Biodiversity Net Gain in Haringey

Biodiversity net gain in Haringey needs a clear habitat baseline, the right planning evidence and a practical delivery plan.

From Tottenham and Wood Green to Hornsey, Muswell Hill and Highgate, site conditions shape the assessment. We help connect surveys, biodiversity calculations and Haringey’s local requirements before design decisions become costly to change.

Evidence reviewed 5 November 2026 · Adopted policies, emerging proposals and anticipated gains distinguished

Application date / site area / habitat impacts

Does statutory BNG apply to your development?

First, establish the application date, permission route and site area. Then check habitat impacts: an urban address alone cannot establish an exemption.

Check the current exemption rules

For relevant applications from 6 August 2026, sites of 0.2 hectares or less may qualify for exemption. However, the exemption does not apply where development reduces the value of on-site priority habitat.

The former self-build exemption also ended for new applications from that date. Therefore, review current national exemptions and transitional rules for earlier permissions and variations.

Separate application evidence from approval

In-scope development normally needs at least 10% biodiversity gain using the statutory metric. Supply the required baseline information and proposed approach with the planning application.

After permission, the Biodiversity Gain Plan normally needs approval before commencement. In addition, significant on-site enhancements and off-site gains require the applicable long-term security.

An exemption does not remove every ecology requirement

Haringey’s SP13 and DM19, protected-species duties, tree controls and designated-site safeguards can still matter. Consequently, scope ecology evidence separately from the statutory gain calculation.

Use our BNG exemptions guide for the detailed national rules. For a live project, record the evidence supporting the exemption rather than relying on a general description.

National law → London Plan → Haringey policies

Which Haringey planning requirements apply?

Haringey Council is the borough planning authority. Its adopted policies sit alongside the London Plan and national requirements; no single BNG calculation replaces them.

Adopted requirements and emerging proposals
Policy or evidenceWhat it means for your site
SP13 — Open Space and Biodiversity

The consolidated 2017 Strategic Policies establish the local open-space and biodiversity framework. Consider designated sites, habitat networks and ecological enhancement when explaining the design.

For example, assess how retained vegetation connects to nearby open space. However, a policy reference is not evidence that a particular plot lies within a designation.

DM19 — Nature Conservation

The adopted 2017 Development Management DPD provides the detailed nature-conservation policy. Review SINCs, priority habitats, ecological corridors, protected species and relevant development effects.

Therefore, explain avoidance, mitigation and any necessary compensation alongside the metric. A positive BNG result does not cancel separate species or habitat protection.

London Plan G1, G5, G6 and G7

These policies address green infrastructure, urban greening, biodiversity and trees. For relevant major schemes, prepare the separate Urban Greening Factor assessment under G5.

Coordinate landscape, roofs, drainage and trees using London Plan Chapter 8. Also check site allocations and other adopted requirements relevant to the proposal.

Published Local Validation List — August 2024

Haringey’s published 2024 list includes BNG reporting and metric information for applicable schemes. It also identifies landscaping and UGF evidence for relevant major development.

However, it predates the August 2026 exemptions. A newer republication was not verified at this review; confirm the current list and submission requirements with the council. National minimum information remains a separate obligation.

Replacement Local Plan 2027–2042: emerging

The proposed-submission documents were before Strategic Planning Committee on 2 November 2026. As at this review, Cabinet consideration was scheduled for 10 November 2026.

That process is not adoption. Therefore, do not treat draft clauses as an adopted higher BNG target. Check the formal plan timetable and status before relying on subsequent decisions.

Two calculations / coordinated drawings

BNG and urban greening measure different things

A scheme can need both a biodiversity assessment and an urban greening assessment. Prepare consistent drawings, but keep the calculations and conclusions distinct.

Statutory biodiversity metric

The metric measures habitat value and change, with separate area, hedgerow and watercourse accounts where relevant. Baseline condition, habitat type, delivery risks and location affect the outcome.

Use the current statutory metric tools. The Small Sites Metric has its own eligibility rules; the older non-statutory Metric 4.0 is not the current tool.

Urban Greening Factor

UGF measures weighted green cover. London guidance generally uses 0.4 for predominantly residential and 0.3 for predominantly commercial major development, subject to relevant policy.

For example, a UGF score of 0.40 does not mean 40% BNG. Use the GLA’s UGF guidance and reconcile planting, roofs and drainage with the habitat plan.

Ancient woodland / green corridors / Lea Valley

Haringey habitats and nature-recovery priorities

Local ecological context helps set the survey scope and identify realistic design opportunities. Nevertheless, borough evidence cannot establish habitat condition or species presence on your site.

Woodlands and western neighbourhoods

The March 2026 biodiversity duty report describes restoration at Queen’s Wood, Coldfall Wood and Bluebell Wood. Work includes soil and hydrology, deadwood, invasive control and management planning.

Near Highgate or Muswell Hill, check actual woodland boundaries, buffers and indirect effects. In particular, irreplaceable habitat protection cannot simply be traded away through ordinary biodiversity units.

Parkland Walk and urban connections

Linear habitats and connected parks matter to the ecological network. Around Hornsey, Wood Green and redevelopment sites, assess how trees, gardens, roofs and green routes connect.

