Hackney BNG / Local planning guide
Biodiversity Net Gain in Hackney
Biodiversity net gain in Hackney brings together habitat surveys, local planning policy and practical design choices on tightly constrained urban sites.
From Shoreditch rooftops to Woodberry Down’s wetlands and Hackney Wick’s waterways, establish the right policy and ecological baseline before fixing your strategy.
Evidence reviewed 5 November 2026 · Adopted policy and emerging plans distinguished
Application date / site evidence
Does your Hackney development require BNG?
First, confirm the permission route, red-line area and application date. However, the development label alone cannot establish an exemption or the required survey scope.
The statutory gain requirement
Non-exempt development normally needs at least 10% biodiversity net gain, measured using the statutory biodiversity metric. At application stage, evidence explains the baseline and approach. The Biodiversity Gain Plan normally requires approval after permission and before development begins.
In addition, secure significant on-site enhancements and registered off-site gains for at least 30 years. Then identify who will manage, monitor and fund the habitats.
Check the August 2026 changes
For relevant applications from 6 August 2026, sites of 0.2 hectares or less can qualify for exemption. In particular, this route does not apply where development decreases the biodiversity value of on-site priority habitat.
However, the separate self-build exemption ended for new applications from that date. Meanwhile, earlier permissions and variations need transitional checks. Read the current government exemptions and our BNG exemptions guide.
Separate ecology duties remain
Nevertheless, exemption from statutory BNG does not remove protected-species duties, tree controls or designated-site safeguards. For example, local policy can still require proportionate ecological evidence.
Likewise, a positive metric result does not settle open-space protection, drainage, heritage or urban greening requirements. Therefore, confirm each relevant test before choosing a delivery solution.
National → London → the applicable local plan
Which planning policies apply in Hackney?
Hackney’s Local Plan 2033 was adopted on 22 July 2020. Check its geographic scope before relying on LP33: the former LLDC planning area remains a separate development-plan case.
| Policy or evidence | What it means for your site |
|---|---|
| LP47 — Biodiversity and SINCs | LP47 addresses biodiversity and Sites of Importance for Nature Conservation. Review habitat retention, ecological networks and relevant survey evidence alongside the statutory metric. However, a locally designated SINC is not the same as an SSSI. Instead, check the actual boundary and impact pathway. Read the adopted Local Plan and LP47. |
| LP46 and LP49 — Green infrastructure | LP46 concerns protection and enhancement of green infrastructure; LP49 addresses green chains and corridors. In particular, explain how trees, planting and water corridors connect beyond the site boundary. Therefore, design isolated pockets of planting with their wider ecological function in mind. However, a larger planted area alone does not prove a stronger habitat network. |
| LP48 — New Open Space | For developments of ten or more homes, LP48 seeks 14m² of communal space per person and, where feasible, an Urban Greening Factor of at least 0.4. For major commercial or mixed development, it seeks 4m² per employee and, where feasible, UGF of at least 0.3. However, these open-space and greening provisions are separate from the statutory BNG percentage. Check the full policy, feasibility and any applicable alternatives. |
| LP51–LP53 — Trees, water and flooding | LP51 covers trees and landscaping; LP52 and LP53 address water and flood matters. Therefore, coordinate retained trees, soil volumes, rain gardens, drainage and habitat management early. For example, a drainage feature only contributes the biodiversity value supported by its habitat type, condition and credible long-term management. |
Authority and plan status
Hackney Wick and the next Local Plan
A change in the organisation deciding applications does not automatically replace the policies used to assess them.
Former LLDC area: check the mapped boundary
Planning powers returned to Hackney on 1 December 2024. However, the LLDC Local Plan 2020–2036 and associated adopted guidance still apply in the former area until replaced.
First, use the council’s policy gateway and adopted proposals map to locate the red-line site. A Hackney Wick address alone does not establish which plan applies. Then record the relevant policy references before preparing the submission.
New Local Plan: emerging, not adopted
Scoping consultation ran from 14 September to 2 November 2026. The council expects adoption in 2029, with further consultation on evidence and policy choices in 2027.
However, these are future stages, not new adopted biodiversity requirements. Check the current Local Plan programme for subsequent decisions. Do not substitute proposed objectives for LP33 or the applicable LLDC policies.
Area guidance and planning obligations
Future Shoreditch was submitted for examination on 29 May 2026. It is not treated here as adopted. Meanwhile, existing site guidance and planning contributions may also matter.
