Environmental consultancy for planning & development0330 236 7329hello@acp-consultants.com

Hackney BNG / Local planning guide

Biodiversity Net Gain in Hackney

Biodiversity net gain in Hackney brings together habitat surveys, local planning policy and practical design choices on tightly constrained urban sites.

From Shoreditch rooftops to Woodberry Down’s wetlands and Hackney Wick’s waterways, establish the right policy and ecological baseline before fixing your strategy.

Evidence reviewed 5 November 2026 · Adopted policy and emerging plans distinguished

Application date / site evidence

Does your Hackney development require BNG?

First, confirm the permission route, red-line area and application date. However, the development label alone cannot establish an exemption or the required survey scope.

The statutory gain requirement

Non-exempt development normally needs at least 10% biodiversity net gain, measured using the statutory biodiversity metric. At application stage, evidence explains the baseline and approach. The Biodiversity Gain Plan normally requires approval after permission and before development begins.

In addition, secure significant on-site enhancements and registered off-site gains for at least 30 years. Then identify who will manage, monitor and fund the habitats.

Check the August 2026 changes

For relevant applications from 6 August 2026, sites of 0.2 hectares or less can qualify for exemption. In particular, this route does not apply where development decreases the biodiversity value of on-site priority habitat.

However, the separate self-build exemption ended for new applications from that date. Meanwhile, earlier permissions and variations need transitional checks. Read the current government exemptions and our BNG exemptions guide.

Separate ecology duties remain

Nevertheless, exemption from statutory BNG does not remove protected-species duties, tree controls or designated-site safeguards. For example, local policy can still require proportionate ecological evidence.

Likewise, a positive metric result does not settle open-space protection, drainage, heritage or urban greening requirements. Therefore, confirm each relevant test before choosing a delivery solution.

National → London → the applicable local plan

Which planning policies apply in Hackney?

Hackney’s Local Plan 2033 was adopted on 22 July 2020. Check its geographic scope before relying on LP33: the former LLDC planning area remains a separate development-plan case.

Adopted policies and practical planning implications
Policy or evidenceWhat it means for your site
LP47 — Biodiversity and SINCs

LP47 addresses biodiversity and Sites of Importance for Nature Conservation. Review habitat retention, ecological networks and relevant survey evidence alongside the statutory metric.

However, a locally designated SINC is not the same as an SSSI. Instead, check the actual boundary and impact pathway. Read the adopted Local Plan and LP47.

LP46 and LP49 — Green infrastructure

LP46 concerns protection and enhancement of green infrastructure; LP49 addresses green chains and corridors. In particular, explain how trees, planting and water corridors connect beyond the site boundary.

Therefore, design isolated pockets of planting with their wider ecological function in mind. However, a larger planted area alone does not prove a stronger habitat network.

LP48 — New Open Space

For developments of ten or more homes, LP48 seeks 14m² of communal space per person and, where feasible, an Urban Greening Factor of at least 0.4. For major commercial or mixed development, it seeks 4m² per employee and, where feasible, UGF of at least 0.3.

However, these open-space and greening provisions are separate from the statutory BNG percentage. Check the full policy, feasibility and any applicable alternatives.

LP51–LP53 — Trees, water and flooding

LP51 covers trees and landscaping; LP52 and LP53 address water and flood matters. Therefore, coordinate retained trees, soil volumes, rain gardens, drainage and habitat management early.

For example, a drainage feature only contributes the biodiversity value supported by its habitat type, condition and credible long-term management.

Authority and plan status

Hackney Wick and the next Local Plan

A change in the organisation deciding applications does not automatically replace the policies used to assess them.

Former LLDC area: check the mapped boundary

Planning powers returned to Hackney on 1 December 2024. However, the LLDC Local Plan 2020–2036 and associated adopted guidance still apply in the former area until replaced.

First, use the council’s policy gateway and adopted proposals map to locate the red-line site. A Hackney Wick address alone does not establish which plan applies. Then record the relevant policy references before preparing the submission.

New Local Plan: emerging, not adopted

Scoping consultation ran from 14 September to 2 November 2026. The council expects adoption in 2029, with further consultation on evidence and policy choices in 2027.

However, these are future stages, not new adopted biodiversity requirements. Check the current Local Plan programme for subsequent decisions. Do not substitute proposed objectives for LP33 or the applicable LLDC policies.

