London / Camden BNG guide

Biodiversity Net Gain in Camden

Biodiversity net gain in Camden starts with understanding the site: its gardens, trees, roofs, railway edges and connections to wider habitats.

Navigate adopted policy, current application requirements and London’s nature-recovery map. Use local evidence to plan a credible assessment, habitat design and delivery route.

Evidence reviewed 5 November 2026 · Local Plan modifications consultation closes 23 November 2026.

National, London and neighbourhood requirements

Which policies apply to a Camden proposal?

Camden Council is the local planning authority. Its Local Plan, adopted on 3 July 2017, remains the adopted borough plan. Read it with the London Plan 2021 and any adopted neighbourhood plan covering the site.

First locate the red-line boundary and relevant designations. Managing an open space does not necessarily make its owner the planning authority. For example, the City of London Corporation manages Hampstead Heath, while borough boundaries still matter for planning.

National BNG: confirm whether the duty applies

In-scope development must achieve at least 10% gain using the statutory biodiversity metric. The final Biodiversity Gain Plan requires approval before development starts. Significant on-site enhancements and registered off-site gains need at least 30 years of secured management.

The exemptions changed from 6 August 2026, including a conditional route for sites no larger than 0.2 hectares. Check priority habitat, application dates and the full statutory tests. Review the current exemptions.

A3: biodiversity, corridors and construction

Policy A3 protects designated sites, priority habitats and species. It also addresses other valuable features, including gardens. Parts d–h cover design benefits, green corridors, access to nature, construction effects and management.

Therefore, explain how the layout retains and connects habitats before presenting the metric result. A numerical gain does not remove an unacceptable effect on a protected site. Read A3, pages 200–201.

A3: trees are part of the early layout

Parts j–m address valuable trees and vegetation, protection during works, justified replacement and additional planting. These requirements apply alongside habitat calculations.

Coordinate arboricultural evidence with ecology, access and drainage. Replacement trees need enough soil and space to reach the condition assumed in the design. Consult the Trees CPG and A3’s tree provisions.

A2, CC2 and CC3: coordinate land and water

A2 protects open space and green infrastructure. CC2 covers climate adaptation, including appropriate biodiverse roofs and SuDS. CC3 addresses flood risk, water quality and sustainable drainage.

For basement proposals, A5 also matters. Check excavation, retained garden soils, roots and groundwater together. A planted roof should support its ecological, drainage and maintenance functions in practice. Read the adopted policies.

London Plan: keep UGF and BNG distinct

G1 supports connected green infrastructure; G5 addresses urban greening. G6 protects biodiversity and access to nature, while G7 covers trees and woodland.

For relevant major schemes, assess the Urban Greening Factor alongside habitat units. A satisfactory UGF score does not demonstrate 10% BNG. Both calculations must correspond to the same landscape design. Read the adopted London policies.

Neighbourhood plans add local detail

The Hampstead Neighbourhood Plan 2025–2040 was adopted on 21 July 2025. It supersedes the 2018 version and includes appendices on open spaces, biodiversity corridors and ecological networks.

Check the designated neighbourhood area before applying its provisions. Other Camden neighbourhood plans cover different places and constraints; a borough-wide checklist cannot replace that location check. Open the current Hampstead plan and adoption record.

The replacement Camden Local Plan is still emerging. Main modifications are under consultation from 12 October to 23 November 2026. Draft NE2 addresses biodiversity and NE3 trees; do not present them as adopted requirements. Check the consultation · Read the proposed nature policies.

October 2026 application requirements

Build a consistent ecology submission

The council’s validation gateway records a publication date of 20 October 2026. The linked requirements distinguish biodiversity surveys, statutory metric evidence and exemption evidence. Check this current version before submitting.

Selected submission prompts from Camden’s current local requirements
Site or proposalEvidence to prepare
On or next to a designated wildlife siteStart with a habitat assessment. Assess relevant protected or priority species and effects on the designation, including effects beyond the red line.
A habitat corridor, missing link or canal-side siteReview connectivity, lighting, construction disturbance and opportunities to improve the link. Compare local records with the actual proposal.
Potential species habitat in buildings, trees or vegetationScope the necessary surveys early enough for the planning decision. A statutory BNG exemption does not remove protected-species responsibilities.
A proposal within the statutory BNG regimeProvide the applicable metric workbook, baseline habitat plan and supporting evidence. Explain the design and intended delivery route.
An exemption claimIdentify the precise exemption and provide proportionate supporting plans or evidence. Check current national rules, particularly for transitional and section 73 cases.

Read pages 22–24 of the local application requirements. Use the Small Sites Metric only where its national eligibility rules allow it. A council checklist is a submission guide, not a substitute for the current legislation or metric rules.

Use the adopted Biodiversity CPG carefully

The March 2018 guidance explains assessment, avoidance, mitigation, compensation and enhancement. Its appendices provide survey triggers, seasonal information and local site citations.