In addition, consult the Shoreditch examination page and adopted SPD index, including the S106 Planning Contributions SPD. Confirm the relevant document and any scheme-specific obligation rather than assuming a universal biodiversity tariff.
Two calculations / one coordinated design
BNG and Urban Greening Factor are different tests
London Plan G1, G5, G6 and G7 cover green infrastructure, urban greening, biodiversity and trees. Accordingly, assess them alongside the applicable borough or legacy-area policies.
Biodiversity units
The statutory metric uses habitat area or length, type, condition and distinctiveness, with relevant risk factors. In addition, area habitats, hedgerows and watercourses have separate accounts and trading rules.
Therefore, use a BNG assessment and habitat baseline to establish the evidence. However, the Small Sites Metric is an option only where its eligibility conditions are met.
Weighted green cover
UGF measures the contribution of different surface treatments to urban greening. It can influence roofs, trees, landscaping and drainage, but it does not calculate biodiversity units.
Consequently, London G5 and Hackney LP48 require a separate policy assessment. Read the London Plan policies and UGF guidance. Therefore, a high UGF score cannot demonstrate 10% BNG.
Use the current statutory tools
Defra updated the statutory metric tool to version 1.1.1 on 10 November 2026. The guidance says statutory-tool updates do not change biodiversity unit outputs; earlier statutory versions remain usable.
However, do not confuse those versions with the older non-statutory Metric 4.0. Instead, record the tool and guide used. Check the current tools and version history before finalising calculations.
Useful local asset / evidence checklist
Check six things before fixing your strategy
This screening guide identifies separate evidence layers. However, it is not a mapped ecological assessment or confirmation that a particular site contains a designated habitat.
| Policy or evidence | What it means for your site |
|---|---|
| 1. Planning boundary | Overlay the red-line plan on the adopted planning map. Identify LP33 or the former LLDC policy area, then check any applicable adopted area guidance. Finally, keep the dated map extract and policy references. |
| 2. Statutory eligibility | Record the application route, date, site area and priority-habitat impacts. Then test the applicable exemption and transitional rules. For example, an earlier permission or section 73 variation may require a different analysis. Therefore, use the official exemption tests rather than a general description such as “small development”. |
| 3. Habitats and protected sites | Combine current habitat and condition surveys with ecological records, trees and relevant watercourse evidence. Hackney’s council identifies 24 SINCs; that borough-wide count is not a finding about your plot. Review the local nature network and obtain proportionate site-specific records. |
Connect that baseline to design and delivery
| Policy or evidence | What it means for your site |
|---|---|
| 4. Nature-recovery priorities | Compare Hackney’s 2023 Local Nature Recovery Plan with the statutory London LNRS published in March 2026. In particular, check the relevant measure, habitat fit and site location. For example, the London spatial dataset includes APIBs, ACBs and Potential Measure Locations. However, its open release omits some data; a fuller licensed dataset may be necessary. |
| 5. Two calculation paths | Prepare biodiversity-unit and UGF calculations separately. Then reconcile the habitat plan, roof layouts, planting areas and drainage design. Check that solar panels, access and maintenance do not undermine assumed green-roof coverage. Then document the metric’s strategic significance using the relevant rules and evidence. However, an opportunity polygon does not automatically justify a higher score. |
| 6. Delivery and responsibilities | Test on-site retention and enhancement, any residual unit needs and realistic long-term management. Next, check registered off-site land, allocations and operator confirmation where necessary. Finally, separate legal security, monitoring contributions and habitat purchase prices. Start with the official gain-sites register; registration alone does not prove available stock. |
Urban wetlands / trees / green-blue corridors
Local nature recovery and habitat opportunities
Hackney adopted its Green Infrastructure Strategy and Local Nature Recovery Plan in June 2023. Five nature recovery areas support connections around its SINC network. However, this local plan is distinct from the later statutory London LNRS.
River Lea, Hackney Marshes and Hackney Wick
The Lea corridor links waterways, open space and regeneration land. Check habitat continuity, bankside vegetation, lighting, public access and the specific watercourse context.
In addition, coordinate flood and engineering constraints with ecology. However, nearby green space does not establish either an absence of development impacts or available replacement units.
Woodberry Down and Stoke Newington
Wetlands and reservoirs form part of the local green-blue network. Establish the site’s relationship to actual habitat and designation boundaries before proposing surveys or mitigation.
However, potential species and protected-site effects depend on impact pathways and current evidence. Avoid assigning a wetland designation to every nearby property.
