site area, priority-habitat effects, permission route and submission date. Then check current exemptions and transitional rules; Small Sites Metric eligibility is a separate test.

  • Use proportionate desk records, UKHab and condition surveys. Also scope trees, buildings, lighting and water-related effects according to actual site conditions.

  • Match habitat parcel IDs, areas, baseline dates and proposed condition across the report, workbook and drawings. Keep area, hedgerow and watercourse accounts distinct.

  • For an in-scope application, assemble the assessment, Excel metric, PDF and GIS Shapefile habitat plans, and completed LBTH checklist. Explain any justified inapplicable checklist items.

  • Assess relevant UGF and local ecology requirements separately. Then test roof build-up, drainage, planting space, management access and any off-site habitat shortfall.

  • Allow for Gain Plan approval after permission and before commencement. Also identify qualifying long-term management duties, case-specific monitoring costs and responsible parties.

Begin with the site boundary and proposal, even if other reports are incomplete. This checklist supports scoping; it does not establish an exemption or replace field evidence.

LBTH local validation / current council checklist

What must an in-scope planning application include?

Tower Hamlets identifies four parts to its local BNG submission package. Check them together before submission, because a complete report with missing GIS files can still leave the application evidence incomplete.

The council’s four-part BNG package
Submission itemWhat the project team should check
1. Biodiversity Net Gain Assessment

Explain the baseline, proposed habitat changes, biodiversity value and delivery strategy. Also state relevant assumptions, survey limitations and the chosen baseline date.

2. Completed metric in Excel

Provide the appropriate current statutory workbook. Check habitat classifications, condition, trading rules and separate unit accounts. Use the Small Sites Metric only where its eligibility rules allow.

3. Habitat plans in PDF and GIS Shapefile formats

Supply the relevant pre- and post-development habitat plans using appropriate UKHab methodology. Match geometry, habitat IDs and areas to the metric. In addition, check that the GIS files open correctly and use a consistent coordinate system.

4. Completed LBTH BNG checklist

Use the council’s original checklist and address each applicable item. It covers scope, baseline dates, historic degradation, irreplaceable habitat, plans and calculations. Explain justified “not applicable” answers rather than leaving unexplained gaps.

See the current council BNG validation guidance and original LBTH checklist. A proposal claiming exemption needs a supported Statement of Exemption. The formal post-permission Biodiversity Gain Plan is a separate approval; it should not be confused with the initial assessment.

Canals / tidal corridors / urban woodland / roofs

Read the local habitat network without assuming the site baseline

GiGL’s verified April 2025 factsheet records 35 SINCs covering 428.2 hectares, or 19.8% of the borough. It also records 43.9 hectares of priority habitat. These dated, overlapping datasets describe context; they do not establish habitats on an individual development site.

Cemetery Park, Mile End and Bethnal Green

Tower Hamlets Cemetery Park and Ackroyd Drive Green Link, Mile End Park and Victoria Park form important parts of the urban nature network. Woodland, grassland, water and surrounding gardens can create different ecological connections.

For nearby proposals, check the actual designation, boundary and impact pathway. Also assess lighting, access pressure, trees and protected species where relevant. A park’s presence does not make every neighbouring plot designated.

Canary Wharf, Poplar and the Isle of Dogs

Mudchute Park and Farm, docks and Thames-side habitats sit within a dense development setting. Roofs, podiums and waterfront planting can offer opportunities when their design and future management are credible.

However, landscaped surfaces are not interchangeable. Assess substrate, drainage, shade and maintenance access before assigning habitat condition. A decorative planting schedule alone does not demonstrate the future unit value.

Bow, Limehouse and connected waterways

The Regent’s Canal, Limehouse Cut, Hertford Union Canal, Lea Valley and Bow Creek link habitats across administrative boundaries. Therefore, consider banks, water quality, disturbance and riparian continuity where the proposal affects them.

A canal-side site does not automatically require every watercourse survey or consent. Establish the qualifying habitat, metric module and actual effects. Then coordinate ecology with drainage, flood and relevant authority requirements.

Whitechapel, Aldgate and former industrial land

Buildings, rail corridors and brownfield habitats can support species or habitat interest that a simple land-use label misses. Black redstart and bat considerations depend on current records and competent assessment.

Do not assume all hardstanding is ecologically empty, or that every roof supports the same species. Also keep species enhancements distinct from habitat units: a bird box does not automatically generate an area-habitat unit.

Use the GiGL April 2025 factsheet and council SINC inventory. The 2023 SINC review includes proposed changes; confirm adopted mapping before treating a recommendation as a designation.

