Havering / Local planning guide

Biodiversity Net Gain in Havering

Biodiversity net gain in Havering starts with the site’s habitats, planning route and connections to the borough’s rivers and green spaces.

From Romford and Hornchurch to Rainham, Upminster and Harold Hill, local evidence shapes the right approach. ACP connects habitat surveys, metric calculations and Biodiversity Gain Plans with Havering’s adopted planning policies.

Evidence reviewed 5 November 2026 · Adopted November 2021 Local Plan · Council charges distinguished from unit prices

Application date / site area / habitat impacts

Does statutory BNG apply to your Havering project?

Where the statutory gain condition applies, development normally needs at least 10% biodiversity gain. However, first establish the application route and any exemption or transitional arrangements.

Check the current exemption rules

For relevant applications from 6 August 2026, development sites of 0.2 hectares or less can qualify for exemption. This does not cover development that reduces the value of on-site priority habitat. Also check permission variations and the original application date.

The blanket self-build exemption ended for new applications from that date. Therefore, use the current national exemptions and our BNG exemptions guide before assuming a small site needs a statutory metric.

Keep other ecological duties in view

An exemption from statutory BNG does not remove protected-species, designated-site or tree requirements. Havering’s local biodiversity policies and London Plan requirements also need their own assessment.

For example, a site can need ecological evidence even when no statutory Gain Plan is required. Establish the actual habitats and impact pathways rather than relying on a postcode or a borough-wide map.

National framework → London Plan → borough policies

Havering’s biodiversity and river-corridor policies

The Havering Local Plan 2016–2031, adopted in November 2021, remains the adopted local plan. Its policies connect habitat protection, green infrastructure and development design.

The adopted policy tests and their practical implications
Policy or evidenceWhat it means for your site
Policy 29 — Green infrastructure

Plan green spaces, trees, drainage and habitat connections as a network. The policy refers to Thames Chase Community Forest, Rainham Wildspace and wider landscape partnerships. Therefore, test links beyond the application boundary rather than treating planting as isolated decoration.

Policy 30 — Biodiversity and geodiversity

Assess effects on protected sites, SINCs, habitats and species. Follow the relevant avoidance, mitigation and compensation requirements, and consider native vegetation and ecological connections. This local policy operates alongside the national gain condition; it does not create an additional borough-wide 20% BNG target.

Policy 31 — Rivers and river corridors

Consider river restoration opportunities for relevant major development. The policy includes 8m and 16m setbacks for applicable watercourses and tidal rivers or flood-defence structures. Check the precise policy, mapped asset and current Environment Agency advice before fixing the site layout.

Policies 27 and 32 — landscape and flood management

Coordinate landscape, tree, drainage and flood-risk evidence with the habitat strategy. A general landscape-maintenance requirement is different from the statutory minimum 30-year commitment for qualifying biodiversity gains.

London Plan G1, G5, G6 and G7

Address green infrastructure, Urban Greening Factor, biodiversity and trees where applicable. Use consistent drawings across these assessments, while keeping each calculation and policy test distinct.

Read the adopted Havering Local Plan, Policies 29–31 alongside the London Plan green infrastructure policies. Also check relevant allocations, the policies map and guidance for the actual parcel.

An emerging plan is not an adopted replacement

The council is preparing a new Local Plan. As at 5 November 2026, its published programme lists Cabinet consideration of a timetable and notice of intention for 11 November 2026.

That forthcoming step does not replace the adopted 2021 policies. Follow the Local Plan update and published Cabinet timetable item when an application moves forward.

Seven checks / clear evidence / proportionate scope

A practical Havering site-evidence checklist

Use this sequence before fixing a layout or buying units. It connects each planning question to evidence that the project team can obtain and review.

Seven checks before committing to a BNG strategy
CheckEvidence and decision
01. Establish the statutory route

Record the application date, red-line area, permission history and priority-habitat impacts. Then explain whether the gain condition applies and which transition or exemption is relevant.