It predates mandatory BNG and the 2026 changes. Retain its useful local evidence, but apply current national requirements to exemptions, metrics and the gain hierarchy. Read the Biodiversity CPG.

Connect the application strategy to delivery

A design-stage metric does not replace the final Biodiversity Gain Plan. Resolve any shortfall, legal security and registered allocations before seeking gain-plan approval.

Where required, prepare the Habitat Management and Monitoring Plan with named responsibilities, prescriptions, reporting and remedial actions. Make it consistent with roof access, drainage maintenance and landscape drawings.

London Local Nature Recovery Strategy

Explore four mapped priorities in Camden

The Mayor is London’s LNRS responsible authority. The published March 2026 strategy and April 2026 open spatial data identify potential measures across Camden. Use the map as a starting point for site-specific investigation.

Camden boundary and four London nature recovery priority locationsSelect a numbered location or use the matching text links. These published potential measures are not habitat boundaries or sites with units for sale.1234N ↑

Published opportunities / local context

Follow a priority into the evidence

Select a numbered marker or its text link: Woodland — PM3427, Lowland meadow — PM2655, Reedbeds — PM856, Parks and open spaces — PM2956.

Each marker represents a point within an opportunity polygon. It does not show a habitat boundary, a development allocation or land with units for sale.

1. Woodland — PM3427

The northern mapped opportunity highlights woodland recovery. Inspect the full polygon and existing woodland records before choosing a planting or management intervention. Protect ancient habitat and veteran features first; new planting cannot reproduce irreplaceable habitat.

Inspect the published measure and its extent

2. Lowland meadow — PM2655

The north-western opportunity illustrates the value of grassland within a fragmented urban landscape. Test soils, current vegetation, cutting arrangements and public use. A species-rich seed mix needs a credible establishment and long-term management plan.

Inspect the published measure and its extent

3. Reedbeds — PM856

This eastern example highlights wetland opportunities within a wider mapped area. Confirm water depth, quality, seasonal variation and maintenance access. The marker is not evidence that reedbed already exists at a proposed development site.

Inspect the published measure and its extent

4. Parks and open spaces — PM2956

The southern example points to nature recovery within densely developed Camden. Consider connected planting, varied structure and reduced disturbance. Balance ecological aims with public access and the actual space available.

Inspect the published measure and its extent

Compare the full Local Habitat Map with the red-line site and the proposed intervention. Then apply the current statutory metric rules for strategic significance. A nearby priority or a green-looking map alone does not justify an uplift. Read London’s strategy and the metric guidance.

Boundary: ONS Local Planning Authorities, January 2026, Camden LPA E60000343. Contains public sector information licensed under OGL v3.0; Crown copyright and database right 2026. Opportunities: GiGL/GLA London LNRS, April 2026 open data. Boundary source · Nature-recovery data and licensing.

Habitats, networks and constrained urban sites

Match the ecological response to the place

Camden combines extensive northern open spaces with dense central neighbourhoods. Local records help scope a survey, but they do not establish which habitats or species occur on an individual parcel.

Hampstead Heath, Kenwood and the northern edge

Hampstead Heath Woods is Camden’s SSSI. The wider Heath and Kenwood landscape includes woodland, grassland, ponds and veteran trees. Boundaries, buffers and habitat condition matter more than a general “near the Heath” description.

Assess construction access, light spill and hydrological effects where relevant. Check irreplaceable habitats separately from ordinary metric compensation. Read Camden’s designated-site evidence · Irreplaceable-habitat guidance.

West Hampstead, Gospel Oak and railway corridors

The Biodiversity CPG records the West Hampstead railsides, Medley Road Orchard and Westbere Copse network. It also identifies Kentish Town City Farm and Gospel Oak railsides.

For nearby development, investigate edges, retained vegetation and connections across adjoining land. Railway safety, access and operational constraints can affect what habitat management is feasible. Consult the local site citations.

Regent’s Canal, King’s Cross and Camley Street

The canal and Camley Street Natural Park connect nature with a heavily developed area. Water margins, vegetation and dark routes can require careful treatment even where the development itself is largely hardstanding.

Coordinate lighting, water quality, drainage and maintenance with the relevant land manager. Do not assume that canal works automatically generate transferable watercourse units. Read the canal and nature-park citations.

Holborn, Bloomsbury and smaller urban spaces

Gardens, squares, roofs and planted courtyards can form stepping stones through dense development. Their value depends on habitat structure, disturbance and connections, rather than ornamental coverage alone.

Test substrate depth, drought resilience, irrigation and maintenance access before relying on a roof in the metric. Camden’s CC2 policy supports appropriate biodiverse and combined green-blue roofs. Read the climate-adaptation policy.