Area guidance and planning obligations

Future Shoreditch was submitted for examination on 29 May 2026. It is not treated here as adopted. Meanwhile, existing site guidance and planning contributions may also matter.

In addition, consult the Shoreditch examination page and adopted SPD index, including the S106 Planning Contributions SPD. Confirm the relevant document and any scheme-specific obligation rather than assuming a universal biodiversity tariff.

Two calculations / one coordinated design

BNG and Urban Greening Factor are different tests

London Plan G1, G5, G6 and G7 cover green infrastructure, urban greening, biodiversity and trees. Accordingly, assess them alongside the applicable borough or legacy-area policies.

Biodiversity units

The statutory metric uses habitat area or length, type, condition and distinctiveness, with relevant risk factors. In addition, area habitats, hedgerows and watercourses have separate accounts and trading rules.

Therefore, use a BNG assessment and habitat baseline to establish the evidence. However, the Small Sites Metric is an option only where its eligibility conditions are met.

Weighted green cover

UGF measures the contribution of different surface treatments to urban greening. It can influence roofs, trees, landscaping and drainage, but it does not calculate biodiversity units.

Consequently, London G5 and Hackney LP48 require a separate policy assessment. Read the London Plan policies and UGF guidance. Therefore, a high UGF score cannot demonstrate 10% BNG.

Use the current statutory tools

Defra updated the statutory metric tool to version 1.1.1 on 10 November 2026. The guidance says statutory-tool updates do not change biodiversity unit outputs; earlier statutory versions remain usable.

However, do not confuse those versions with the older non-statutory Metric 4.0. Instead, record the tool and guide used. Check the current tools and version history before finalising calculations.

Useful local asset / evidence checklist

Check six things before fixing your strategy

This screening guide identifies separate evidence layers. However, it is not a mapped ecological assessment or confirmation that a particular site contains a designated habitat.

First establish the policy and ecological baseline
Policy or evidenceWhat it means for your site
1. Planning boundary

Overlay the red-line plan on the adopted planning map. Identify LP33 or the former LLDC policy area, then check any applicable adopted area guidance. Finally, keep the dated map extract and policy references.

Open Hackney’s planning-policy gateway.

2. Statutory eligibility

Record the application route, date, site area and priority-habitat impacts. Then test the applicable exemption and transitional rules. For example, an earlier permission or section 73 variation may require a different analysis.

Therefore, use the official exemption tests rather than a general description such as “small development”.

3. Habitats and protected sites

Combine current habitat and condition surveys with ecological records, trees and relevant watercourse evidence. Hackney’s council identifies 24 SINCs; that borough-wide count is not a finding about your plot.

Review the local nature network and obtain proportionate site-specific records.

Connect that baseline to design and delivery

Then test strategic priorities, calculations and delivery
Policy or evidenceWhat it means for your site
4. Nature-recovery priorities

Compare Hackney’s 2023 Local Nature Recovery Plan with the statutory London LNRS published in March 2026. In particular, check the relevant measure, habitat fit and site location.

For example, the London spatial dataset includes APIBs, ACBs and Potential Measure Locations. However, its open release omits some data; a fuller licensed dataset may be necessary.

5. Two calculation paths

Prepare biodiversity-unit and UGF calculations separately. Then reconcile the habitat plan, roof layouts, planting areas and drainage design. Check that solar panels, access and maintenance do not undermine assumed green-roof coverage.

Then document the metric’s strategic significance using the relevant rules and evidence. However, an opportunity polygon does not automatically justify a higher score.

6. Delivery and responsibilities

Test on-site retention and enhancement, any residual unit needs and realistic long-term management. Next, check registered off-site land, allocations and operator confirmation where necessary.

Finally, separate legal security, monitoring contributions and habitat purchase prices. Start with the official gain-sites register; registration alone does not prove available stock.

Urban wetlands / trees / green-blue corridors

Local nature recovery and habitat opportunities

Hackney adopted its Green Infrastructure Strategy and Local Nature Recovery Plan in June 2023. Five nature recovery areas support connections around its SINC network. However, this local plan is distinct from the later statutory London LNRS.