Parks, trees and connected urban planting
Abney Park, Clissold Park, Springfield Park and Hackney Downs provide context for connected vegetation and mature trees. In addition, Regent’s Canal offers another important urban corridor.
Therefore, on a development site, assess retained trees, buffers, soils and lighting. Then choose planting that can survive the intended management regime and strengthen relevant habitat connections.
Shoreditch, Hoxton and Dalston
Dense redevelopment may depend on roofs, courtyards, rain gardens and limited ground-level planting. Nevertheless, existing brownfield habitats and mature trees still need proper assessment.
First, check substrate, water supply, structural capacity and maintenance access before assigning habitat outcomes. After all, a visually green design is not automatically a high-value or durable ecological proposal.
Use the Hackney nature-recovery evidence with London’s statutory strategy. Neither substitutes for a site survey or creates an off-site unit offer.
Documented planning evidence / February 2026
What does Cropley Court show about BNG in Hackney?
Application 2025/1791 concerned garages adjacent to Cropley Court, Cavendish Street, Hoxton West, and a proposal for 45 homes. The 4 February 2026 officer report offers a useful design lesson.
| Policy or evidence | What it means for your site |
|---|---|
| 18.22% proposed biodiversity gain | Paragraph 8.192 reported this BNG figure, with proposals including green roofs, planters, rain gardens, shrubs and trees. However, officers sought more detailed biodiversity and habitat-management evidence. However, the percentage describes the assessed proposal. It does not demonstrate successful habitat establishment, monitoring or final Gain Plan discharge. |
| UGF 0.68: a separate measure | Paragraphs 8.193–8.194 discussed a 0.4 residential policy benchmark and a proposed UGF of 0.68. In addition, the report considered the effect of photovoltaic panels on green-roof coverage. Therefore, the practical lesson is to reconcile rooftop layouts and both calculations before relying on design-stage scores. |
Read the official Cropley Court report, paragraphs 8.192–8.194. This is a public planning example; no ACP involvement is claimed.
Hierarchy / habitat matching / verified supply
What if on-site BNG is constrained?
Hackney encourages local on-site gains wherever possible. Establish the applicable statutory hierarchy separately, including the August 2026 changes for relevant non-major development.
Start with the actual deficit
Check the units, habitat types and trading rules after realistic retention, enhancement and creation proposals. For example, a unit in the wrong habitat account cannot solve the shortfall.
However, relevant minor schemes have greater flexibility in the ordering of on-site and off-site options. Nevertheless, statutory credits remain a last resort. Read the current national planning guidance.
Check the registered land and allocation
Obtain the gain-site reference and boundary, legal security, management arrangements and evidence of units allocated to the development. Then assess spatial risk and habitat compatibility in the metric.
Finally, confirm remaining stock, reservation terms and price directly with the operator. The gain-sites register is a due-diligence starting point, not a live shop.
Keep local supply claims qualified
The evidence reviewed does not establish currently available Hackney habitat-bank stock, a saleable unit quantity or a fixed market price. However, that does not establish that suitable supply is absent.
For example, a council park, SINC or LNRS opportunity is not an offer of biodiversity units. Therefore, obtain written project-specific evidence before relying on any named supplier or site.
Assessment / delivery / legal security / monitoring
What should a Hackney BNG budget include?
Keep consultant fees, habitat management, unit purchases and statutory administration separate. The council’s monitoring policy does not establish one universal price for every project.
| Policy or evidence | What it means for your site |
|---|---|
| Council monitoring contributions | Hackney describes charges for reviewing reports, site visits and remedial work. Its guidance covers significant on-site and off-site gains, plus certain non-significant gains supporting local species or networks. However, it excludes private gardens from this fee. Moreover, no single fixed tariff was verified. Therefore, ask for the scheme-specific calculation and securing arrangements. Read the council’s monitoring policy. |
| National condition-approval fee: £309 | The non-householder condition-approval fee is £309 from 1 April 2026, including a relevant biodiversity-gain-condition request. It is not a habitat-monitoring charge or ACP’s assessment fee. Check the current national fee schedule when applying. A proposed consultation rate is not an enacted charge. |
| Gain-site administration: £639 / £45 | GOV.UK guidance lists £639 for registration and £45 for recording an off-site allocation. However, these administrative charges are distinct from the price of habitat units. Check registration and allocation fees at the transaction date and agree which party pays. |
| Professional work and long-term delivery | Survey complexity, seasonal evidence, design changes and legal arrangements influence the total budget. For example, include establishment, management, reporting and remedial work over the required period. In contrast, private unit prices and government statutory credits are different cost categories. Use our BNG costs guide to scope the project. |
Application → permission → habitat delivery
Prepare your Hackney planning submission
Application-stage biodiversity evidence and post-permission Gain Plan approval are separate steps. Use this checklist with the council’s live submission and validation guidance.