D.ES3 / species screening / London Plan G5

Keep ecology surveys, UGF and statutory units distinct

A statutory BNG exemption does not remove every ecological planning duty. Conversely, a protected-species survey is not a substitute for the habitat metric. The council’s local evidence requirements need a proportionate response to the actual proposal.

Use proximity as a survey prompt

The council’s ecology validation guidance identifies development and habitat or species effects that can require assessment. It includes proximity within 50 metres of woodland, water, tree-lines or a SINC as a screening consideration.

This is not a rule that all sites within 50 metres automatically need 10% statutory BNG. Instead, investigate the likely effects and select proportionate surveys. Major schemes also need the relevant ecology assessment under the applicable adopted policy.

Design roofs and greening for both calculations

London Plan G5 normally uses UGF targets of 0.4 for predominantly residential and 0.3 for predominantly commercial development, with relevant exclusions. The applicable local policy and project category still need checking.

UGF measures weighted green surfaces, while the statutory metric measures habitat value. Therefore, coordinate roof substrate, water supply, planting and access, then demonstrate each applicable requirement separately. UGF 0.4 does not mean 40% biodiversity gain.

Read the local ecology validation page and GLA Urban Greening Factor guidance. Some council ecology references are historic. Use the adopted London Plan and current legal rules rather than treating an old draft reference as current policy.

London Dock / PA/23/02079 / 3 April 2024

What can a large proposed gain percentage actually tell you?

The council’s committee report for Buildings H and J at London Dock described proposed biodiversity gain of 3,340%. It separately reported an Urban Greening Factor of 0.4. Proposed biodiverse roofs and landscaping supported the assessment.

Read the baseline and absolute units

A small baseline can produce a very large percentage uplift. Therefore, examine the underlying habitat areas, actual units and condition assumptions before comparing schemes. The percentage is not the number of biodiversity units created.

Absolute unit balances were not independently verified for this guide. Nor does the committee report establish that all proposed habitats have reached target condition. Use the example to understand the calculations, not as a promise of a similar result.

Keep the consent date and delivery stage clear

Application PA/23/02079 concerned the former News International site at 1 Virginia Street and dates from November 2023. The April 2024 report recommended permission subject to conditions and legal arrangements.

This historic planning assessment does not demonstrate a current statutory Gain Plan discharge or completed habitat delivery. Later legal changes should not be applied retrospectively without checking the consent route. No ACP involvement is claimed.

See the 3 April 2024 Strategic Development Committee report. The useful lesson is to consider baseline units, urban greening and long-term habitat delivery separately, even when the headline percentage is striking.

Published London LNRS / local programme status

Use current nature-recovery maps and dated local evidence

London’s Local Nature Recovery Strategy was published in March 2026. Its spatial evidence helps identify habitat connections and potential recovery measures. However, a mapped opportunity is not a registered gain site or a grant of planning permission.

Apply the LNRS to the actual habitat proposal

Overlay the site boundary with current policy designations, survey data and LNRS layers. Then apply the statutory metric’s strategic-significance rules to the relevant habitat and location. Avoid awarding a higher score simply because the site lies in London.

The public spatial release was updated in September 2026 and omits some licensed information. Therefore, check the dataset limitations and obtain appropriate GiGL records where needed. Keep source dates with the project evidence.

Distinguish the future local programme from approval

As at 6 November 2026, the council described its Biodiversity Duty Report 2023–2025 as draft awaiting approval. Its new Local Biodiversity Action Plan 2026–2030 and duty report were scheduled for Cabinet consideration on 12 November.

That meeting was still in the future at review. Consequently, no approval or delivered habitat outcome is assumed here. Check the final decision and documents before using later programme targets or council BNG statistics.

Use the published London LNRS, public spatial data and borough biodiversity gateway. The Cabinet programme entry records the local proposal’s status; it does not itself establish adoption.

Habitat match / registered site / recorded allocation

How should a Tower Hamlets project source off-site units?

First establish the actual habitat shortfall and applicable gain hierarchy. National amendments affect qualifying non-major schemes from August 2026. Therefore, use the current rules rather than relying only on an older generic on-site-first explanation.

Verify suitable supply without assuming a local market

No named Tower Hamlets gain site with verified buyer-ready stock and current pricing was independently established for this guide. This is an evidence limit, not a claim that no units exist.

A SINC, park, LNRS opportunity or restoration project is not automatically a habitat bank. Check the official gain-sites register, then obtain dated seller confirmation of remaining units, habitat types, legal security and price inclusions.

Match the units and secure the delivery

Apply habitat trading and spatial-risk rules to the specific shortfall. Also examine land boundaries, management responsibilities, allocation history and the relevant long-term agreement. A nearby offer may still be unsuitable.