02. Check adopted policies and allocations

Locate the site against Havering’s policies map. Read Policies 29, 30 and 31 with relevant allocation, landscape and flood requirements; a broad place name is not parcel evidence.

03. Map habitats, designations and species evidence

Use current GiGL records, Natural England mapping and an appropriate site survey. Then distinguish local SINCs from statutory SSSIs and other protected sites.

04. Identify river and tidal constraints

Locate the watercourse, bank, flood assets and possible ecological pathways. Check Policy 31 and Environment Agency advice before applying a setback or modelling watercourse units.

05. Review nature-recovery priorities

Compare the site and proposed habitats with London LNRS layers. Record the specific priority and measure supporting any strategic-significance entry in the metric.

06. Reconcile the metric and urban greening

Use a consistent landscape, tree, roof and drainage design. However, calculate biodiversity units and the applicable Urban Greening Factor separately.

07. Plan submission, delivery and costs

Identify application-stage evidence, Gain Plan approval, legal security and long-term management. For purchased units, verify registration, availability, habitat matching and allocation.

Start with the council’s BNG validation guidance, Natural England MAGIC maps and London LNRS spatial data. This checklist supports scoping; it does not establish a site-specific exemption, ecological impact or unit allocation.

Ingrebourne / Rom and Beam / Thames-side habitats

Havering’s habitats and ecological connections

The borough combines urban redevelopment, extensive open land and sensitive wetland corridors. Consequently, neighbouring projects can need quite different survey and habitat-delivery strategies.

Ingrebourne Marshes and the valley

Havering Council identifies Ingrebourne Marshes SSSI as London’s largest continuous freshwater reedbed. The wider valley includes wet grassland, Hornchurch Country Park and connections towards Ingrebourne Hill.

The council’s Ingrebourne Valley evidence describes water vole and wetland bird interest. Therefore, assess hydrology, lighting, disturbance and habitat connections where a project could affect them. These records do not prove species presence on every nearby plot.

Romford, Rainham and Beam Park

Romford and Hornchurch redevelopment can involve hardstanding, trees, roofs and fragmented green spaces. In contrast, Rainham and Beam Park projects may have riverside, floodplain, industrial or estuarine interfaces.

Check the actual site history, ground conditions and river connections before specifying habitat creation. The Rom/Beam, Ingrebourne and Thames corridors can affect design choices, but each plot needs its own evidence.

Selected GiGL borough evidence — February 2026 research edition
EvidenceHow to use it
101 Sites of Importance for Nature Conservation

The recorded SINC network covers 2,428.1 hectares, or 21.2% of the borough. Check the current boundary and reasons for designation where a site could affect this network.

655.5 hectares of priority habitats

The factsheet records priority habitat across 5.7% of the borough. It is a strategic snapshot, not a development-site baseline or a list of purchasable biodiversity units.

The GiGL Havering Borough Factsheet provides context. Request current parcel-level records and undertake the required survey; mapped habitat categories can overlap.

Be precise about Rainham Marshes

The RSPB Rainham Marshes visitor entrance is at Purfleet in Thurrock. The wider marshland and estuary matter to landscape-scale ecology, but the reserve’s name does not place all its land within Havering.

Use the RSPB location information and official designation boundaries for the actual impact assessment. Neither a reserve nor a Green Belt designation establishes registered off-site unit supply.

Different tools / coordinated design / mapped priorities

BNG, urban greening and nature recovery

These three frameworks can support the same landscape design. Nevertheless, each has a different purpose and needs evidence suited to that purpose.

Biodiversity units and the UGF

The statutory biodiversity metric measures habitat value and change. Habitat type, condition, delivery risk and trading rules matter; area habitats, hedgerows and watercourses have separate accounts.

London Plan G5 uses a weighted surface-area calculation for urban greening on relevant major developments. Therefore, a UGF score of 0.4 does not mean 40% BNG. Follow the GLA Urban Greening Factor guidance and coordinate the underlying plans.