Record the red-line boundary, application date, permission route and exemption evidence. Identify LP33 or the mapped former LLDC policy area and any applicable adopted guidance.
Gather current surveys, ecological records, condition evidence and scaled habitat plans. Address relevant trees, priority and irreplaceable habitats, watercourses and protected species separately.
Use the applicable statutory metric and national minimum information. Check Hackney’s current validation checklist and explain the proposed gain approach. Do not assume a historic checklist is the latest version.
Reconcile biodiversity units, Urban Greening Factor, landscape drawings, roofs, solar panels and drainage. Document habitat feasibility and any off-site requirement without double counting.
Where the statutory condition applies, obtain Biodiversity Gain Plan approval before development starts. Coordinate legal agreements, off-site allocations and the required Habitat Management and Monitoring Plan.
Identify the landowner, management body, funding, monitoring and reporting arrangements. Secure the required 30-year period for significant on-site enhancements and registered off-site gains.
Our step-by-step BNG process explains the wider sequence. Confirm survey seasonality and proportionate evidence early.
Practical assessment and planning support
Bring the site evidence together
Share the site location, red-line plan, proposal, planning stage and any existing ecology or landscape documents. We can identify the work needed to progress your assessment.
A BNG assessment establishes the habitat baseline and metric evidence. After permission, coordinate the Biodiversity Gain Plan with the Habitat Management and Monitoring Plan where required. Our BNG consultants can help scope unresolved requirements.
In addition, for wider strategic context, see BNG in London. For sites across a boundary, use the relevant Islington, Haringey or Tower Hamlets guide. Each authority has its own local planning context.
Discuss your Hackney project →Local planning questions
Hackney BNG questions
These answers distinguish statutory requirements, adopted local policy and site-specific evidence.
Does Hackney require more than 10% BNG?
The national minimum for non-exempt development is normally 10%. LP47 adds local biodiversity considerations, while LP48 addresses open space and urban greening. The reviewed evidence does not establish a blanket adopted Hackney requirement above 10%. Check the relevant policy area and scheme conditions.
Which plan applies to a site in Hackney Wick?
Hackney Council now determines applications in its former LLDC area. However, the LLDC Local Plan and associated guidance still apply within that mapped area until replaced. Check the adopted proposals map; the neighbourhood name alone does not settle the boundary.
Can a good UGF score replace the biodiversity metric?
No. UGF scores weighted green cover, while the statutory biodiversity metric measures habitat value and net gain. Coordinate the drawings and assumptions, but submit separate calculations wherever both are required.
Is Hackney’s nature recovery plan the London LNRS?
No. Hackney adopted its borough Local Nature Recovery Plan in 2023. London’s statutory LNRS was published in March 2026. Use both as relevant evidence, with site surveys and the applicable metric rules; neither guarantees unit availability.
Do small Hackney sites still need ecology evidence?
They can. A relevant statutory BNG exemption does not remove local planning policy, tree controls, protected-species duties or designated-site safeguards. Check the application date, habitat impacts and proportionate evidence before assuming that no ecological work is needed.
Talk to ACP / Site enquiries
What does your site need next?
Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.
What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.
Request a site-specific quotation
Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.
We use your details to respond to your enquiry. Read our Privacy Policy.
Evidence register
Sources and review dates
Primary evidence reviewed 5 November 2026. The latest council checklist edition, parcel-level habitat findings and current off-site stock require project-specific checks.
Hackney policy and planning evidence
Local Plan 2033 for Hackney — adopted July 2020
Adopted planning policies and former LLDC boundary
New Local Plan — 2026 scoping and timetable
Future Shoreditch examination — submitted May 2026
Cropley Court 2025/1791 — 4 February 2026 officer report
Application submission and validation — Hackney Council
Biodiversity monitoring and planning guidance — Hackney Council
Nature recovery and London policy
National rules, tools and delivery charges
National BNG planning guidance
BNG exemptions — updated 6 August 2026
Statutory biodiversity metric — updated 10 November 2026
National planning fees — effective 1 April 2026
Official biodiversity gain sites register guidance
Gain-site registration and administration charge