Then test feasible habitat creation against soil, shade, access and maintenance. A planted roof needs a workable specification and management plan, rather than a metric label alone.

River Lea, Tottenham Marshes and The Paddock

The eastern borough has a different green-blue context. Consider riparian habitats, wetlands, flood and drainage relationships where the actual site and impact pathways make them relevant.

The duty report identifies The Paddock as a new Local Nature Reserve with a 25-year stewardship partnership. However, that arrangement does not establish a registered BNG bank or a 30-year gain obligation.

London’s published nature-recovery strategy

The London LNRS identifies important biodiversity areas, potential recovery areas and locations for measures. Haringey’s woodland, wetland, meadow and corridor programmes provide relevant local context.

Overlay the LNRS spatial layers with the site boundary. Then evidence habitat fit and strategic significance using the metric rules; mapped opportunity is not automatic unit supply.

Use dated designation evidence carefully

The 2025 Authority Monitoring Report recorded 59 SINCs and five Local Nature Reserves. The later duty report describes The Paddock, so those older totals should not be presented as a definitive November 2026 count.

Check current adopted maps and ecological records. Likewise, candidate sites in the 2024 SINC review are not automatically designated. Consult the 2026 duty report, dated monitoring report and SINC review for their distinct evidence scopes.

Proposed units / separate UGF / delivery evidence

What Haringey’s published BNG applications show

Public council evidence gives useful lessons about the size and timing of gains. These examples are not ACP projects or proof of completed habitat delivery.

Read the baseline, percentage and approval stage together
Policy or evidenceWhat it means for your site
505–511 Archway Road — HGY/2025/1220

The 6 November 2025 committee addendum for 16 council homes reported approximately 0.42 baseline area units and 1.43 proposed units. Officers reported 245% gain and, separately, 0.03 hedgerow units.

The separate UGF was 0.40. Conditions 11 and 12 addressed the Biodiversity Gain Plan and monitoring; the papers do not prove those conditions were discharged.

The percentage may use unrounded data, so do not recalculate it from rounded headline figures. Instead, compare absolute units, habitat feasibility and the officer’s supporting explanation.

Borough reporting — period ending 31 December 2025

The March 2026 duty report records seven major and six minor schemes where BNG applied. Expected combined uplift was about five biodiversity units for the majors and one for the minors.

Five of the seven majors and four of the six minors proposed on-site gains above 10%. However, these are expected planning-stage outcomes, not monitored mature habitats.

Consequently, use the council’s reported sample as local evidence, not a prediction that every new urban scheme can deliver the same result. August 2026 exemption changes also affect later comparisons.

Survey / metric / drawings / delivery

Prepare the right Haringey BNG evidence

Begin with the boundary, proposal and planning stage. A coherent evidence package explains what is present, what will change and how the proposed gains will remain achievable.

Before and with the application

Commission a proportionate BNG assessment and habitat baseline survey. Record habitat types, condition, survey dates and the relevant tree, hedgerow or watercourse inputs.

Then supply the required national information and current local documents. Align the metric workbook, existing and proposed habitat plans, ecology reports and any separate UGF assessment.

After permission and before commencement

Where the gain condition applies, obtain the necessary Gain Plan approval before starting development. Confirm registered off-site allocations and legal security where the strategy relies on them.

For significant on-site enhancements and off-site gains, address at least 30 years of management and monitoring as applicable. A Habitat Management and Monitoring Plan should assign realistic actions, responsibility, funding and review.

The published local list is dated August 2024. Therefore, confirm its current version and publication status; do not present it as a verified new 2026 list. Its age does not remove national BNG information requirements or relevant ecological assessment needs.

Gain hierarchy / registry / available stock

Off-site biodiversity units for Haringey sites

First, establish the actual shortfall in the relevant habitat account. Then assess delivery options against the gain hierarchy, trading rules, location and long-term security.

Select a defensible delivery route

Use the applicable national gain hierarchy. Following the August 2026 changes, qualifying minor schemes can treat on-site enhancement or creation and off-site gain at the same tier after retention.

However, statutory credits remain the last resort. Check current national planning guidance rather than assuming every scheme follows an identical sequence.

Check supply rather than assuming it

Haringey’s duty report says the council will explore borough-managed off-site provision. That is not evidence of an operating habitat bank, available units or a confirmed price.

No specific saleable Haringey allocation was verified for this guide. Nevertheless, suitable regional supply may exist: check the official gain-sites register and obtain current operator evidence.

Registration is the start of a procurement check

Confirm the parcel, habitat type, remaining stock, existing allocations and legal agreement. In addition, assess spatial risk, trading rules, management funding and the proposed allocation to your development.

An LNRS opportunity, SINC or nature reserve is not a sale offer. Use the off-site allocation guidance and a dated provider quotation before committing to the delivery assumption.

2026/27 schedule / qualifying schemes / separate budgets

Haringey BNG monitoring fees and project costs

Haringey approved its 2026/27 non-statutory fees on 9 December 2025, for application from 1 April 2026 unless otherwise stated. Confirm any in-year change and the charge’s application to your scheme.