London’s published LNRS

London published its Local Nature Recovery Strategy in March 2026. Its maps distinguish existing biodiversity importance, possible recovery areas and locations for potential measures.

Use the London LNRS to investigate habitat connections and restoration priorities. Then record the actual spatial and habitat evidence supporting any strategic-significance selection, rather than assuming all Havering habitat earns the same score.

Use the right spatial evidence

The public LNRS dataset was updated on 30 September 2026. Its open release omits some polygons and fields, so it does not exactly reproduce the full Local Habitat Map.

Check the dataset notes and obtain fuller GiGL evidence where needed. In particular, an opportunity layer is neither a new protected designation nor permission to sell biodiversity units.

Public council evidence / P1463.24 / Hornchurch

What Dorrington Gardens shows about BNG evidence

The proposal at the car park beside 30 Dorrington Gardens, Hornchurch, involved 34 homes. Havering’s register records approval with an agreement on 6 January 2026.

The documented planning process

The May 2025 committee material considered a Preliminary Ecological Appraisal and BNG assessment. Proposed measures included planting, wildlife features and habitat management, alongside landscape and drainage design.

The report also addressed reptile mitigation, wildlife-sensitive lighting and biodiversity enhancement. These separate matters show why a metric spreadsheet alone cannot answer every ecology question.

The practical lesson for applicants

Align the habitat plan, metric, species measures and management responsibilities from the outset. Then track what the permission and legal agreement require at each stage.

This is independent public planning evidence. It does not establish an approved post-permission Gain Plan, completed habitat gains or ACP involvement. Read the P1463.24 planning record with the 8 May 2025 committee item.

Validation / permission / commencement / management

What to submit, and when

Havering requires the national minimum BNG information where an application falls within the gain condition. Its guidance warns that missing information can prevent validation.

At the planning application stage

Establish applicability, the habitat baseline, relevant dates and the required metric information. Commission a competent habitat assessment and provide the appropriate existing-habitat plan and supporting evidence.

Our BNG assessment and UKHab survey service supports this work. The Small Sites Metric has separate eligibility rules; being a small development does not automatically make that tool suitable.

After permission, before starting work

Where required, obtain approval of the Biodiversity Gain Plan before commencement. Reconcile its metric, drawings and any registered off-site allocations with the permission.

Significant on-site enhancements and off-site gains need the applicable minimum 30-year legal arrangements. A Habitat Management and Monitoring Plan can set out delivery actions, funding, monitoring and responsibility.

Read older validation wording in its current legal context

Havering’s published Checklist 004 retains the earlier 2024 rollout explanation. Its broad minor-application wording should not override the August 2026 exemptions and transitional provisions.

Check Checklist 004 alongside current national guidance and the live council submission requirements. Our BNG process guide explains the wider sequence.

Hierarchy / habitat match / registered allocation

Off-site biodiversity units for Havering developments

First establish the actual deficit and trading requirements. Then compare delivery options under the applicable gain hierarchy, including the 2026 provisions for qualifying minor development.

Registration is not available inventory

The research did not substantiate a named Havering gain site with currently available, suitable units and a dated seller offer. This does not prove that no supply exists.

Start with the official biodiversity gain-sites register. Check the registered boundary, habitat type, legal security and existing allocations, then ask the operator to confirm remaining stock and terms.

Check location and delivery risk

An off-site offer must match the habitat accounts and trading rules for the development. Location can affect the statutory metric’s spatial-risk calculation, so a cheaper distant unit may not meet the same shortfall.

Also check the delivery programme, responsible manager and long-term funding. Follow the official allocation procedure before relying on units in a Gain Plan.

Keep statutory credits separate

Government statutory biodiversity credits are a last-resort route under the applicable rules. They are different from privately supplied units, council monitoring contributions and professional survey fees.

Likewise, Thames Chase, an LNRS recovery area or a wetland restoration project is not automatically a registered habitat bank. Obtain scheme-specific evidence before committing funds.