Camden’s January 2022 biodiversity strategy and its local Nature Recovery Network complement London’s statutory LNRS. The live action table programmes revised Biodiversity/BNG guidance by the end of 2026 and a State of Camden’s Nature report by January 2027. These are planned outputs, not evidence of completion. Check the action programme.

Planning and habitat-delivery evidence

What Camden projects reveal about delivery

Read the stage of each record carefully. A committee forecast, a completed landscape intervention and a registered allocation provide different forms of evidence.

120–136 Camley Street: test the absolute units

For application 2025/4341/P, the January 2026 report gives a 0.48-unit baseline and a proposed 2.43 habitat units. It reports a 409.7% uplift. The rounded figures should not be used to reconstruct the underlying calculation.

A large percentage can reflect a small baseline. Review the actual habitat areas and condition assumptions. The report also assesses UGF separately, illustrating why greening and BNG need distinct evidence. Read paragraphs 20.13–20.17.

A resolution still needs its delivery documents

On 29 January 2026, the committee resolved to grant the Camley Street scheme subject to Mayoral referral, final conditions and a shadow section 106 agreement. The report proposed a gain plan, HMMP and completion evidence.

That record does not prove later condition discharge or completed habitat delivery. Check the final decision and approved documents for a live project. Read the committee minutes · Proposed conditions 23–25.

Camley Street rain garden: design for several functions

The December 2025 scrutiny evidence describes a rain garden installed in 2020: approximately 2 metres wide and 180 metres long. It links drainage benefits with biodiversity and contact with nature.

The useful lesson is to reserve adequate space and maintenance access for multifunctional planting. This is project evidence, not a registered unit offer or proof of statutory BNG compliance. Read the council’s SuDS example.

Aberdare Gardens: an allocation is a separate record

The gain-site register records 0.07 area units allocated to Flat 1, 67 Aberdare Gardens, application 2025/3418/P. The allocation sits within BGS-270825001, a site outside Camden.

This demonstrates a documented off-site route, not the current availability of equivalent units. It also does not prove final gain-plan approval or establish the exemption position of a different application. Inspect the official allocation.

Registered delivery and a realistic budget

Compare off-site units on evidence, location and cost

Camden’s constrained sites may require a combination of habitat design and off-site delivery. Determine the shortfall by habitat category, then check a supplier’s location, legal security and unallocated stock.

Woodoaks Farm, Maple Cross, Hertfordshire

Natural Asset Partners identifies Woodoaks Farm at Maple Cross, working with the Soil Association Land Trust. The landowner links its offer to BGS-270825001. The official register records 53.53 hectares at TQ0269193573.

Woodoaks describes meadow, hedgerow and woodland restoration and advertises units, including fractions. Obtain current availability directly: a published offer and a registered area are not a guaranteed unit balance. View the landowner’s offer · Project location and partnership.

Check the spatial-risk calculation

Woodoaks identifies Three Rivers LPA and the Thames Valley National Character Area. Test the exact development and gain-site parcels against the statutory metric’s location rules. A “London” market description does not settle the multiplier.

Area habitats, hedgerows and watercourses have different considerations. Verify the unit category and trading rules before reserving a parcel. Read the current off-site guidance · Registered land boundary.

Follow the applicable gain hierarchy

Avoid and mitigate harm first. For qualifying non-major applications under the August 2026 changes, on-site enhancement, creation and registered off-site compensation have equal preference at the compensation stage. Statutory credits remain last.

Confirm which rules and transitional provisions apply to the application. Use off-site biodiversity unit guidance to organise supplier checks and national planning guidance for the relevant hierarchy.

Agree responsibilities before gain-plan approval

Identify who creates, manages and monitors each habitat, and who funds remedial work. Match the final metric to the registered allocation and legal documents.

The council’s adopted charging framework allows separate legal and monitoring costs. No current borough-wide BNG-specific tariff was verified for this guide; that does not mean monitoring is free. Read paragraphs 6.7–6.16.

Keep Camden BNG cost categories separate
Cost categoryWhat to establish
Council chargesThe adopted Developer Contributions CPG separates legal and preparation charges from the costs of processing and monitoring. Its printed October 2018 amounts are historical. Request the current schedule and the project’s specific BNG monitoring scope.
Private off-site unitsObtain a dated quotation for the habitat type, quantity and allocation needed. Confirm tax, transaction costs and contractual responsibilities. No current public unit price for the Woodoaks offer was verified.
Habitat work and careAllow for soils, planting, roof access, replacement, inspections and remedial work. For secured statutory gains, cost the relevant long-term obligations rather than only the initial landscape contract.
Statutory creditsThese are a last-resort government route, distinct from private habitat units. Use the current official price schedule and credit rules after demonstrating that suitable on-site and off-site options cannot meet the obligation.

Check the current statutory credit schedule before relying on a credit budget. Supplier prices, consultant fees, council charges and habitat management are separate costs.