Council BNG monitoring bands — approved 2026/27 schedule
Qualifying developmentPublished monitoring charge
Qualifying minors

£6,000. The council’s qualifying criteria matter; this is not a charge for every small or exempt project.

Qualifying majors: 10–99 homes or 1,000–9,999 m²

£10,000. This is a council monitoring contribution, not the price of a BNG report.

Qualifying majors: 100+ homes or 10,000+ m²

£17,000. Confirm the scheme-specific obligation and payment arrangements with the authority.

Read the fee appendix with its Cabinet approval. The BNG rows do not expressly state VAT treatment. Other section 106 items are separate; do not automatically add them without a scheme-specific basis.

National processing and professional work

The April 2026 national schedule sets £309 for a non-householder condition-approval request, including a relevant biodiversity gain condition. Check the current fee schedule when submitting.

That processing fee is separate from ecological surveys, metric modelling and Gain Plan preparation. Professional scope depends on habitat complexity, survey timing and the design evidence available.

Units, legal agreements and management

Budget separately for private units, legal arrangements, habitat establishment and long-term monitoring where needed. No verified Haringey private unit price is quoted here.

Government statutory credit prices are a different category. Our BNG costs and pricing guide explains the wider budget without treating monitoring fees as a consultancy quote.

Seven evidence layers / one coordinated strategy

Your Haringey biodiversity site checklist

Use these checks before fixing the design or relying on an off-site purchase. They organise the evidence; they cannot replace a site survey or an application-specific planning decision.

  • Record the address, red-line plan, application date and earlier permissions. Then test the applicable exemption and transitional rules, including priority-habitat impacts.

  • Check SP13, DM19, the London Plan and relevant site policies. Keep the proposed replacement Local Plan and consultation documents clearly separate.

  • Start with national minimum BNG information. Also confirm Haringey’s current local-list version; the published August 2024 document predates important legal changes.

  • Gather survey and condition evidence, with separate species or tree work where needed. Then model absolute units and percentage gain using the appropriate current metric.

  • Reconcile landscape, roof, drainage and tree drawings. Where UGF applies, prepare its separate calculation and ensure both assessments describe the same design.

  • Check current SINC, woodland and other relevant mapped boundaries against the site. In addition, assess London LNRS habitat priorities and evidence any metric strategic significance.

  • Confirm the Gain Plan, allocations, legal security and management arrangements where required. Finally, distinguish council monitoring charges, professional fees and habitat-delivery costs.

For the national sequence, follow our BNG process guide. Keep the same version trail across the metric, drawings, permission and management documents.

Survey scope / planning evidence / practical delivery

Discuss your Haringey site with ACP

Send the site address, red-line boundary, proposal and planning stage, together with any existing ecology or landscape information. We can then identify the assessment and documentation your project needs.

Our BNG consultants can help coordinate the baseline, metric and planning evidence. Early scoping also identifies seasonal surveys and design dependencies before the programme relies on untested assumptions.

For wider policy context, see BNG in London. Across nearby boundaries, use the guides for Barnet, Enfield, Hackney and Islington. Each authority has its own local planning evidence and requirements.

Send your Haringey site details →

Eligibility / policy / fees / delivery

Haringey BNG questions

These answers address the borough’s practical planning and delivery issues. Use the linked evidence in the relevant sections to check dates, scope and current requirements.

Do small Haringey sites still need a BNG assessment?

It depends on the application route, date and habitat impacts. Relevant sites of 0.2 hectares or less can qualify for the August 2026 exemption, unless development impacts on-site priority habitat. However, separate ecology, tree and protected-species evidence may still be needed.

Has the replacement Haringey Local Plan been adopted?

Not at this guide’s 5 November 2026 review. The proposed-submission documents were before committee on 2 November, with Cabinet consideration scheduled for 10 November. Therefore, distinguish emerging proposals from adopted SP13, DM19 and London Plan policy.

Does the August 2024 validation list settle current requirements?

No. It is useful evidence of the council’s published expectations, but it predates the August 2026 exemptions. A newer republication was not verified. Therefore, check the current local-list version alongside the independently applicable national information requirements.

Does every minor scheme pay the £6,000 monitoring fee?

No. The approved 2026/27 schedule labels this band for qualifying minors. Confirm whether the contribution applies to the specific project and its planning arrangements. It is separate from consultancy fees, national processing charges and any off-site units.

Does a 245% proposed gain mean a large habitat improvement?

Not necessarily. A small baseline can produce a large percentage. The Archway Road papers also report absolute habitat units and a separate UGF score. Therefore, assess the baseline, proposed habitats, conditions and delivery evidence together.

Can I buy biodiversity units from The Paddock?

No current saleable allocation there was verified for this guide. A reserve designation or stewardship partnership does not establish unit stock. Instead, check registration, legal security, habitat matching, existing allocations and a dated operator offer.

When do the Gain Plan and management arrangements matter?

Where the gain condition applies, the Biodiversity Gain Plan normally needs approval before development begins. Significant on-site enhancements and off-site gains also need the applicable long-term security and management evidence. However, do not assume every exempt small scheme needs a 30-year HMMP.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.