River Lea, Hackney Marshes and Hackney Wick

The Lea corridor links waterways, open space and regeneration land. Check habitat continuity, bankside vegetation, lighting, public access and the specific watercourse context.

In addition, coordinate flood and engineering constraints with ecology. However, nearby green space does not establish either an absence of development impacts or available replacement units.

Woodberry Down and Stoke Newington

Wetlands and reservoirs form part of the local green-blue network. Establish the site’s relationship to actual habitat and designation boundaries before proposing surveys or mitigation.

However, potential species and protected-site effects depend on impact pathways and current evidence. Avoid assigning a wetland designation to every nearby property.

Parks, trees and connected urban planting

Abney Park, Clissold Park, Springfield Park and Hackney Downs provide context for connected vegetation and mature trees. In addition, Regent’s Canal offers another important urban corridor.

Therefore, on a development site, assess retained trees, buffers, soils and lighting. Then choose planting that can survive the intended management regime and strengthen relevant habitat connections.

Shoreditch, Hoxton and Dalston

Dense redevelopment may depend on roofs, courtyards, rain gardens and limited ground-level planting. Nevertheless, existing brownfield habitats and mature trees still need proper assessment.

First, check substrate, water supply, structural capacity and maintenance access before assigning habitat outcomes. After all, a visually green design is not automatically a high-value or durable ecological proposal.

Use the Hackney nature-recovery evidence with London’s statutory strategy. Neither substitutes for a site survey or creates an off-site unit offer.

Documented planning evidence / February 2026

What does Cropley Court show about BNG in Hackney?

Application 2025/1791 concerned garages adjacent to Cropley Court, Cavendish Street, Hoxton West, and a proposal for 45 homes. The 4 February 2026 officer report offers a useful design lesson.

Reported proposal figures — not proof of completed habitat delivery
Policy or evidenceWhat it means for your site
18.22% proposed biodiversity gain

Paragraph 8.192 reported this BNG figure, with proposals including green roofs, planters, rain gardens, shrubs and trees. However, officers sought more detailed biodiversity and habitat-management evidence.

However, the percentage describes the assessed proposal. It does not demonstrate successful habitat establishment, monitoring or final Gain Plan discharge.

UGF 0.68: a separate measure

Paragraphs 8.193–8.194 discussed a 0.4 residential policy benchmark and a proposed UGF of 0.68. In addition, the report considered the effect of photovoltaic panels on green-roof coverage.

Therefore, the practical lesson is to reconcile rooftop layouts and both calculations before relying on design-stage scores.

Read the official Cropley Court report, paragraphs 8.192–8.194. This is a public planning example; no ACP involvement is claimed.

Hierarchy / habitat matching / verified supply

What if on-site BNG is constrained?

Hackney encourages local on-site gains wherever possible. Establish the applicable statutory hierarchy separately, including the August 2026 changes for relevant non-major development.

Start with the actual deficit

Check the units, habitat types and trading rules after realistic retention, enhancement and creation proposals. For example, a unit in the wrong habitat account cannot solve the shortfall.

However, relevant minor schemes have greater flexibility in the ordering of on-site and off-site options. Nevertheless, statutory credits remain a last resort. Read the current national planning guidance.

Check the registered land and allocation

Obtain the gain-site reference and boundary, legal security, management arrangements and evidence of units allocated to the development. Then assess spatial risk and habitat compatibility in the metric.

Finally, confirm remaining stock, reservation terms and price directly with the operator. The gain-sites register is a due-diligence starting point, not a live shop.

Keep local supply claims qualified

The evidence reviewed does not establish currently available Hackney habitat-bank stock, a saleable unit quantity or a fixed market price. However, that does not establish that suitable supply is absent.

For example, a council park, SINC or LNRS opportunity is not an offer of biodiversity units. Therefore, obtain written project-specific evidence before relying on any named supplier or site.

Assessment / delivery / legal security / monitoring

What should a Hackney BNG budget include?

Keep consultant fees, habitat management, unit purchases and statutory administration separate. The council’s monitoring policy does not establish one universal price for every project.

Published charges and important limitations — reviewed 5 November 2026
Policy or evidenceWhat it means for your site
Council monitoring contributions

Hackney describes charges for reviewing reports, site visits and remedial work. Its guidance covers significant on-site and off-site gains, plus certain non-significant gains supporting local species or networks.