A practical project sequence

Your Camden planning evidence checklist

Use these prompts alongside the council’s current requirements. The checkboxes are a reading aid; ticking them sends no information to ACP or the council.

Before submitting

  • Confirm Camden’s red-line boundary, designations and adopted neighbourhood plan. Record the application date and the reason statutory BNG applies or an exemption is claimed.

  • Review habitats, trees, buildings, gardens, nearby corridors and the canal where relevant. Programme seasonal surveys before decisions that depend on their results.

  • Use the eligible statutory tool, habitat plans and condition evidence. Explain earlier baseline dates, degradation and irreplaceable habitats where applicable.

From design to delivery

  • Align ecology, UGF, arboriculture, SuDS, lighting, structural capacity and maintenance access. Avoid promising habitats that the construction drawings cannot accommodate.

  • Confirm shortfalls, unit types, spatial risk, legal agreements and allocations. Separate council charges from habitat management and private unit purchase costs.

  • Where required, secure Biodiversity Gain Plan approval before starting. Deliver the approved habitats and maintain the agreed monitoring, reporting and remedial arrangements.

Qualifying nationally significant infrastructure applications entered a separate BNG regime on 2 November 2026. Do not assume that every Euston or rail-related proposal follows the ordinary borough application route. Check the infrastructure guidance.

Assessment and local evidence

Bring the evidence into your Camden BNG strategy

ACP can help with habitat surveys, metric calculations and planning evidence. Share the site address, red-line plan, application stage and existing ecology reports through the approved enquiry form below.

Follow the relevant geographic connections

Use the London hub for strategic policy and borough navigation, and the England guide for national context. Where a site or ecological connection crosses a boundary, consult Barnet, Brent or Islington as relevant.

Track the current policy changes

Camden’s October 2026 modifications include changes to draft NE2 wildlife measures and planting wording, and NE3 supporting text. Check the final adopted version when available; consultation text can still change. Read MM121–MM123.

The replacement London Plan also remains emerging following consultation ending 15 October 2026. Check the London programme before finalising a planning statement.

Practical local questions

Camden BNG questions

These answers distinguish adopted policy, current application requirements and documented delivery evidence.

Is Camden’s new Local Plan already adopted?

No. The council identifies the July 2017 Local Plan as adopted. The replacement plan’s main modifications are under consultation from 12 October to 23 November 2026. Draft NE2 and NE3 should be identified as emerging policy, with their weight assessed for the application.

Does a BNG exemption remove Camden’s ecology requirements?

No. Protected species, designated sites, trees, gardens and local policy can still require assessment. Document the relevant statutory exemption separately from the ecological evidence needed to assess the proposal.

Can a green roof satisfy both UGF and BNG?

It can contribute to both calculations where appropriate, but the results are not interchangeable. Confirm the habitat type, substrate, condition assumptions, drainage, access and long-term maintenance. A UGF score alone does not establish a biodiversity-unit gain.

Where have off-site units been allocated to a Camden scheme?

The official register records 0.07 area units at BGS-270825001 for Flat 1, 67 Aberdare Gardens, application 2025/3418/P. The registered site is Woodoaks Farm in Hertfordshire. This is allocation evidence, not proof of available stock or final gain-plan approval.

What is Camden’s BNG monitoring fee?

A current borough-wide BNG-specific tariff was not verified. The adopted Developer Contributions CPG separates legal costs and monitoring charges, but its printed 2018 figures are historical. Ask the council for the current project-specific charges and monitoring scope.

Does the LNRS map prove which habitat is on my land?

No. It identifies potential nature-recovery measures and their mapped extent. Use current site surveys to establish baseline habitats. Apply the metric’s strategic-significance rules to the relevant location and intervention, rather than assuming an automatic uplift.

Talk to ACP   /   Site enquiries

What does your site need next?

Tell us where the site is, what you plan to build and how far the application has progressed. We’ll use that context to discuss the surveys, calculations or plans your project needs.

What to have to handA red-line plan, an existing ecology report or a request from the council can help us scope the work. Start with whatever you already have.

Request a site-specific quotation

Start with the information you have. We ask for your email, site location and enquiry, with a telephone number at the final step.

STEP 1 OF 3

Where should we reply?

Start with your email. We will ask for your site location and project details next.

STEP 2 OF 3

Where is your site?

Add the address if you have it. These fields are optional.

STEP 3 OF 3

Tell us what you are planning

Share your proposal and the advice you need, then add your contact details.

We use your details to respond to your enquiry. Read our Privacy Policy.

Evidence and further reading

Sources behind this guide

Reviewed 5 November 2026. Adopted policy, emerging proposals, project forecasts and registered allocations are distinguished throughout. No ACP involvement in the cited projects is claimed.

Camden policies and application evidence

Nature recovery, delivery and costs

National and London framework