Complete the required allocation to the development and reflect it in the Gain Plan. Government statutory credits are a distinct last-resort route. A conservation donation or council monitoring contribution does not itself buy compliant units.

Where applicable, the formal Gain Plan needs approval after permission and before commencement. Qualifying significant on-site and off-site gains need at least 30 years of secured management. Our habitat management guidance explains the evidence and responsibilities.

Council monitoring is agreed case by case

What does biodiversity net gain in Tower Hamlets cost?

The council does not publish one universal BNG monitoring tariff on its current validation page. It agrees monitoring fees case by case for significant on-site enhancements, considering site size, habitat-creation difficulty and assessment access.

Separate council administration, technical work and habitat delivery
Cost categoryWhat to confirm
Council monitoring and section 106

The council secures relevant monitoring costs through section 106 agreements. Confirm the project-specific scope and charge. A neighbouring borough’s published tariff is not a Tower Hamlets price.

Planning-condition administration

The April 2026 national schedule lists £309 for the relevant non-householder condition-approval route. Check the prescribed fee when applying. This is separate from professional Gain Plan preparation and council habitat monitoring.

Surveys, assessment and GIS evidence

Budget for proportionate fieldwork, metric calculations and the local PDF/GIS plan package. Also allow for relevant seasonal species work or tree evidence. The scope depends on the site and design information.

Legal securing and long-term habitat care

Identify the appropriate agreement, responsible land manager, monitoring schedule and remedial duties. Qualifying gains need long-term security; initial planting is only part of the delivery cost.

Off-site units and statutory credits

Obtain a current habitat-specific seller quotation and check allocation and management inclusions. Statutory credits follow a different national tariff. Neither price is interchangeable with council monitoring fees.

See the council monitoring-fee explanation and national planning-fee schedule. Our BNG costs guide helps structure the budget. Proposed future fee increases are not current charges until the relevant rules take effect.

Local evidence / coordinated design / practical delivery

Discuss biodiversity net gain in Tower Hamlets with ACP

Send the site address, red-line plan, proposal and planning stage. Also include any existing ecology, tree, landscape or metric information and council comments. Flag former LLDC land, nearby nature sites or water-related works so the scope can address them early.

Our BNG assessments establish habitat and metric evidence. Biodiversity Gain Plan support connects the final design with delivery, while our BNG consultants can discuss the appropriate scope and programme.

Use the London BNG guide for the wider policy framework and the BNG process guide for submission stages. Across the Thames, Greenwich has its own authority requirements. Always confirm the actual planning boundary rather than selecting policy by the nearest place name.

Send your site details to ACP →

Policy boundary / submission files / monitoring / delivery

Tower Hamlets BNG questions

These answers address local planning and habitat-delivery decisions. Use current source documents and site evidence when agreeing the project scope.

Which biodiversity policy applies in Tower Hamlets?

D.ES3 is the main biodiversity and urban-greening policy in the borough Local Plan adopted in January 2020. However, former LLDC land retains the appropriate LLDC Local Plan until replaced. Start with the adopted policies map, then apply relevant London Plan policies and national law.

Does Tower Hamlets require GIS habitat plans?

For applications subject to the statutory gain condition, the council requests BNG plans in both PDF and GIS Shapefile formats. It also asks for an assessment, the completed metric in Excel and the LBTH BNG checklist. Check that habitat IDs, geometry and areas agree across the package.

Is the new Local Plan 2038 already adopted?

No adoption was verified at the 6 November 2026 review. The plan was submitted for examination in February 2026, but hearings were postponed. The existing adopted borough and former LLDC plans remain the starting point. Check the council’s latest examination updates before submission.

Does a site within 50 metres of a SINC automatically need BNG?

No. The council’s proximity guidance helps screen ecological survey and impact requirements. Statutory BNG scope depends on national rules, exemptions and the application history. A survey may still be needed on an exempt site where actual species or habitat effects warrant it.

Is there a fixed Tower Hamlets monitoring fee?

The current council guidance agrees monitoring fees case by case for significant on-site enhancements and secures them through section 106. Site size, habitat-creation difficulty and access affect the charge. Confirm the actual agreement; it is separate from consultancy, planning administration and unit purchases.

Does London Dock’s 3,340% figure prove delivered gain?

No. The April 2024 committee report describes a proposed planning-stage gain and a separate UGF score of 0.4. It does not prove mature habitat condition or final statutory Gain Plan discharge. Read the baseline, actual units and delivery evidence before comparing schemes.

Can a local park supply off-site units for my scheme?

A park or SINC designation does not establish registered unit supply. Check the gain-sites register, legal agreement, suitable remaining units and dated seller terms. No buyer-ready Tower Hamlets stock was independently confirmed for this guide, but that does not establish that supply is unavailable.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.