However, it excludes private gardens from this fee. Moreover, no single fixed tariff was verified. Therefore, ask for the scheme-specific calculation and securing arrangements. Read the council’s monitoring policy.

National condition-approval fee: £309

The non-householder condition-approval fee is £309 from 1 April 2026, including a relevant biodiversity-gain-condition request. It is not a habitat-monitoring charge or ACP’s assessment fee.

Check the current national fee schedule when applying. A proposed consultation rate is not an enacted charge.

Gain-site administration: £639 / £45

GOV.UK guidance lists £639 for registration and £45 for recording an off-site allocation. However, these administrative charges are distinct from the price of habitat units.

Check registration and allocation fees at the transaction date and agree which party pays.

Professional work and long-term delivery

Survey complexity, seasonal evidence, design changes and legal arrangements influence the total budget. For example, include establishment, management, reporting and remedial work over the required period.

In contrast, private unit prices and government statutory credits are different cost categories. Use our BNG costs guide to scope the project.

Application → permission → habitat delivery

Prepare your Hackney planning submission

Application-stage biodiversity evidence and post-permission Gain Plan approval are separate steps. Use this checklist with the council’s live submission and validation guidance.

  • Record the red-line boundary, application date, permission route and exemption evidence. Identify LP33 or the mapped former LLDC policy area and any applicable adopted guidance.

  • Gather current surveys, ecological records, condition evidence and scaled habitat plans. Address relevant trees, priority and irreplaceable habitats, watercourses and protected species separately.

  • Use the applicable statutory metric and national minimum information. Check Hackney’s current validation checklist and explain the proposed gain approach. Do not assume a historic checklist is the latest version.

  • Reconcile biodiversity units, Urban Greening Factor, landscape drawings, roofs, solar panels and drainage. Document habitat feasibility and any off-site requirement without double counting.

  • Where the statutory condition applies, obtain Biodiversity Gain Plan approval before development starts. Coordinate legal agreements, off-site allocations and the required Habitat Management and Monitoring Plan.

  • Identify the landowner, management body, funding, monitoring and reporting arrangements. Secure the required 30-year period for significant on-site enhancements and registered off-site gains.

Our step-by-step BNG process explains the wider sequence. Confirm survey seasonality and proportionate evidence early.

Practical assessment and planning support

Bring the site evidence together

Share the site location, red-line plan, proposal, planning stage and any existing ecology or landscape documents. We can identify the work needed to progress your assessment.

A BNG assessment establishes the habitat baseline and metric evidence. After permission, coordinate the Biodiversity Gain Plan with the Habitat Management and Monitoring Plan where required. Our BNG consultants can help scope unresolved requirements.

In addition, for wider strategic context, see BNG in London. For sites across a boundary, use the relevant Islington, Haringey or Tower Hamlets guide. Each authority has its own local planning context.

Discuss your Hackney project →

Local planning questions

Hackney BNG questions

These answers distinguish statutory requirements, adopted local policy and site-specific evidence.

Does Hackney require more than 10% BNG?

The national minimum for non-exempt development is normally 10%. LP47 adds local biodiversity considerations, while LP48 addresses open space and urban greening. The reviewed evidence does not establish a blanket adopted Hackney requirement above 10%. Check the relevant policy area and scheme conditions.

Which plan applies to a site in Hackney Wick?

Hackney Council now determines applications in its former LLDC area. However, the LLDC Local Plan and associated guidance still apply within that mapped area until replaced. Check the adopted proposals map; the neighbourhood name alone does not settle the boundary.

Can a good UGF score replace the biodiversity metric?

No. UGF scores weighted green cover, while the statutory biodiversity metric measures habitat value and net gain. Coordinate the drawings and assumptions, but submit separate calculations wherever both are required.

Is Hackney’s nature recovery plan the London LNRS?

No. Hackney adopted its borough Local Nature Recovery Plan in 2023. London’s statutory LNRS was published in March 2026. Use both as relevant evidence, with site surveys and the applicable metric rules; neither guarantees unit availability.

Do small Hackney sites still need ecology evidence?

They can. A relevant statutory BNG exemption does not remove local planning policy, tree controls, protected-species duties or designated-site safeguards. Check the application date, habitat impacts and proportionate evidence before assuming that no ecological work is needed.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.