2026/27 schedule / legal obligations / separate budgets

Havering planning and monitoring charges

Havering publishes general Section 106 monitoring charges. The research did not establish a separate universal BNG monitoring tariff, so confirm the category in the actual agreement.

Published S106 monitoring fees — April 2026 to March 2027
Council categoryPublished basis and qualification
Key non-financial obligation

£1,174 per obligation. This is a general S106 category, not an automatic charge for every development requiring BNG.

Fixed financial obligation

5% of total contributions, with a minimum fee of £1,174 and maximum of £46,941. Distinguish the contribution itself from the monitoring fee.

Financial obligation with future calculation

The schedule lists £1,174 per obligation and an additional 5% contribution-based element. Confirm the applicable terms and minimum/maximum treatment with the council; do not mechanically combine unrelated fee categories.

Confirmation of S106 discharge

£178 for confirmation whether obligations have been discharged. This is a separate enquiry charge, not approval of a Biodiversity Gain Plan.

Use the 2026/27 S106 monitoring fee schedule and council’s S106 procedure. Monitoring fees are payable on completion of the agreement. Confirm current charges and any VAT treatment before budgeting.

Budget for distinct work and commitments

The April 2026 national non-householder condition-approval fee is £309, including the applicable Gain Plan submission. This planning administration fee is separate from ecological consultancy, legal work, habitat delivery and monitoring.

Check the national fee schedule and statutory credit prices when relevant. Our BNG costs and pricing guide separates these cost categories; a site-specific quotation should define the professional scope.

Baseline / metric / gain plan / management

Discuss your Havering site with ACP

Send the address, red-line boundary, proposal and planning stage. Include existing ecological surveys, tree information and landscape drawings where available.

Our BNG consultants can scope the habitat assessment, metric options, Gain Plan and management evidence. Early review also helps identify seasonal survey needs and design dependencies.

For wider context, see BNG in London. Adjoining guides cover Barking and Dagenham and Redbridge. For projects across the Thames, see Bexley. Each authority has its own local policy context.

Send your Havering site details →

Local policy / river constraints / costs / delivery

Havering BNG questions

These answers focus on common borough-specific planning decisions. Use the dated source records for the full requirements and their limits.

Which Havering policies matter most for BNG?

Policies 29, 30 and 31 address green infrastructure, biodiversity and river corridors. Policies 27 and 32 can also affect landscape and flood design. Read these adopted local policies alongside national BNG rules and relevant London Plan requirements.

Does a site below 0.2 hectares always avoid BNG?

No. The August 2026 exemption depends on the application route and date, and excludes relevant impacts on on-site priority habitat. Also check original permissions and variations. Separate ecology, tree and protected-site requirements can still apply.

Do the river policies require an 8m or 16m buffer everywhere?

No. Policy 31’s setback provisions depend on the relevant watercourse or tidal river and flood-defence context. Establish the mapped asset, read the policy and obtain current authority advice before fixing a development boundary or landscape design.

Does the Urban Greening Factor prove a biodiversity gain?

No. UGF measures weighted surface greening, whereas the statutory metric assesses habitat value and change. Therefore, prepare separate calculations where both apply, using consistent landscape, roof, tree and drainage plans.

Are biodiversity units available within Havering?

No specific currently available allocation was substantiated in this research. This is not evidence that supply is absent. Check the live gain-sites register, habitat match, existing allocations and a dated operator offer before relying on units.

Is £1,174 a standard Havering BNG monitoring fee?

No. It is the published 2026/27 charge for a key non-financial S106 obligation. The applicable charge depends on the agreement and fee category. Consultant fees, national condition-approval charges and biodiversity units are separate costs.

When must the Biodiversity Gain Plan be approved?

Where the statutory gain condition applies, approval normally follows planning permission and precedes commencement. However, the original application still needs the required baseline and metric information. Address legal security and long-term management at the relevant stages.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.